.m Ei Portland Genered ElectricCcirpiay i
~
f' I
David W. Cockfield Vice President. Nuclear October 20, 1989 i
Trojan Nuclear Plant.
Docket 50-344 i
License NPF-1 U.S. Nuclear Regulatory Commission ATTW: Document Control Desk Washington DC 20555 i
Dear Sirs:
Jnservice Inspection Summary Report i
Title 10 of the Code of Federal Regulations, Part 50, Section 55a, Paragraph g (10 CFR 50.55a(s)), requires the submittal of an inservice inspection (ISI) summary report in accordance with American Society of Mechanical Engineers (ASME)Section XI, Paragraph IWA-6230 within 90 days of the completion of the ISI conducted during a refueling outage.
Enclosed is the Trojan Nuclear Plant Inservice Inspection Summary Report for the second interval, first period, third outage. Included under Tab D, Section 1.3, " Pressurizer", is a fracture mechanics analysis which provides the basis for acceptance by evaluation of a flaw in the pressurizer upper head-to-shell weld. This analysis is submitted in accordance with ASME Section XI, Paragraph IWB-3125.
Sincerely, L
Enclosure L
l-c:
Mr. John B. Martin 1:
Regional Administrator, Region V i
U.S. Nuclear Regulatory Commission 1
i.
Mr. David Stewart-Smith l.
v State of Oregon j
of,8 Depnrtment of Energy gja.
(w/o enclosuro)
Eb L
coo Mr. R. C. Barr NRC Resident Inspector i
-g I
ou Trojan Nuclear Plant
,$8 (w/o enclosure)
M f
N Mr. C. Hinson, Chief yeY /
M Boiler and Elevator Safety Programs
\\, f g i
D C-Oregon Department of Commerce j gg.
121 S W SMmon SUeet. Ibrt and. Oregon 97204
/
1 L.
1 i
j
- y..'
v.
a:.
/
-......=
i H
inservice Inspection Report Trojan Unit 1 e
Nuclear Generating Plant j
\\
Portland General ElectricLCompany r
i L
1 l1 for
-t t
Second Interval, First Period, Third Outage o NDE ASME Section XI-Required Examinations 1
Trojan Nuclear Plant h