Text
.
~
._. - __ . . _
.
,,.
,
'
%
,
,
,
,w
,
!
OCT I 31989
i
"
t
!
.
.
t
In Reply Refer To
,
Dockets:
50-445/89-72
+
'
50-446/d9-72
,
I
t
v-
Mr.oW. J. Cahill, Jr.
l
Executive Vice President
j
'
l'
TU Electric
400 North Olive Street, Lock Box 81
Dallas, Texas.
75201
l
Dear Mr. Cahill:
i
'
Thic refers to the inspection conducted by Messrs. W. D. Johnson and
!
S. D. Bitter duritig the period September 6 through October 3,
l
1989, of activities authorized by NRC Corstruction Permits CPPR-126
!
&nd CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
)
8
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy.of our inspection report identifies areas examined
!
during the inspection.
Within these areas, the inapection consisted.
'
I
of selective examination of procedures and representative records,
interviews with personnel, and observation by the inspectors.
!
During this inspection period, thero were two instances noted where
certain of your activities appeared to be in violation of NRC
regulations.
For the violation described in Pdragraph 2 of the
i
euclosed. inspection report, no Notice of Violation (NOV) is being
,
issued.
This action is in accordance with Section V.G.1 of the NRC's
!
Enforcement Policy (10 CFR Part 2, Appendix C).
For the violation
i
des:ribed in Paragraph 12 of the enclosed inspection report, an h0V
l
is bcing issued.
A written response to this violation is rcidired.
!
i
i
In accorcance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter, the enclosed inspection report, and your
{'
response will be placed in the NRC Public Document Room.
l
The response directed by this letter and the accompanying Notice is
,
not subject to the clearance procedures of the office of Management
and Budget as required by the Paperwork heduction Act of 1980,
,
'FL 96-511.
l
l
t
RI:CPPD NRR
SRI CPPD:NRR
CPPD NRR
AD:CPPD:NRR
FDitter
WJohnson
JWiebe
RWarnick RFW
10/n /89
10/p /89
10/lV 9
10/11/89
$
%
'
89102OO1L4 891013
/
f
FDR
ADOCK 05000445
[
O
FDC
'
i
-
-
- . . . - -
. . - . - . - . .
. . -
. - . . . ,
. , . .
.
,
- _ _
- - - _
-
-
e
'
c.
.
.
,
e
W. J. Cahill, Jr.
-2-
OCT I 31959 -
- '
I
'1,
Should you have any questions concerning this inspection, we will be
'
pleased to discuss them with you.
. '
.',
,
2
Sincerely,
~ . . . . . . . . . .
. . .
..
.-
ORIGnat FIC:!T.D BY R. T. WA?JUCK
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
office of Nuclear Reactor siegulation
Enclosures:
Appendix A - Notice of Violation
Appendix B - Inspection teport 50-445/89-72; 50-446/89-72
cc w/ enclosures
See next page
.o
i
e
I
_
._
__ _
_
w
,
--
- -
3
sm
.
'
.!
'
.
i
t,
f
50-445/f-72;50-446/ff-2,2
'
P
DISTRIBUTION:
i;
TW{glIWF$1e3MV44S/446)T1
NF:C PDR
Li'DR
,
CI'PD-LA
C1'PD Reading (HQ)
,
i
tilSP
Reading
'
'
?
- S!,te Reading File
- P, Warnick
- J~ Wiebe
i.
- H
Livermore
,
'
- M:(S Syutem, RIV
c
- R:iTS Operator, RIV
j
'
'
K?B, RIV
R'IV Docket File
J. G31111and
RIV
i
1
!
- L.
Shea, ARM /LFMB
'
C.
I. Grimes
,
J. H. Wilsor
J. Lyons
P. Malloy
S. Moore, OGC
M. Fields
'
D. Crutchfield
T. Quay
,
'
E. Jordan
B. Grimes
B. Hayes
C. Vandenburgh
J. Partlow
- w/766
,
f
1
.
,-
--
.,
+ Y'
.\\
1
umTO STATES
I
.
e
I
NUCLEAM RECULATORY COMMISSION
o
{
l
wAemwovow, o. c. sones
!
%.....
