Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19351A462 + (23:42:31, 23 December 2024)
- LD-89-123, Application for Amend to License SNM-33,to Possess Radioactive Calibr Sources for Use in Gamma Spectroscopy in Production Processes at Revitalized Hematite Facility.Fee Paid + (23:42:33, 23 December 2024)
- 05000336/LER-1989-010-02, :on 891109,determined That All Three Svc Water Pump Discharge Strainers Unqualified for Appropriate Seismic Criteria.Caused by Design Deficiency for Original Installation.New Pipe Support Installed + (23:42:37, 23 December 2024)
- 05000293/LER-1989-034, :on 891108,determined That Reactor Pressure Exceeded 150 Psig on 891107 W/O Performing Surveillance Procedure 8.5.4.4, HPCI Valve Operability Test. Caused by Personnel Error.Procedure Initiated + (23:42:39, 23 December 2024)
- 05000364/LER-1989-014, :from 891115-16,Tech Spec 3.0.3 Entered Voluntarily to Repair Leaking Containment Purge Isolation Dampers.Caused by Need to Repair Dampers.Dampers Closed & Automatic Isolation Feature Restored + (23:42:42, 23 December 2024)
- 05000312/LER-1989-012, :on 891113,control Room Alarms Received Indicating That All Four Channels of Radiation Monitor R-15045 Experienced Loss of Sample Flow.Caused by Personnel Error.Sample Flow Reinstated + (23:42:45, 23 December 2024)
- 05000317/LER-1989-020, :on 891113,determined That Some Solenoid Valves & Valve Power Supplies for Saltwater Sys May Not Be Able to Perform Design Function After Design Basis Seismic Event. Cause Undetermined.Power Supplies Upgraded + (23:42:48, 23 December 2024)
- 05000285/LER-1989-020, :on 891012,determined That Two of Four Component Cooling Water HXs Simultaneously Inoperable for More than 24 H.Caused by Inadequate Controls Re Return of Equipment to Svc.Standing Order Revised + (23:42:52, 23 December 2024)
- ML19351A452 + (23:42:54, 23 December 2024)
- ML19351A451 + (23:42:55, 23 December 2024)
- ML19351A450 + (23:42:56, 23 December 2024)
- ML19351A440 + (23:43:14, 23 December 2024)
- ML19351A438 + (23:43:16, 23 December 2024)
- ML19351A437 + (23:43:17, 23 December 2024)
- ML19351A436 + (23:43:18, 23 December 2024)
- ML19351A433 + (23:43:19, 23 December 2024)
- 05000370/LER-1989-011-04, :on 890914,operations Personnel Logged Into Tech Spec 3.0.3 to Allow Leak Rate Testing of ECCS Check Valves.No Cause Assigned Since Station Voluntarily Entered Tech Spec.Personnel Aware of Sys Alignment + (23:43:21, 23 December 2024)
- 05000369/LER-1989-025, :on 890918,jumper Came Loose & Inadvertently Made Contact W/Sliding Link B-14 Directly Above Link B-15, Resulting in Turbine Driven Feedwater Pump Automatically Starting.Caused by Inappropriate Action + (23:43:24, 23 December 2024)
- ML19351A429 + (23:43:26, 23 December 2024)
- ML19351A428 + (23:43:26, 23 December 2024)
- ML19351A427 + (23:43:27, 23 December 2024)
- 05000344/LER-1989-020, :on 890914,identified That Values for RCS Average Temp & Pressurizer Pressure in Tech Spec 3.2.5 Were Actual Values Used in Safety Analyses Rather than Indicated Values.Caused by Personnel Error + (23:43:30, 23 December 2024)
- 05000344/LER-1989-019, :on 890916,pressurizer Safety Valve Setpoint Found out-of-tolerance During Testing.Caused by Change in Test Method.Valve Left Setpoint Adjusted & Valve Retested Satisfactorily + (23:43:34, 23 December 2024)
- ML19351A420 + (23:43:36, 23 December 2024)
- ML19351A419 + (23:43:38, 23 December 2024)
- ML19351A417 + (23:43:39, 23 December 2024)
- 05000219/LER-1989-020, :on 890915,operator Trainee Identified That Knife Switch Used to Select Dc Control Power Source for 480 Volt Ac Unit Substation 1B2 Was Selected.Caused by Procedural Inadequacy.Lineup Sheet Used + (23:43:41, 23 December 2024)
- 05000277/LER-1989-020-02, :on 890915,discovered That RHR Pump Motors & Core Spray Pump Motors Had Nonconforming Boot Installation Configuration.Caused by Less than Adequate or Incomplete Procedures.Splice Configurations Restored + (23:43:43, 23 December 2024)
- ML19351A412 + (23:43:53, 23 December 2024)
- B13386, Forwards Millstone Nuclear Power Station Unit 3 Inservice Insp Summary Rept, Per 10CFR50.55a(g) & ASME Code Section XI,IWA-6230 + (23:43:54, 23 December 2024)
- NLS8900388, Responds to NRC Re Violations Noted in Insp Rept 50-298/89-24.No Corrective Action Required as Util Believes That Deviation Cited Due to Difference of Opinion Re Notification of Change in Commitment + (23:43:57, 23 December 2024)
- ML19351A406 + (23:43:59, 23 December 2024)
- ML19351A404 + (23:44:01, 23 December 2024)
- ML19351A403 + (23:44:02, 23 December 2024)
- TAC:64659 + (23:44:03, 23 December 2024)
- ML19351A400 + (23:44:06, 23 December 2024)
- ML19351A399 + (23:44:07, 23 December 2024)
- ML19351A397 + (23:44:26, 23 December 2024)
- ML19351A395 + (23:44:28, 23 December 2024)
- ML19351A394 + (23:44:31, 23 December 2024)
- ML19351A392 + (23:44:32, 23 December 2024)
- ML19351A390 + (23:44:36, 23 December 2024)
- ML19351A389 + (23:44:39, 23 December 2024)
- B13378, Advises of Minor Deviation from Transportation Regulations Re Limited Quantity Radioactive Matls Shipment to Haddam Neck Plant.Util Initiated Evaluation of Existing Transportation Program to Determine What Actions Necessary + (23:44:41, 23 December 2024)
- ML19351A384 + (23:44:44, 23 December 2024)
- ML19351A382 + (23:44:45, 23 December 2024)
- ML19351A381 + (23:44:47, 23 December 2024)
- ML19351A380 + (23:44:48, 23 December 2024)
- ML19351A379 + (23:44:50, 23 December 2024)
- ML19351A377 + (23:44:52, 23 December 2024)
- ML19351A375 + (23:44:54, 23 December 2024)