Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20004B216 + (16:44:35, 23 December 2024)
- ML20004B215 + (16:44:36, 23 December 2024)
- 05000325/LER-1981-051-03, /03L-0:on 810422,investigation Revealed That 31- Day Surveillance Frequency for Verification of All Equipment Hatches Had Not Been Implemented.Caused by Oversight in Assessing Testing Requirements.Procedure Revised + (16:44:37, 23 December 2024)
- 05000244/LER-1981-010, Forwards LER 81-010/03L-0 + (16:44:39, 23 December 2024)
- IR 05000313/1981008 + (16:44:41, 23 December 2024)
- ML20004B208 + (16:44:42, 23 December 2024)
- 05000325/LER-1981-051, Forwards LER 81-051/03L-0 + (16:44:43, 23 December 2024)
- ML20004B205 + (16:44:44, 23 December 2024)
- ML20004B204 + (16:44:45, 23 December 2024)
- 05000364/LER-1981-007-03, /03L-0:on 810421,containment Atmosphere Particulate & Gaseous Radioactivity Monitoring Sys R11 & R12 Declared Inoperable When Inboard Pump Tripped.Caused by Flow Control Valve Not Being Lock Wired.Valve & Pump Repaired + (16:44:46, 23 December 2024)
- 05000325/LER-1981-047-03, /03L-0:on 810422,during Testing of Type C Local Leak Rates,Primary Containment Isolation Valves 1-CAC-V7, V9,V15 & V17 Exceeded Leak Rate Limits.Caused by Corroded Valve Discs.Discs Will Be Replaced & Retested + (16:44:48, 23 December 2024)
- 05000316/LER-1981-018, Forwards LER 81-018/03L-0 + (16:44:50, 23 December 2024)
- ML20004B198 + (16:44:52, 23 December 2024)
- ML20004B197 + (16:44:52, 23 December 2024)
- 05000364/LER-1981-007, Forwards LER 81-007/03L-0 + (16:44:55, 23 December 2024)
- 05000346/LER-1981-025-03, /03L-0:on 810423,during Review of Safety Tagging Log,Unit Entered Mode 4 W/O Required Two Makeup Pumps Operable.Caused by Personnel Error.Pumps Restored to Operation.Personnel Reinstructed in Procedures + (16:44:57, 23 December 2024)
- ML20004B189 + (16:44:58, 23 December 2024)
- 05000346/LER-1981-025, Forwards LER 81-025/03L-0 + (16:45:02, 23 December 2024)
- 05000368/LER-1981-017-99, /99L-0:on 810424,during Mode 1 operation,30 Out of 32 Resistance Temp Detectors Did Not Meet Tech Spec Response Time Limit of 6-s.Caused by Inadequate Contact of Couplant Thermowells.Wells Cleaned & Visually Inspected + (16:45:05, 23 December 2024)
- ML20004B184 + (16:45:06, 23 December 2024)
- ML20004B182 + (16:45:08, 23 December 2024)
- ML20004B180 + (16:45:09, 23 December 2024)
- ML20004B179 + (16:45:10, 23 December 2024)
- 05000312/LER-1981-024-03, /03T-0:on 810419,approx 4,000 Gallons of Reactor Coolant Was Inadvertently Transferred from RCS to Reactor Bldg Emergency Pump.Caused by Personnel Error.Rcs Was Refilled & Revented + (16:45:12, 23 December 2024)
- 05000368/LER-1981-017, Forwards LER 81-017/99L-0 + (16:45:14, 23 December 2024)
- 05000312/LER-1981-024, Forwards LER 81-024/03T-0.Detailed Event Analysis Encl + (16:45:17, 23 December 2024)
- ML20004B172 + (16:45:18, 23 December 2024)
- ML20004B171 + (16:45:19, 23 December 2024)
- 05000277/LER-1981-027-03, /03L-0:on 810424,during Maint Outage,Hydraulic Snubbers SS-5-A,S5-A1,S5-D3 & 1-GG-5-27 Found to Have Empty Reservoirs.Caused by Deterioration of Snubber Piston Seals of Grinnell Models AN-1372B & AH-1373A.Snubbers Rebuilt + (16:45:20, 23 December 2024)
- ML20004B164 + (16:45:21, 23 December 2024)
- ML20004B163 + (16:45:22, 23 December 2024)
- ML20004B162 + (16:45:23, 23 December 2024)
- 0CAN058105, Forwards Endorsements 44,45 & 46 to Nelia Policy NF-210 & Endorsements 39 & 40 to Maelu Policy MF-74 + (16:45:24, 23 December 2024)
- 05000259/LER-1981-015-03, /03L-0:on 810428,during Refueling Outage,Air Monitor 1-RM-90-250 for Reactor Turbine Bldg Ventilation Found Inoperable Due to Instrument Indicating Downscale. Caused by Failed Detector High Voltage.Voltage Repaired + (16:45:27, 23 December 2024)
- ML20004B158 + (16:45:28, 23 December 2024)
- 05000259/LER-1981-015, Forwards LER 81-015/03L-0 + (16:45:29, 23 December 2024)
- 05000333/LER-1981-037-03, /03L-0:on 810427,average Planar Linear Heat Generation Rate Surveillance Found Not Performed on 810420, 21 & 23 Per Tech Spec 4.5.H.Caused by Personnel Error. Personnel Will Review Event Rept to Prevent Recurrence + (16:45:31, 23 December 2024)
- 05000333/LER-1981-037, Forwards LER 81-037/03L-0 + (16:45:33, 23 December 2024)
- 0CAN058106, Forwards Endorsement 4 to Nelia Binder EB-48 + (16:45:34, 23 December 2024)
- ML20004B151 + (16:45:39, 23 December 2024)
- 05000259/LER-1981-017-03, /03L-0:on 810423,Athens 161Kv Line & D Cooling Tower Switch Gear Tripped.Diesel Generators Failed to Immediately Demonstrate Operability Per Tech Spec 4.9.B.1. Caused by Personnel Error.Operators Will Review Incident + (16:45:40, 23 December 2024)
- ML20004B149 + (16:45:41, 23 December 2024)
- 05000333/LER-1981-036-03, /03L-0:on 810422,motor on Low Pressure Coolant Injection Valve 10-MOV-25 Failed Rendering LPCI Loop a Inoperable.Caused by Motor Failure.Replacement of Motor Restored LPCI Loop a to Operable Status + (16:45:43, 23 December 2024)
- 05000259/LER-1981-017, Forwards LER 81-017/03L-0 + (16:45:44, 23 December 2024)
- ML20004B145 + (16:45:47, 23 December 2024)
- 05000333/LER-1981-036, Forwards LER 81-036/03L-0 + (16:45:48, 23 December 2024)
- 05000315/LER-1981-012, Forwards LER 81-012/03L-0 + (16:45:50, 23 December 2024)
- ML20004B141 + (16:45:51, 23 December 2024)
- PNO-II-81-037, on 810522,unidentified Leak in Drywell Occurred.Controlled Shutdown Initiated.Max Leak Rate Was 21.5 Gpm.Preparations Being Made to Determine Source of Leakage + (16:45:53, 23 December 2024)
- ML20004B139 + (16:45:54, 23 December 2024)
- ML20004B138 + (16:45:56, 23 December 2024)