OCT I 3 989
<,
1
In Reply Refer To:
Pockets:
50-445/89-72
i
cu
50-446/89-7,
J
,
Mr. W. J. Cahill, Jr.
t
Executive Vice President
'
TU Electric
j
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
'
l
-
f
Dear Mr. Cahill:
i
This' refsrs to the int.pection conducted by Messrs. W. D. Johnson and
l
S. D. Bitter during the period September 6 through october 3
j
1999, of activities authorized by NEC Construction Permits CPPR-126
i
and CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
i
and 2, and.to tha discussion of our findings with you and other
!
members of your staf' at the conclusion of the inspection.
l
The enclosed copy of our inspection report identifies areas examined
during the inspection.
Within these areas, the inspection consisted
!
i
of selective examination of procedures and representative records,
interviews with personnel, and observation by the inspectors.
{
i
i
During this inspection period, there were two instances noted where
!
i
certain of your activities appeared to be in violation of NRC
!
regulations.
For the violation described in Paragraph 2 of the
i
,
enclosed inspection report, no Notice of Violation (NOV) is being
issued.
This action is in accordance with Section V.G.1 of the NRC's
!
,
Enforcement Policy (10 CFR Part 2, Appendix C).
For the violation
!
described in Paragraph 12 of the enclosed inspection report, an NOV
is being issued.
A written response to this violation is required.
-
In accordance with 10 CFR 2.790 of the Comission's regulaticns, a
'
copy of this letter, the enclosed inspection report, and your
response will be placed in the NRC Public Document Room.
l
The response directed by this letter and the accompanying Notice is
,
not subject to the clearance procedures of the office of Management
.
and Budget as required by the Paperwork Reduction Act of 3980,
i
PL 96-511.
'
!
[
l
!
'
l
.
..--..
. - . . -
. . . ~ . - . - - - - . . - -
-
-
i
-
'
V
L
.
- l'
W. J. Cahill, Jr.
-2-
OCT I 3 $89
I
l
i
should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
sincerely,
!
1
RFW O
R. F. Warnick, Assistant Director
for Inspection Programs
comanche Peak Project Division
l
office of Nuclear Reactor Regulation
i
Enclosures
!
Appendix A - Notice of Violation
i
Appendix B - Inspection Report 50-445/89-72; 50-446/89-72
cc w/ enclosures:
.
See next page
!
>
i
I
i
i
[
,
I
I
l
l
'
,
l
l
.
1
"
.
.
_
.
.
.
_
- . _ . . _ _ _ _ _
_
.
._
.__
.
.
_.
-.
_
. - - - - .
-
.
i
'
-
,
I
I
OCT I 31989
o
W.
J. Cahill, Jr.
cc w/ enclosures
!
Roger D. Walker
TU Electric
!
Manager, Nuclest Licensing
c/o Bethesda Licensing
TU Electric
3 Metro Center, Suite 610
skyway Tower
Bethesda:, Maryland
20814
l
400 North olive Street, L.B. 81
Dallas, TX
75201
E. F. Ot tney
i
P. O. Bc. 1777
Juanita Ellis
Glen Rose, Texas
76043
j
President - CASE
'
1426 South Polk Street
Jack R. Etewman
!
Dallas, TX
75224
Newman & Holtzinger
i
1615 L Sureet, NW
!
Texas Radiation Control
Suite 10U0
!
Program Director
20036
i
Texas Department of Health
l
1100 West 49th Street
George R. Bynog
i
78756
Program Ngr./ Chief Inspector
Texas Dept. of Labor & Standards
!
GDS Associates, Inc.
Boiler Division
,
1850 Parkway Place, Suite 720
P.O. Box 12157, Capitol Station
Marietta, GA
30067-8237
78711
(
I
Nonorable George Crump
County Judge
Glen Rose, Texas
76043
Ms. Billie Pirner Garde, Esq.
.
I
Robinson, Robinson, et al.
103 East College Avenue
i
Appleton, WI
54911
-
Regional Administrator, Region IV
,
U.S. Nuclear Regulatory Commission
-
!
611 Ryan Plaza Drive, Suite 1000
l
Arlington, Texas
76011
i
William A. Burchette, Esq.
i
i
Counsel for Tex-La Electric
i
!
Cooperative of Texas
>
l
Heron, Burchette, Ruckert & Rothwell
i
1025 Thomas Jefferson St., NW
20007
,
4
P