Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003H308 + (17:04:27, 23 December 2024)
- ML20003H311 + (17:04:27, 23 December 2024)
- 05000302/LER-1981-020, Forwards LER 81-020/03L-0 + (17:04:29, 23 December 2024)
- 05000325/LER-1981-046-03, /03L-0:on 810414,after 1A Loop of RHR Was Placed Into Torus Recirculation Mode for Taking Sample,Snubber 1-E11-4755326 Found to Have Broken Shaft.Caused by Water Hammer Event.Snubber Repaired + (17:04:30, 23 December 2024)
- 05000219/LER-1981-019-03, /03L-0:on 810328,during Normal Shutdown Sequence, IRM Calibr Was Not Performed as Required by Tech Specs. Caused by Procedural Inadequacy.Procedures Will Be Revised + (17:04:32, 23 December 2024)
- ML20003H303 + (17:04:34, 23 December 2024)
- ML20003H302 + (17:04:35, 23 December 2024)
- 05000219/LER-1981-019, Forwards LER 81-019/03L-0 + (17:04:36, 23 December 2024)
- ML20003H299 + (17:04:37, 23 December 2024)
- 05000325/LER-1981-046, Forwards LER 81-046/03L-0 + (17:04:39, 23 December 2024)
- ML20003H296 + (17:04:40, 23 December 2024)
- 05000277/LER-1981-025-01, /01T-0:on 810413,seismic Analysis of Torus to Reactor Bldg Vacuum Breaker Valves Revealed That Valve Operator Mounting Brackets Did Not Meet Seismic Requirement. Valve AO-2502B Upgraded by Addition of Snubber + (17:04:41, 23 December 2024)
- ML20003H294 + (17:04:43, 23 December 2024)
- ML20003H293 + (17:04:46, 23 December 2024)
- 05000277/LER-1981-025, Forwards LER 81-025/01T-0.Detailed Event Analysis Submitted + (17:04:48, 23 December 2024)
- ML20003H290 + (17:04:49, 23 December 2024)
- ML20003H289 + (17:04:49, 23 December 2024)
- 05000327/LER-1981-034-03, /03L-0:on 810331 & 0409,liquid Radwaste Effluent Monitor O-RM-90-122 Would Not Source Check.Caused by Contamination of Sample Chamber.Chamber Replaced.Design Change Requests Submitted + (17:04:51, 23 December 2024)
- ML20003H286 + (17:04:53, 23 December 2024)
- ML20003H285 + (17:04:54, 23 December 2024)
- ML20003H282 + (17:04:54, 23 December 2024)
- 05000327/LER-1981-034, Forwards LER 81-034/03L-0 + (17:04:56, 23 December 2024)
- ML20003H276 + (17:04:57, 23 December 2024)
- ML20003H277 + (17:04:57, 23 December 2024)
- 05000327/LER-1981-035-03, /03L-0:on 810403,auxiliary Feedwater Pump 1A-S Tripped on Electrical Overspeed After Inadvertent Pump Start.Caused by Locking Nut on Control Circuit Trimpot Vibrating Loose & Allowing Setpoint to Drift + (17:04:59, 23 December 2024)
- 0CAN048119, Requests That Part of Fee for Review of Unit 2 Operable Tech Spec to Be Applied to Unit 1 & Remaining Amount Be Refunded to Util.Class II Should Be Max Fee for Both Units + (17:05:00, 23 December 2024)
- 05000327/LER-1981-035, Forwards LER 81-035/03L-0 + (17:05:03, 23 December 2024)
- 05000327/LER-1981-042-03, /03L-0:on 810408,condensate Demineralizer Discharge Radiation Monitor O-RM-90-225 Declared Inoperable When Malfunction Alarm Received.Caused by Loose Fuse in Monitor Power Supply Circuit + (17:05:05, 23 December 2024)
- ML20003H267 + (17:05:07, 23 December 2024)
- 05000327/LER-1981-042, Forwards LER 81-042/03L-0 + (17:05:08, 23 December 2024)
- 05000336/LER-1981-016-03, /03L-0:on 810401,reactor Protection Sys Channel D Trips for High Power,Thermal margin-low Pressure & Local Power Density Declared Inoperable.Caused by Linear Amplifier Voltage Drift.Investigation Will Be Made at Next Shutdow + (17:05:10, 23 December 2024)
- 05000327/LER-1981-040-03, /03L-0:on 810401,channel Check of Containment Sump Level Indicators Revealed LI-63-178 Was Reading Approx 6% High.Probably Caused by Transmitter Problem.Investigation to Be Made During Next Outage + (17:05:12, 23 December 2024)
- 05000336/LER-1981-016, Forwards LER 81-016/03L-0 + (17:05:14, 23 December 2024)
- ML20003H260 + (17:05:15, 23 December 2024)
- 05000327/LER-1981-040, Forwards LER 81-040/03L-0 + (17:05:17, 23 December 2024)
- AECM-81-156, Final Deficiency Rept Re Nonqualified Diesel Generator Pump Motors,Initially Reported 810323.AE in Process of Procuring Class IE Motors from Different Vendor.Present Motors to Be Replaced W/Reliance Electric Co Models + (17:05:18, 23 December 2024)
- ML20003H256 + (17:05:20, 23 December 2024)
- ML20003H255 + (17:05:20, 23 December 2024)
- AECM-81-149, Interim Deficiency Rept 3 Re Incorrectly Ordered Throttling Valves,Initially Reported on 800912.Supplier Mod of Valves Underway.Final Rept to Be Delayed Until 811016 to Assure All Affected Sys Adhere to Design Specs + (17:05:21, 23 December 2024)
- ML20003H252 + (17:05:23, 23 December 2024)
- ML20003H251 + (17:05:25, 23 December 2024)
- ML20003H250 + (17:05:26, 23 December 2024)
- ML20003H249 + (17:05:28, 23 December 2024)
- ML20003H248 + (17:05:30, 23 December 2024)
- ML20003H247 + (17:05:31, 23 December 2024)
- IR 05000413/1981004 + (17:05:32, 23 December 2024)
- ML20003H244 + (17:05:34, 23 December 2024)
- ML20003H243 + (17:05:35, 23 December 2024)
- ML20003H241 + (17:05:36, 23 December 2024)
- ML20003H238 + (17:05:37, 23 December 2024)
- IR 05000438/1981007 + (17:05:38, 23 December 2024)