Forwards IE Insp Repts 50-498/81-15 & 50-499/81-15 on 810420-24.No Noncompliance Noted
ML20004B208
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/08/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20004B209 List:
References
NUDOCS 8105270395
Download: ML20004B208 (2)


See also: IR 05000498/1981015

Text

,.

,

j[

r

UNITED STATES

+ ,",;

NUCLEAR REGULATORY COMMISSION

5'

i

-

REGION IV

[j'

' . -

611 RYAN PLAZA DRIVE, SulTE 1000

, , , , , "

ARUNGTON. TEXAS 76011

In Reply Refer To:

May 8,1981

['

g

RIV

.s

l_f g . c$s

-\\

Dockets 50-498/Rpt. 81-15

50-499/Rpt. 81-15

-

o

,

_

tV

d'/

Houston Lighting and Power Company

s( CO. p

3

).

/,

ATTN: Mr. G. W. Oprea, Jr.

N

s

Executive Vice President

Post Office Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the insp6ction conducted by Mr. W. G. Hubacek of our staff during

the period April 20-24, 1981, of activities authorized by NRC Construction Permits

CPPR-128 and 129 for the South Texas Project, Units 1 and 2, and to the discuss on

i

of our findings with R. A. Frazar and other members of your staff at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed ir the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

,

personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe to

be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you

(a) notify this office by telephone within 10 da3s from the date of this

letter of your intention to file a request for withholding; and (b) submit

within 25 days from the date of this letter a written application to

this office to withhold such information.

If your receipt of this letter

nas been delayed such that less than seven days are available for your

review, please notify this office promptly so that a new due date may be

established. Consistent with Section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the informa-

tion which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons on the basis which it is claimed

that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.7a0(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public

Document Room.

(

105270g g

.

..

.

.

. _ .

_- .

b

.

Houston Lighting and Power Company

-2-

May 8,1981

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely.

ef d N0dvM

-

'. L. Madsen, Chief

G

Reactor Projects Branch

Enclosure:

IE Inspection Report 50-498/81-15

50-499/81-15

.