Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20012F570 + (07:21:03, 21 December 2024)
- ML20012F569 + (07:21:03, 21 December 2024)
- ML20012F568 + (07:21:04, 21 December 2024)
- IR 05000309/1990003 + (07:21:07, 21 December 2024)
- ML20012F564 + (07:21:09, 21 December 2024)
- ML20012F561 + (07:21:43, 21 December 2024)
- BECO-90-047, Responds to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Instituted Biofouling Control Program in 1982 & Program Has Been Effectively Implemented at Plant & Complies W/Generic Ltr + (07:21:44, 21 December 2024)
- ML20012F559 + (07:21:47, 21 December 2024)
- ML20012F558 + (07:21:48, 21 December 2024)
- ML20012F557 + (07:21:49, 21 December 2024)
- ML20012F556 + (07:21:51, 21 December 2024)
- ML20012F554 + (07:21:55, 21 December 2024)
- ML20012F553 + (07:21:56, 21 December 2024)
- ML20012F551 + (07:21:58, 21 December 2024)
- W3P90-0268, Advises That Util Installed Two Addl Benchmarks for Use as Part of Basemat Surveillance Program to Increase Efficiency of Survey Readings.New Benchmarks Will Be Shown on FSAR Figure 1.2.1 as Part of Next FSAR Rev + (07:21:59, 21 December 2024)
- ML20012F548 + (07:22:02, 21 December 2024)
- ML20012F547 + (07:22:03, 21 December 2024)
- ML20012F545 + (07:22:03, 21 December 2024)
- ML20012F542 + (07:22:04, 21 December 2024)
- ML20012F541 + (07:22:05, 21 December 2024)
- SNRC-1709, Discusses Layup Implementation Program & Site Characterization Program for Plant.Util Intends to Remove Neutron Instrumentation & Other Selected Reactor Pressure Vessel Internals in Order to Obtain More Accurate Profile + (07:22:06, 21 December 2024)
- ML20012F540 + (07:22:06, 21 December 2024)
- ML20012F538 + (07:22:09, 21 December 2024)
- ML20012F537 + (07:22:10, 21 December 2024)
- ML20012F536 + (07:22:11, 21 December 2024)
- ML20012F534 + (07:22:16, 21 December 2024)
- ML20012F533 + (07:22:17, 21 December 2024)
- ML20012F532 + (07:22:17, 21 December 2024)
- ML20012F529 + (07:22:18, 21 December 2024)
- ML20012F530 + (07:22:18, 21 December 2024)
- ML20012F526 + (07:22:19, 21 December 2024)
- ML20012F527 + (07:22:19, 21 December 2024)
- ML20012F524 + (07:22:20, 21 December 2024)
- ML20012F523 + (07:22:21, 21 December 2024)
- 05000328/LER-1990-006, :on 900307,containment Ventilation Isolation Occurred.Caused by Containment Particulate Level Too Close to Setpoint.Module Replaced.Radiation Alarm Setpoint Increased from 10% to 40% of Tech Spec Limit + (07:22:22, 21 December 2024)
- ML20012F520 + (07:22:23, 21 December 2024)
- ML20012F519 + (07:22:24, 21 December 2024)
- 05000443/LER-1990-010, :on 900305,actuation of Control Room Emergency Air Cleanup & Filtration Subsystem Occurred.Caused by Moisture in Detector Housing.Air Intake Monitors Cleaned & Desiccant Placed in Housing + (07:22:25, 21 December 2024)
- ML20012F517 + (07:22:26, 21 December 2024)
- ML20012F515 + (07:22:28, 21 December 2024)
- ML20012F514 + (07:22:29, 21 December 2024)
- ML20012F512 + (07:22:32, 21 December 2024)
- ML20012F510 + (07:22:33, 21 December 2024)
- ML20012F511 + (07:22:33, 21 December 2024)
- ML20012F509 + (07:22:34, 21 December 2024)
- ML20012F508 + (07:22:35, 21 December 2024)
- ML20012F506 + (07:22:36, 21 December 2024)
- 05000368/LER-1989-027-01, :on 891005,determined That Leakage Rate for Containment Isolation Check Valve in Excess of Leakage Rate Allowed Per Tech Specs.Caused by Loose Weld Slag in Valve Seat Area.Valve Cleaned & Reassembled + (07:22:37, 21 December 2024)
- ML20012F504 + (07:22:39, 21 December 2024)
- 05000368/LER-1990-007, :on 900306,RCS Charging Line Rendered Inoperable Due to Deficient Piping Support Weld.Caused by Inadequate Work Controls & post-installation Insp Processes. Field Walkdowns & Weld Insps Initiated + (07:22:40, 21 December 2024)
- TXX-9013, Forwards Corrections to 891016 Response to Emergency Diesel Generator Engine Requirements.Lengths of Two Pairs of Bolts Above Crankpin Shall Be Measured Ultrasonically Before Detensioning & Disassembly of Bolts + (07:22:42, 21 December 2024)
- ML20012F502 + (07:22:42, 21 December 2024)