ML19351A420

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Summary Rept Trojan Unit 1 Nuclear Generating Plant,Second Interval,First Period,Third Outage, NDE ASME Section XI Required Exams, Which Includes Fracture Mechanics Analysis for Acceptance of Flaw in Upper Weld
ML19351A420
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/20/1989
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19351A421 List:
References
NUDOCS 8910230202
Download: ML19351A420 (1)


Text

y, l

t I '-

j m

1 i,

.e '

'f' M

.m Ei Portland Genered ElectricCcirpiay i

~

f' I

David W. Cockfield Vice President. Nuclear October 20, 1989 i

Trojan Nuclear Plant.

Docket 50-344 i

License NPF-1 U.S. Nuclear Regulatory Commission ATTW: Document Control Desk Washington DC 20555 i

Dear Sirs:

Jnservice Inspection Summary Report i

Title 10 of the Code of Federal Regulations, Part 50, Section 55a, Paragraph g (10 CFR 50.55a(s)), requires the submittal of an inservice inspection (ISI) summary report in accordance with American Society of Mechanical Engineers (ASME)Section XI, Paragraph IWA-6230 within 90 days of the completion of the ISI conducted during a refueling outage.

Enclosed is the Trojan Nuclear Plant Inservice Inspection Summary Report for the second interval, first period, third outage. Included under Tab D, Section 1.3, " Pressurizer", is a fracture mechanics analysis which provides the basis for acceptance by evaluation of a flaw in the pressurizer upper head-to-shell weld. This analysis is submitted in accordance with ASME Section XI, Paragraph IWB-3125.

Sincerely, L

Enclosure L

l-c:

Mr. John B. Martin 1:

Regional Administrator, Region V i

U.S. Nuclear Regulatory Commission 1

i.

Mr. David Stewart-Smith l.

v State of Oregon j

of,8 Depnrtment of Energy gja.

(w/o enclosuro)

Eb L

coo Mr. R. C. Barr NRC Resident Inspector i

-g I

ou Trojan Nuclear Plant

,$8 (w/o enclosure)

M f

N Mr. C. Hinson, Chief yeY /

M Boiler and Elevator Safety Programs

\\, f g i

D C-Oregon Department of Commerce j gg.

121 S W SMmon SUeet. Ibrt and. Oregon 97204

/

1 L.

1 i

j

y..'

v.

a:.

/

-......=

i H

inservice Inspection Report Trojan Unit 1 e

Nuclear Generating Plant j

\\

Portland General ElectricLCompany r

i L

1 l1 for

-t t

Second Interval, First Period, Third Outage o NDE ASME Section XI-Required Examinations 1

Trojan Nuclear Plant h

= n gri

---er-#r.-,...~.e-.,,.*,,,,m_...,s,m--.,,_.-m--_, -, -,_...___,___ _ _ _ _. -_ _ _ _ __ _ _ __ _ _ _

-_ _ _ _ _ _ _. __-, - _.