Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:65107 + (01:46:24, 23 May 2025)
- ML20237B232 + (01:46:26, 23 May 2025)
- 05000361/LER-1998-016, :on 980710,EDG Fuel Storage Tank Volume Was Noted Outside of Design Basis.Cause Has Not Been Determined Because of Passage of Time.Revised Alarm Response Procedure + (01:46:39, 23 May 2025)
- 05000414/LER-1998-003-04, :on 980713,channel 3 Overtemperature Delta T Setpoint Exceeded Allowable Value Which Resulted in TS 2.2.1 Violation.Caused by Inadequate Procedure.Procedure Was Corrected & Channel Was Recalibrated + (01:49:14, 23 May 2025)
- ML20237B122 + (01:49:19, 23 May 2025)
- ML20237B120 + (01:49:21, 23 May 2025)
- ML20237B118 + (01:49:22, 23 May 2025)
- DD-87-19, Notice of Issuance of Final Directors Decision DD-87-19 Denying Gap 870507 Petition on Behalf of Safe Energy Coalition of Michigan & Sisters,Servants of Immaculate Heart of Mary Congregation Re Safeteam Program + (01:49:28, 23 May 2025)
- IR 05000245/1998208 + (01:51:00, 23 May 2025)
- TAC:61519 + (01:51:20, 23 May 2025)
- NUREG-0588, Responds to 870709 Request for NRR Assistance in Determining Adequacy of Two Test Repts Re Acceptance Criteria of NUREG-0588,Category I.Qualification of Kulka Terminal Blocks Demonstrated & Not Used in Instrumentation Circuits + (01:51:29, 23 May 2025)
- TAC:66377 + (01:51:31, 23 May 2025)
- ML20237B027 + (01:51:43, 23 May 2025)
- IR 05000302/1998301 + (01:51:45, 23 May 2025)
- ML20237B023 + (01:51:48, 23 May 2025)
- ML20237B015 + (01:51:51, 23 May 2025)
- 05000302/LER-1998-008, :on 980716,identified Three Components in Nuclear Svcs & Decay Heat Seawater Sys That Did Not Meet Requirements of ASME Code Section Xi.Caused by Personnel Error.Plant Engineering Performed Operability Determination + (01:51:59, 23 May 2025)
- IR 05000344/1987040 + (01:52:10, 23 May 2025)
- 05000458/LER-1998-004-03, :on 980514,noted That Surveillance Test Had Not Been Completed for Primary Containment Leakage Rate Testing Program.Caused by Lack of Proper Emphasis on Procedure Step Re Summation.Revised Pertinent Surveillance Procedures + (01:52:13, 23 May 2025)
- IR 07100018/2011021 + (01:52:24, 23 May 2025)
- IR 05000458/1987028 + (01:52:52, 23 May 2025)
- IR 05000445/1984032 + (01:53:03, 23 May 2025)
- TAC:M83646 + (01:53:04, 23 May 2025)
- IR 05000445/1986003 + (01:53:06, 23 May 2025)
- ML20237A757 + (01:53:17, 23 May 2025)
- L-98-009, Forwards Revised Us Enrichment Corp Avlis Enrichment Plant QA Program Description, Per Request of NRC + (01:53:39, 23 May 2025)
- ML20237A637 + (01:53:48, 23 May 2025)
- ML20237A631 + (01:53:51, 23 May 2025)
- IR 05000293/1987035 + (01:54:27, 23 May 2025)
- IR 05000413/1987030 + (01:54:50, 23 May 2025)
- ML20237A470 + (01:54:59, 23 May 2025)
- ML20237A469 + (01:55:02, 23 May 2025)
- ML20237A456 + (01:55:10, 23 May 2025)
- IR 05000029/1987006 + (01:55:15, 23 May 2025)
- IR 05000352/1998005 + (01:56:06, 23 May 2025)
- IR 05000424/1987064 + (01:56:12, 23 May 2025)
- IR 05000293/1998004 + (01:56:13, 23 May 2025)
- TAC:66007 + (01:56:14, 23 May 2025)
- ML20237A285 + (01:56:17, 23 May 2025)
- 05000324/LER-1998-002-03, :on 980708,excessive FW Temp Reduction as Result of Loss of Stator CW W/Main Turbine Runback Was Noted.Caused by Failure to Analyze at Time of Plant Design. Established Control to Limit Max Average Planar Ratio Limit + (01:56:47, 23 May 2025)
- ML20237A143 + (01:56:49, 23 May 2025)
- 05000423/LER-1998-036, :on 980710,ESF Building Sump Pump Design Deficiencies Were Noted.Caused by Lack of Appropriate Level of Project Mgt Attention.Corrected Design Deficiencies + (01:56:56, 23 May 2025)
- 05000498/LER-1998-003, :on 980706,licensee Failed to Meet Requirements of TSs Due to Inoperable CR Mu & Cleanup Filtration Sys Exceeding Aot.Caused by Inability to Maintain Haldide Detector Instrument.Developed Calibration Technique + (01:57:26, 23 May 2025)
- L-98-204, Submits 90-day Response to GL 98-01, Yr 2000 Readiness of Sys at Nuclear Power Plants. Util Plans to Provide Required Confirmation or Status of Y2K Program No Later than 990701 + (01:57:40, 23 May 2025)
- NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 + (01:57:52, 23 May 2025)
- ML20236Y532 + (01:58:00, 23 May 2025)
- ML20236Y519 + (01:58:04, 23 May 2025)
- IR 05000413/1987037 + (01:58:14, 23 May 2025)
- 05000382/LER-1998-008-01, Forwards LER 98-008-01,updating Info Re Potential for Concurrent Reduced Cooling Capacity in Both Trains of Ecw Sys.Revs Are Annotated W/Vertical Change Bars in right-hand Margin + (01:58:16, 23 May 2025)
- ML20236Y456 + (01:58:18, 23 May 2025)
- TAC:M99842 + (01:58:19, 23 May 2025)