Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:MA0184 + (01:09:03, 23 May 2025)
- NUREG-0849, Informs That General Atomics Radiological Contingency Plan for Training & Familiarization Onsite for Offsite Response Organizations Acceptable & Approved by Nrc.Changes Were Revised Using NUREG-0849 + (01:09:05, 23 May 2025)
- IR 05000331/1998301 + (01:09:54, 23 May 2025)
- ML20237D829 + (01:09:59, 23 May 2025)
- IR 05000461/1998009 + (01:10:19, 23 May 2025)
- IR 05000456/1998008 + (01:11:17, 23 May 2025)
- IR 05000440/1998013 + (01:11:19, 23 May 2025)
- IR 05000266/1998011 + (01:11:23, 23 May 2025)
- IR 05000282/1998010 + (01:11:27, 23 May 2025)
- IR 05000254/1998012 + (01:11:43, 23 May 2025)
- TAC:M72401 + (01:11:55, 23 May 2025)
- ML20237D594 + (01:12:17, 23 May 2025)
- NUREG/CR-5500, Discusses Issuance of Final Rept, Reliability Study Auxiliary Emergency Feedwater System 1987-1995, (NUREG/CR-5500,Vol 1).Summary of Comment Resolutions Encl + (01:12:19, 23 May 2025)
- ML20237D499 + (01:12:47, 23 May 2025)
- IR 05000424/1987056 + (01:12:53, 23 May 2025)
- NUREG-0798, Advises That NRC Review of Sys Leakage Reduction Test Results Cannot Be Completed Until Final Test Procedures & Acceptance Criteria Upon Which Sys Test Results Based Submitted & Reviewed + (01:12:59, 23 May 2025)
- ML20237D471 + (01:13:03, 23 May 2025)
- ML20237D467 + (01:13:05, 23 May 2025)
- IR 05000498/1987070 + (01:13:13, 23 May 2025)
- IR 05000213/1998003 + (01:13:35, 23 May 2025)
- ML20237D383 + (01:13:56, 23 May 2025)
- ML20237D352 + (01:14:06, 23 May 2025)
- A06649, Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls Revised + (01:14:12, 23 May 2025)
- B12777, Forwards Addl Info for 861222 Amend Request for 40-yr Ol,Per NRC 871210 Request.Extent & Effectiveness of Util ALARA Programs at Other Plants Evident When Reviewing Encl Chronology Program & Achievements to Date + (01:14:19, 23 May 2025)
- NSD-NRC-97-5046, Submits Rev 1 of W Ltr Originally Submitted 970917,which Transmitted Proprietary & non-proprietary Informal Correspondence.Rev Includes Notarized Affidavit as Part of Application for Withholding Info.Proprietary Info Withheld + (01:14:39, 23 May 2025)
- 05000382/LER-1998-015, :on 980724,discovered That T-ring Rubber Seat on CR Normal Outside Air Intake Downstream Isolation Valve Was Incorrectly Installed.Caused by Inadequate Info in Vendor Manual.Reworked Valves to Correct Configuration + (01:14:45, 23 May 2025)
- 05000461/LER-1998-021, :on 980220,cracks in Medium & High Density Silicone Penetration Seals Were Not Per Design Basis.Caused by Design Error.Inspected Potentially Affected Seals & Repaired Seals as Necessary + (01:15:01, 23 May 2025)
- 05000266/LER-1998-024, :on 980721,inadvertent EDG Start Was Noted. Caused by Installation of Electrical Jumper Wire.Removed Temporary Jumper Wire & Revised Operating Procedure + (01:15:42, 23 May 2025)
- IR 05000312/1987026 + (01:15:44, 23 May 2025)
- ML20237D155 + (01:15:54, 23 May 2025)
- 05000336/LER-1998-005-01, Forwards LER 98-005-01 Re HELB Deficiencies for Piping Inside Containment on 980318.Commitments,encl + (01:16:18, 23 May 2025)
- 05000341/LER-1998-004, :on 980818,manual Scram Occurred in Response to Reactor Power Flunctuations.Caused by Unstable Flow Through Number 4 Hpt Cv.Reviewed Data from 1996 to Present Re Plant Operation Between 60% & 70% Power + (01:16:49, 23 May 2025)
- 05000412/LER-1998-008-03, Forwards LER 98-008-03 Re GL 96-01 TS Instrumentation Surveillance Inadequacies.Rept Is Submitted IAW 10CFR50.73(a)(2)(i) + (01:16:59, 23 May 2025)
- IR 015000028/1998001 + (01:17:11, 23 May 2025)
- 05000334/LER-1998-014, :on 980309,failure to Comply W/Ts Surveillance Requirement 4.4.9.2.3,was Noted.Caused by Inadequate Application/Understanding Re TSs & Regulatory Compliance. Revised or Verified Procedures + (01:17:16, 23 May 2025)
- 05000412/LER-1998-007, :on 980409,inadequate BVPS Procedures Were Performed to Ensure Compliance W/Ts.Caused by Inadequate Training of Procedure Writers.Procedure Reviews & Revs Will Be Incorporated in TS Where Necessary + (01:17:25, 23 May 2025)
- 05000413/LER-1998-011, :on 980723,discovered That Two RWST Level Channels Were Inoperable.Caused by Ground Currents from Lightning Strikes.Level Transmitters Were Replaced & Recalibr & Initiated Compensatory Measures + (01:17:27, 23 May 2025)
- 05000341/LER-1996-005-01, Forwards LER 96-005-01 Re EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Commitments Made by Util, Listed + (01:17:39, 23 May 2025)
- IR 05000220/1998003 + (01:18:00, 23 May 2025)
- ML20237C841 + (01:18:05, 23 May 2025)
- 05000293/LER-1997-025-01, Forwards LER 97-025-01 Re Completion of Required Shutdown Due to Two Inoperable Msivs.Ltr Revises Related Commitment for Corrective Action Previously Reported in Beco Ltr 2.98.026,dtd 980309.Revised Corrective Action,Listed + (01:18:12, 23 May 2025)
- ML20237C814 + (01:18:16, 23 May 2025)
- TAC:MA2023 + (01:18:34, 23 May 2025)
- IR 05000298/1987001 + (01:18:44, 23 May 2025)
- ML20237C702 + (01:18:51, 23 May 2025)
- IR 05000313/1986006 + (01:18:55, 23 May 2025)
- IR 05000254/1987030 + (01:19:04, 23 May 2025)
- TXX-9818, Forwards Monthly Operating Repts for July 1998 for CPSES, Units 1 & 2.During Reporting Period,No Failures or Challenges to PORVs & SVs Occurred + (01:19:06, 23 May 2025)
- ML20237C657 + (01:19:12, 23 May 2025)
- ML20237C656 + (01:19:13, 23 May 2025)
- 05000498/LER-1997-010, :on 970920,discovered That MSSV Was Not Meeting Required Relief Capacity.Caused by Inadequate Resolution of Issues Re Valve Assembly During Unit 1 Sixth Refueling Outage.Revised MSSV Reassembly Procedure + (01:19:24, 23 May 2025)