ML20012F508
| ML20012F508 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/20/1990 |
| From: | Pasciak W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9004160042 | |
| Download: ML20012F508 (2) | |
Text
g S.-
a i
NAR 2 01990 I
U.$, NUCLEAR REGULATORY COMMIS$10N Wo. 90-40 REGION I NOTICE OF $1GNIFICANT LICENSEE MEETING Licensee:
Boston Edison Company Facility:
Pilgrim Nuclear Power Station Docket No.:
50-293 Time and Date:
10:00 a.m., March 29, 1990 Location:
DRP Conference, Region 1 Office, King of Prussia, PA
Purpose:
Discuss Licensee Root Cause Analysis of Missed Technical Specification Surveillance of Two Instrument Line Excess Flow Check Valves and Licensee Analysis of Salt Service Water Pump Columns NRC Attendees:
J. Wiggins, Deputy Director, Division of Reactor Projects
+
(DRP)
J. Strosnider. Engineering Branch, Division of Reactor Safety (DR$)
J. Johnson, Chief, Projects Branch No. 3. DRP W. Pasciak, Chief, Reactor Projects Section 3A, DRP P. Espen, Chief, $pecial Tests Programs Section, DR$
J. Macdonald, Senior Resident Inspector T. Cerne, Resident Inspector C. Carpenter, Resident Inspector Licensee Attendees: R. Anderson, Plant Manager R. Fairbanks, Nuclear Engineering Manager R. $wanson, Regulatory Affairs Manager J. Dietrich, Licensing Manager T. Burns, Senior Metallurgical Engineer W. Riggs, Fluid Systems Division Manager Note: Attendance by NRC personnel at this meeting should de known by 4:00 p.m., March 28, 1990 via telephone call to
. Pascia Region I, at FTS 8-346-5146 or (215) 337-5146.
1 3Gh%& By,m/
Prepared by a,A
.t
/,,,x M N Wa'MeV PaMid,' Chief, RP5'3A 0FFICIAL RECORD COPY LIC MTG NOTICE 90 0001.0.0
@t 9004160042 900sto 03/20/90
.x
{DR ADOCK 0500g 2
f.
a MAR 2 01900 o
j a
l j
Distribution:
E C laylor, Acting Executive Director for Operations Deputy Executive Director for Materials $afety, Safeguarde and Operations Support i
B. Grimes Director Division of Reactor Inspection and $afeguards, NRR J. Lieberman, Director, Office of Enforcement i
T. Murley, Director, Of fice of Nuclear Reactor Regulation f
F. Miraglia, Associate Director for Inspection and Technical Assessment, NRR
$. Varga, Director, Division of Reactor Projects - 1/11, NRR B. Boger, Assistant Director for Region ! Reactors, NRR D. Wessman, Director, Project Directorate I-3, NRR D. Mcdonald, Project Manager, PD I-3, NRR J. Dyer EDD Public Document Room (PDR)
Local Public Document Room (LPDR)
Commonwealth of Massachusetts (2)
NRC Resident Inspector W. Grif fin, Plymouth Board of Selectmem Honorable William B. Golden, Massachusetts State Senator bec:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)
J. McGrath, RI M. Miller, RI K. Smith, RI D. Holody, RI Region I Receptionist DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP j
i 1:'RP P(1L/meo
(
/2 /
0FFICIAL RECORD COPY LIC MTG NDTICE 90 0002.0.0 03/20/90
.