Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident + (08:58:51, 21 February 2026)
- ML24228A295 + (08:58:54, 21 February 2026)
- PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant + (08:59:02, 21 February 2026)
- L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit + (08:59:03, 21 February 2026)
- IR 05000293/2024002 + (08:59:08, 21 February 2026)
- L-2024-140, Cycle 28 Core Operating Limits Report + (08:59:09, 21 February 2026)
- ML24227A964 + (08:59:10, 21 February 2026)
- L-2024-132, 2024 Population Update Analysis + (08:59:41, 21 February 2026)
- ML24226A438 + (08:59:43, 21 February 2026)
- CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality + (08:59:54, 21 February 2026)
- ML24226A090 + (08:59:58, 21 February 2026)
- NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval + (09:00:12, 21 February 2026)
- L-2024-122, Core Operating Limits Report + (09:00:21, 21 February 2026)
- ML24225A094 + (09:00:37, 21 February 2026)
- ML24222A677 + (09:01:31, 21 February 2026)
- DCL-2024-523, Submittal of Report on Discharge Self-Monitoring + (09:01:48, 21 February 2026)
- ML24221A287 + (09:03:00, 21 February 2026)
- L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval + (09:04:08, 21 February 2026)
- ML24219A393 + (09:04:24, 21 February 2026)
- ML24219A263 + (09:04:26, 21 February 2026)
- RA-24-0209, Regulatory Conference, Additional Supporting Information + (09:04:31, 21 February 2026)
- ML24219A027 + (09:04:41, 21 February 2026)
- 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal + (09:04:50, 21 February 2026)
- CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality + (09:04:51, 21 February 2026)
- PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 + (09:05:20, 21 February 2026)
- ML24215A300 + (09:05:23, 21 February 2026)
- ML24214A079 + (09:06:18, 21 February 2026)
- ML24214A072 + (09:06:23, 21 February 2026)
- ML24214A070 + (09:06:23, 21 February 2026)
- ML24214A069 + (09:06:24, 21 February 2026)
- ML24214A065 + (09:06:25, 21 February 2026)
- ML24214A064 + (09:06:25, 21 February 2026)
- ML24214A060 + (09:06:27, 21 February 2026)
- ML24214A054 + (09:06:28, 21 February 2026)
- ML24214A051 + (09:06:30, 21 February 2026)
- ML24214A049 + (09:06:31, 21 February 2026)
- ML24214A018 + (09:06:35, 21 February 2026)
- ML24214A019 + (09:06:35, 21 February 2026)
- ML24213A335 + (09:06:39, 21 February 2026)
- ML24213A141 + (09:06:47, 21 February 2026)
- NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation + (09:06:51, 21 February 2026)
- NLS2024053, Licensee Guarantees of Payment of Deferred Premiums + (09:07:00, 21 February 2026)
- GL-704111-29, Past Due General License Device Annual Registration + (09:07:10, 21 February 2026)
- AEP-NRC-2024-47, Form OAR-1, Owners Activity Report + (09:07:24, 21 February 2026)
- ML24211A041 + (09:08:30, 21 February 2026)
- RA-24-0165, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations + (09:08:43, 21 February 2026)
- WBL-24-034, NRC Regulatory Issue Summary (RIS) 2024-01 - Preparation and Scheduling of Operator Licensing Examinations + (09:08:59, 21 February 2026)
- L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections + (09:09:04, 21 February 2026)
- NLS2024052, Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow + (09:09:05, 21 February 2026)
- ML24207A085 + (09:09:08, 21 February 2026)
- LG-24-089, Owners Activity Report (OAR-1) for Li1R20 + (09:09:12, 21 February 2026)