Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000348/1989032 + (09:21:20, 21 December 2024)
- ML20011E266 + (09:21:21, 21 December 2024)
- ML20011E265 + (09:21:22, 21 December 2024)
- ML20011E264 + (09:21:23, 21 December 2024)
- ML20011E263 + (09:21:24, 21 December 2024)
- ML20011E261 + (09:21:25, 21 December 2024)
- ML20011E260 + (09:21:26, 21 December 2024)
- ML20011E258 + (09:21:27, 21 December 2024)
- ML20011E255 + (09:21:29, 21 December 2024)
- ML20011E254 + (09:21:30, 21 December 2024)
- ML20011E253 + (09:21:31, 21 December 2024)
- ML20011E252 + (09:21:32, 21 December 2024)
- ML20011E251 + (09:21:33, 21 December 2024)
- 05000412/LER-1990-001, :on 900107,high Radiation Alarm Received on Steam Generator Blowdown (SGBD) Sample Radiation Monitor, Causing SGBD Sys Isolation.Caused by Crud Particles Swept Into Monitor.Monitor Purged & Returned to Svc + (09:21:34, 21 December 2024)
- ML20011E248 + (09:21:38, 21 December 2024)
- ML20011E247 + (09:21:39, 21 December 2024)
- ML20011E245 + (09:21:43, 21 December 2024)
- ML20011E243 + (09:21:43, 21 December 2024)
- ML20011E241 + (09:21:44, 21 December 2024)
- ML20011E242 + (09:21:44, 21 December 2024)
- ML20011E240 + (09:21:46, 21 December 2024)
- ML20011E239 + (09:21:46, 21 December 2024)
- ML20011E238 + (09:21:47, 21 December 2024)
- 05000368/LER-1989-012, :on 890626,RCS Backleakage Through Safety Injection Sys Check Valve Occurred Three Times.Caused by Missing Rollpins Which Connect Valve Disc to Valve Disc Shaft.Rollpins Replaced & Valves Reassembled + (09:21:48, 21 December 2024)
- 05000295/LER-1990-001-02, :on 900103,RCS Leak of Approx 20 Gpm Developed. on 900104,leak Source Determined to Be Packing Failure on RHR Pump RCS Suction Isolation Valve 1MOV-RH8702.Caused by Failure to Center Valve Stem.Valve Repacked + (09:21:50, 21 December 2024)
- 05000311/LER-1989-027-01, :on 891231,steam Generator 22 Blowdown Radiation Monitoring Sys Channel 2R19B Failure Caused Sys Isolation.Caused by Electrical Spike on Channel Microprocessor.Setpoints Reentered + (09:21:55, 21 December 2024)
- 05000311/LER-1989-026-02, :on 891228,radiation Monitoring Sys Vent Noble Gas Monitor 2R41A Channel Spiked,Resulting in Containment purge/pressure-vacuum Relief Sys Isolation.Caused by Design/ Equipment Problem.Channel Reset & Guide Posted + (09:21:57, 21 December 2024)
- 05000259/LER-1990-001, :on 891213,approx 99 Snubbers Determined Not to Have Been Functionally Tested Before Installation.Caused by Inadequate Procedures Re post-mod Testing.Procedure Will Be Revised + (09:21:58, 21 December 2024)
- 05000313/LER-1989-039, :on 891116,discovered That Door for Upper North Electrical Penetration Room Open & Latch Mechanism Missing. Caused by Abnormally High Differential Pressure Across Door. Ventilation Sys Flow Balance Performed + (09:22:01, 21 December 2024)
- 05000413/LER-1990-002, :on 900103,containment Air Return Fan 1B Failed to Start During Quarterly Test & Breaker F01A in Motor Control Ctr Discovered Open.Caused by Inappropriate Operator Action.Lockout Breakers Closed + (09:22:03, 21 December 2024)
- 05000285/LER-1989-021, :on 891010,util Informed by C-E of Potential Nonconservative Setpoint in Reactor Protection Sys Thermal Margin/Low Pressure Trip Unit.Caused by Error in Incorporating Transient Setpoint Analyses + (09:22:05, 21 December 2024)
- 05000311/LER-1990-003, :on 900105,steam Generator 22 Blowdown Radiation Monitoring Sys Channel 2R19B Failed.Caused by Design/Equipment Concerns.Radiation Monitoring Sys Monitors & Modules Reseated + (09:22:07, 21 December 2024)
- 05000311/LER-1990-002, :on 900104,determined That ECCS Flow Balance Verification Surveillance Not Correctly Calculated After Last Refueling Outage on 881023.Caused by Personnel Error. Discretionary Enforcement Granted by NRC + (09:22:11, 21 December 2024)
- B13244, Informs of Plans to Resolve Problems Experienced During Last Two Summers W/High Svc Water Temps Slightly Above 90 F. Proposed License Amend Requests Will Be Submitted Limiting UHS Temps for Haddam Neck & Millstone Unit 2 + (09:22:13, 21 December 2024)
- ML20011E219 + (09:22:15, 21 December 2024)
- ML20011E217 + (09:22:18, 21 December 2024)
- ML20011E215 + (09:22:19, 21 December 2024)
- LIC-90-0082, Submits Revised Schedule to Replace Failed Differential Pressure Transmitter DPT-1039 & Auxiliary Feedwater Pump FW-10.Schedule for Transmitter Replacement Delayed from 900131 to 900430,subj to Receipt of Ordered Parts + (09:22:20, 21 December 2024)
- ML20011E213 + (09:22:22, 21 December 2024)
- ML20011E212 + (09:22:26, 21 December 2024)
- ML20011E210 + (09:22:27, 21 December 2024)
- ML20011E209 + (09:22:28, 21 December 2024)
- ML20011E207 + (09:22:29, 21 December 2024)
- ML20011E206 + (09:22:29, 21 December 2024)
- U-601574, Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. New Chlorination Sys Installed Using Hypochlorite Rather than Gaseous Chlorine & Test Program Will Be Developed + (09:22:30, 21 December 2024)
- LD-90-008, Forwards Response to 881216 Request for Addl Info Re CESSAR-DC,Chapters 3,4,5 & 6 Re Turbine Missiles,Control Element Drive Structural Matls,Cleaning & Contamination Protection Procedures & Reactor Internals Matls + (09:22:33, 21 December 2024)
- PLA-3331, Requests Registration as User of Model HN-190-2 Radioactive Matls Shipping Cask + (09:22:35, 21 December 2024)
- ML20011E202 + (09:22:37, 21 December 2024)
- ML20011E201 + (09:22:38, 21 December 2024)
- ML20011E200 + (09:22:39, 21 December 2024)
- ML20011E199 + (09:22:40, 21 December 2024)