Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023B519 + (06:51:09, 21 December 2024)
- ML20023B517 + (06:51:10, 21 December 2024)
- BSEP-83-1328, Ro:On 830325,fire Barrier Limiting Condition for Operation Generated to Permit Accessing Fire Door in Augmented Offgas Bldg.Caused by Temporary Routing of Flush Lines for Plant Mod.Mod Work Completed on 830411 + (06:51:11, 21 December 2024)
- ML20023B515 + (06:51:11, 21 December 2024)
- ML20023B510 + (06:51:13, 21 December 2024)
- ML20023B509 + (06:51:14, 21 December 2024)
- 05000335/LER-1983-021-03, /03L-0:on 830329,w/refueling Cavity Filled Greater than 23 Ft,Two Shutdown Cooling Hot Leg Suction Valves Closed,Isolating Flow to Core.Caused by Shorting Out of Power Supply to Control Circuit.Power Restored + (06:51:16, 21 December 2024)
- ML20023B506 + (06:51:17, 21 December 2024)
- ML20023B503 + (06:51:18, 21 December 2024)
- AECM-83-0260, RO 83-026/0:on 830327,security Access Card Reader to Fire Door 1A318,Elevation 166 Ft,In Auxiliary Bldg Malfunctioned. Caused by Fire Door Blocked to Allow Personnel Access.Card Reader Reworked & Returned to Svc 830405 + (06:51:19, 21 December 2024)
- 05000281/LER-1983-015-03, /03L-0:on 830402,PT-27A Revealed That Amp Readings for Heat Tracing Panel 10 Circuit 1B & Panel 11 Circuits 2A, 4A & 6B Below Acceptance Criteria.Caused by Excessive Heat. Defective Heat Tracing Replaced & Design Change Init + (06:51:21, 21 December 2024)
- 05000327/LER-1983-053-03, /03L-0:on 830331,during Review of Maint Requests, Discovered That on 830319 Steam Generator Blowdown Isolation Valve 1-FC-1-14 Would Not Stay Open & Surveillance Instruction SI-166.6 post-maint Stroke Test Not Performed + (06:51:23, 21 December 2024)
- 05000335/LER-1983-021, Forwards LER 83-021/03L-0 + (06:51:24, 21 December 2024)
- 0CAN048325, Ack Receipt of W/Corrections to Safety Evaluation for Proposed Spent Fuel Pool Storage Expansion.Statement 15 Corrected to Indicate Divers Will Not Be Permitted to Exceed 1 Rem Whole Body,Per 830428 Discussion W/G Vissing + (06:51:25, 21 December 2024)
- ML20023B494 + (06:51:27, 21 December 2024)
- ML20023B495 + (06:51:27, 21 December 2024)
- 05000327/LER-1983-053, Forwards LER 83-053/03L-0 + (06:51:29, 21 December 2024)
- ML20023B490 + (06:51:30, 21 December 2024)
- 05000281/LER-1983-016-03, /03L-0:on 830329,signal from B Steam Line Pressure Transmitter PT-2-485 Increased Approx 300 Mv,Rendering Transmitter Inoperable.Cause Not Determined.Basis Adjusted & Transmitter Calibr & Returned to Svc + (06:51:31, 21 December 2024)
- IR 05000443/1983005 + (06:51:34, 21 December 2024)
- ML20023B486 + (06:51:35, 21 December 2024)
- ML20023B485 + (06:51:36, 21 December 2024)
- ML20023B483 + (06:51:37, 21 December 2024)
- ML20023B482 + (06:51:38, 21 December 2024)
- ML20023B480 + (06:51:39, 21 December 2024)
- ML20023B479 + (06:51:40, 21 December 2024)
- B10726, Provides Progress Rept on Piping Mods Completed During Cycle 12 Refueling Outage Re SEP Topic III-6, Seismic Design Considerations, Per 820927 Commitment + (06:51:41, 21 December 2024)
- ML20023B477 + (06:51:43, 21 December 2024)
- ML20023B476 + (06:51:47, 21 December 2024)
- ML20023B475 + (06:51:48, 21 December 2024)
- 05000271/LER-1983-011-03, /03L-0:on 830325,during Visual Insp,Shock Suppressor MS-6 on Main Steam a Piping Found W/No Visible Fluid in Sight Glass & Failed to Lock Up.Caused by Damaged Lenztee.Snubber Cleaned & Rebuilt + (06:51:49, 21 December 2024)
- ML20023B472 + (06:51:50, 21 December 2024)
- ML20023B471 + (06:51:51, 21 December 2024)
- ML20023B469 + (06:51:52, 21 December 2024)
- 05000271/LER-1983-011, Forwards LER 83-011/03L-0 + (06:51:57, 21 December 2024)
- ML20023B465 + (06:51:58, 21 December 2024)
- ML20023B463 + (06:51:59, 21 December 2024)
- ML20023B461 + (06:52:00, 21 December 2024)
- ML20023B460 + (06:52:01, 21 December 2024)
- ML20023B459 + (06:52:02, 21 December 2024)
- ML20023B457 + (06:52:03, 21 December 2024)
- ML20023B455 + (06:52:04, 21 December 2024)
- ML20023B453 + (06:52:06, 21 December 2024)
- ML20023B450 + (06:52:08, 21 December 2024)
- AECM-83-0160, Forwards Revised Pages & Response to NRC Comments Re Physical Security Plan,Revs 7 & 5,respectively.Encls Withheld (Ref 10CFR2.790) + (06:52:09, 21 December 2024)
- ML20023B449 + (06:52:09, 21 December 2024)
- AECM-83-0116, Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (06:52:11, 21 December 2024)
- ML20023B445 + (06:52:13, 21 December 2024)
- ML20023B443 + (06:52:14, 21 December 2024)
- ML20023B441 + (06:52:15, 21 December 2024)
- 05000395/LER-1983-033-03, /03L-0:on 830331,while in Mode 5,source Range Detectors N-31 & N-32 Lost for Approx 5 Minutes.Caused by Maint Personnel Error in Placing Trains of Solid State Protection Sys in Wrong Position.Personnel Cautioned + (06:52:16, 21 December 2024)