- 05000366/LER-1989-009-03, :on 891129,reactor Protection Sys Actuation Occurred from Scram Discharge Vol High Level Condition. Caused by Equipment Failure.Backup Temporary Air Compressor Placed Into Svc & Blown Fuse Replaced + (13:45:29, 23 December 2024)
- ML20005E184 + (13:45:30, 23 December 2024)
- ML20005E182 + (13:45:34, 23 December 2024)
- ML20005E181 + (13:45:35, 23 December 2024)
- ML20005E179 + (13:45:36, 23 December 2024)
- NRC-89-0300, Submits Three Phase Accountability Action Plan to Correct Recent Increase in Personnel Errors Per 891221 Meeting.Phase I Involves Verifying Possible Problems W/Surveillance Testing or Return to Svc of safety-related Equipment + (13:45:36, 23 December 2024)
- ML20005E178 + (13:45:37, 23 December 2024)
- ML20005E177 + (13:45:39, 23 December 2024)
- ML20005E176 + (13:45:39, 23 December 2024)
- ML20005E175 + (13:45:40, 23 December 2024)
- ML20005E173 + (13:45:41, 23 December 2024)
- ML20005E174 + (13:45:41, 23 December 2024)
- GO2-89-228, Forwards Response to Regulatory Effectiveness Review,Per 891108 Request.Encl Withheld (Ref 10CFR73.21) + (13:45:42, 23 December 2024)
- ML20005E171 + (13:45:44, 23 December 2024)
- ML20005E170 + (13:45:44, 23 December 2024)
- ML20005E169 + (13:45:45, 23 December 2024)
- ML20005E168 + (13:45:46, 23 December 2024)
- ML20005E166 + (13:45:48, 23 December 2024)
- ML20005E167 + (13:45:48, 23 December 2024)
- ML20005E164 + (13:45:49, 23 December 2024)
- 05000029/LER-1989-015, :on 891126,steam Generator Blowdown Continuous Composite Sampler Declared Inoperable & Analysis Not Done within 24 H.Caused by Failure to Follow Chemistry Procedures Correctly.Chemistry Personnel Counseled + (13:45:51, 23 December 2024)
- ML20005E162 + (13:45:52, 23 December 2024)
- ML20005E161 + (13:45:53, 23 December 2024)
- ML20005E160 + (13:45:54, 23 December 2024)
- ML20005E159 + (13:45:56, 23 December 2024)
- ML20005E158 + (13:45:57, 23 December 2024)
- IR 05000302/1989029 + (13:46:03, 23 December 2024)
- ML20005E155 + (13:46:05, 23 December 2024)
- ML20005E154 + (13:46:06, 23 December 2024)
- ML20005E153 + (13:46:07, 23 December 2024)
- ML20005E152 + (13:46:09, 23 December 2024)
- 05000271/LER-1989-025, :on 891128,primary Containment Isolation Sys Group III & Standby Gas Treatment Sys Initiation Occurred. Caused by Failure of Reactor Bldg Ventilation Radiation Monitor/Sensor Converter.Converter Replaced + (13:46:10, 23 December 2024)
- IR 05000482/1989029 + (13:46:15, 23 December 2024)
- ML20005E148 + (13:46:17, 23 December 2024)
- ML20005E146 + (13:46:19, 23 December 2024)
- ML20005E144 + (13:46:20, 23 December 2024)
- ML20005E141 + (13:46:22, 23 December 2024)
- ML20005E142 + (13:46:22, 23 December 2024)
- ML20005E140 + (13:46:23, 23 December 2024)
- PY-CEI-NRR-1115, Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Each motor- Operated Valve Will Be Stroke Tested to Verify Valve Operability at no-pressure & no-flow Conditions + (13:46:24, 23 December 2024)
- 05000458/LER-1989-041, :on 891125,unplanned ESF Actuation Occurred as Result of Two Leads Shorted Together During Testing of Control Circuitry,Causing Valve Isolation from Suppression Pool.Sys Lineup Restored to Normal Position + (13:46:30, 23 December 2024)
- ML20005E133 + (13:46:32, 23 December 2024)
- ML20005E132 + (13:46:33, 23 December 2024)
- W3P89-2162, Responds to Generic Ltr 89-10 Re safety-related motor- Operated Valve Testing & Surveillance.Util Will Complete All design-basis Reviews,Analyses,Verifications,Insps & Tests, Per Items a Through H by End of Sixth Refueling Outage + (13:46:34, 23 December 2024)
- ML20005E130 + (13:46:37, 23 December 2024)
- ML20005E129 + (13:46:38, 23 December 2024)
- ML20005E128 + (13:46:39, 23 December 2024)
- IR 05000483/1989019 + (13:46:44, 23 December 2024)
- ML20005E124 + (13:46:45, 23 December 2024)
- ML20005E123 + (13:46:46, 23 December 2024)
- PNO-III-89-087, on 891221,reactor Automatically Shut Down as Result of Negative Flux Rate,Causing Loss of Power to Reactor Coolant & Main Condenser Circulation Pumps.Forced Recirculation Restored & Inspector Sent to Plant + (13:46:49, 23 December 2024)