Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23293A305 + (20:03:00, 21 May 2025)
- ML23293A292 + (20:03:05, 21 May 2025)
- RA-23-0282, Second Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement + (20:03:08, 21 May 2025)
- NL-23-0752, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes + (20:03:13, 21 May 2025)
- ML23293A194 + (20:03:15, 21 May 2025)
- IR 05000482/2023003 + (20:03:25, 21 May 2025)
- RS-23-106, James A. Fitzpatrrick Nuclear Power Plant - Withdrawal for Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operate RHR Shutdown Cooling + (20:03:28, 21 May 2025)
- ML23293A034 + (20:03:35, 21 May 2025)
- 05000354/LER-2023-002, Shutdown Margin Less than Expected Resulting in a Condition Prohibited by Technical Specifications + (20:03:39, 21 May 2025)
- IR 05000454/2023012 + (20:03:44, 21 May 2025)
- ML23292A353 + (20:03:48, 21 May 2025)
- RA-23-0286, Notification of New NPDES Permit Receipt + (20:03:50, 21 May 2025)
- ML23292A351 + (20:03:53, 21 May 2025)
- ML23292A311 + (20:03:55, 21 May 2025)
- OI 1-2022-010, RI-2022-A-0013 Millstone Power Station - NRC Office of Investigation Case No. 1-2022-010 + (20:03:57, 21 May 2025)
- ML23292A280 + (20:04:00, 21 May 2025)
- ML23292A276 + (20:04:02, 21 May 2025)
- IR 05000255/2023401 + (20:04:04, 21 May 2025)
- L-2023-147, Core Operating Limits Report (COLR) Unit 1 Cycle 42 (U1 C42) + (20:04:06, 21 May 2025)
- NL-23-0785, Core Operating Limits Report, Cycle 24, Version 1 + (20:04:57, 21 May 2025)
- WBL-23-047, Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 62, General Emergency + (20:04:59, 21 May 2025)
- ML23292A099 + (20:05:01, 21 May 2025)
- ML23292A094 + (20:05:03, 21 May 2025)
- ML23292A074 + (20:05:07, 21 May 2025)
- RS-23-098, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors + (20:05:08, 21 May 2025)
- AEP-NRC-2023-39, Reactor Vessel Material Surveillance Program Report + (20:05:12, 21 May 2025)
- L-2023-149, Cycle 34 Core Operating Limits Report + (20:05:14, 21 May 2025)
- ML23292A035 + (20:05:17, 21 May 2025)
- BYRON 2023-0050, Cycle 25 Core Operating Limits Report + (20:05:18, 21 May 2025)
- IR 05000315/2023003 + (20:05:26, 21 May 2025)
- ML23291A461 + (20:05:30, 21 May 2025)
- ML23291A368 + (20:06:14, 21 May 2025)
- ML23291A367 + (20:06:15, 21 May 2025)
- ML23291A366 + (20:06:16, 21 May 2025)
- ML23291A365 + (20:06:18, 21 May 2025)
- ML23291A364 + (20:06:19, 21 May 2025)
- ML23291A363 + (20:06:20, 21 May 2025)
- EPID:L-2023-LLA-0141 + (20:06:21, 21 May 2025)
- ML23291A361 + (20:06:22, 21 May 2025)
- ML23291A360 + (20:06:23, 21 May 2025)
- ML23291A359 + (20:06:25, 21 May 2025)
- 05000341/LER-2023-003, Reactor Pressure Boundary Leakage at Socket Weld on Reactor Recirculation Sample Line Caused by Fatigue Failure + (20:06:27, 21 May 2025)
- ULNRC-06842, Cycle 27 Core Operating Limits Report (Letter) + (20:06:37, 21 May 2025)
- ML23291A266 + (20:06:40, 21 May 2025)
- ML23291A263 + (20:06:41, 21 May 2025)
- NMP1L3551, License Amendment Request - Modification of Technical Specifications Surveillance Requirements 4.3.6.a with Correction to Fully Adopt TSTF-425, Revision 3 + (20:06:43, 21 May 2025)
- DCL-23-105, Pre-Notice of Disbursement from Nonqualified Decommissioning Trust + (20:06:47, 21 May 2025)
- ML23291A153 + (20:06:50, 21 May 2025)
- NRC-23-0072, Clarification for RAI Response from 10-16-23 Phone Call Regarding Exigent License Amendment Request for Exigent License Amendment Request for Technical Specification 3.8.1, AC Sources - Operating - in Relation to Mechanical Draft Cool + (20:06:52, 21 May 2025)
- ML23291A108 + (20:06:56, 21 May 2025)
- IR 05000528/2023012 + (20:06:58, 21 May 2025)