Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-97-5348, Forwards Assessment on Surge Line Flooding Effect on Low Power & Shutdown Risk in Response to 970905 Telcon Request + (09:46:47, 23 May 2025)
- TAC:69727 + (09:46:52, 23 May 2025)
- 05000352/LER-1998-004, :on 980320,missing Fire Dampers in Safe Shutdown Barriers Were Noted.Caused by Inadequate Design Review of Initial Fire barrier.Fire-watches Previously Established for Thermo-lag Issues Were Verified + (09:46:55, 23 May 2025)
- IR 05000456/1997022 + (09:47:04, 23 May 2025)
- IR 05000254/1997014 + (09:47:08, 23 May 2025)
- IR 05000456/1997005 + (09:47:13, 23 May 2025)
- ML20217C301 + (09:47:28, 23 May 2025)
- 05000443/LER-1998-002-01, Forwards LER 98-002-01 Re Event That Occurred on 980113 at Seabrook Station.Suppl LER Being Submitted to Retract LER 98-002-00.Util Determined That Condition Described in LER 98-002-00 Not Reportable Per 10CFR50.73 + (09:47:29, 23 May 2025)
- ML20217C296 + (09:47:31, 23 May 2025)
- 05000219/LER-1998-001-01, :on 980216,core Spray/Automatic Depressurization Sys Contacts Were Not Tested by Procedure. Caused by Inadequate Testing Procedures.Required Contact Verifications & Testing Was Completed + (09:47:39, 23 May 2025)
- ML20217C268 + (09:47:45, 23 May 2025)
- TAC:M97781 + (09:47:49, 23 May 2025)
- ML20217C148 + (09:48:18, 23 May 2025)
- ML20217C102 + (09:48:27, 23 May 2025)
- DD-98-01, Forwards Directors Decision DD-98-01 Denying AA Cizek 970303 Petition,Filed Per 10CFR2.206,to Modify Licenses by Placing Certain Conditions on OLs + (09:48:47, 23 May 2025)
- ML20217C000 + (09:48:57, 23 May 2025)
- ML20217B938 + (09:49:10, 23 May 2025)
- DD-97-21, Partial Directors Decision DD-97-21 Denying Request for Immediate Suspension or Revocation of Licenses & Granting Request for Investigation of Possible Matl Misrepresentations,In Response to 961125 & 1223 Petitions + (09:49:18, 23 May 2025)
- ML20217B843 + (09:49:49, 23 May 2025)
- L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program + (09:50:13, 23 May 2025)
- DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 + (09:50:35, 23 May 2025)
- ML20217B658 + (09:50:45, 23 May 2025)
- IR 05000424/1990019 + (09:50:56, 23 May 2025)
- IR 05000155/1997015 + (09:51:09, 23 May 2025)
- IR 05000254/1997026 + (09:51:11, 23 May 2025)
- IR 05000266/1997026 + (09:51:19, 23 May 2025)
- NUREG-1512, Provides Advisory Committee on Reactor Safeguards with Attached Suppl to AP600 FSER for Consideration.Suppl FSER Documents Staff Review of Changes to AP600 Design Documentation Since Issuance of FSER NUREG-1512 + (09:51:26, 23 May 2025)
- ML20217B495 + (09:51:29, 23 May 2025)
- IR 05000271/1997010 + (09:52:03, 23 May 2025)
- DD-97-19, Partial Directors Decision DD-97-19,deferring in Part & Denying in Part,Citizens Awareness Network & Nirs 970311 Petition to Commence Enforcement Action Against Util & Impose Civil Penalty + (09:52:41, 23 May 2025)
- 05000461/LER-1997-035-01, Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed + (09:52:49, 23 May 2025)
- ML20217B224 + (09:52:54, 23 May 2025)
- L-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions + (09:53:16, 23 May 2025)
- ML20217B128 + (09:53:24, 23 May 2025)
- ML20217B059 + (09:53:38, 23 May 2025)
- TXX-9109, Annual Operating Rept & Annual 10CFR50.59 Rept for 1990 + (09:54:29, 23 May 2025)
- L-97-009, Application for Amends to Licenses NPF-66 & NPF-73,changing TS to Implement line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS + (09:54:31, 23 May 2025)
- TAC:M97388 + (09:54:33, 23 May 2025)
- ML20217A935 + (09:54:41, 23 May 2025)
- ML20217A854 + (09:55:09, 23 May 2025)
- IR 05000275/1998008 + (09:55:20, 23 May 2025)
- ML20217A828 + (09:55:30, 23 May 2025)
- 05000498/LER-1997-013-01, Forwards LER 97-013-01,re Failure to Meet TS Leak Rate Requirements for Supplementary Containment Purge Supply Isolation Valve + (09:55:31, 23 May 2025)
- 05000213/LER-1996-016-01, Forwards LER 96-016-01 & LER 96-027-01,retracting Originally Proposed Corrective Actions That Will No Longer Be Implemented as Result of CYAPCO Decision to Cease Operations at Haddam Neck Plant + (09:56:11, 23 May 2025)
- TAC:M99243 + (09:56:25, 23 May 2025)
- TAC:77726 + (09:56:32, 23 May 2025)
- IR 05000277/1997005 + (09:56:39, 23 May 2025)
- ML20217A654 + (09:56:40, 23 May 2025)
- IR 05000335/1990025 + (09:56:41, 23 May 2025)
- 05000219/LER-1998-011-02, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts + (09:56:50, 23 May 2025)
- IR 05000348/1998300 + (09:59:02, 23 May 2025)