Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023B868 + (06:46:17, 21 December 2024)
- ML20023B867 + (06:46:18, 21 December 2024)
- ML20023B866 + (06:46:19, 21 December 2024)
- ML20023B864 + (06:46:20, 21 December 2024)
- ML20023B856 + (06:46:25, 21 December 2024)
- ML20023B857 + (06:46:25, 21 December 2024)
- ML20023B854 + (06:46:26, 21 December 2024)
- 05000295/LER-1983-004, Updated LER 83-004/99X-1,canceling Original Rept + (06:46:34, 21 December 2024)
- ML20023B840 + (06:46:35, 21 December 2024)
- ML20023B837 + (06:46:39, 21 December 2024)
- ML20023B836 + (06:46:40, 21 December 2024)
- ML20023B835 + (06:46:40, 21 December 2024)
- RBG-14-887, Interim Deficiency Rept DR-105 Re Electrical Separation of Reactor Protection Sys Wiring from NSSS Shutoff Wiring. Initially Reported on 830329.Investigation Incomplete.Next Rept Expected by 830701 + (06:46:41, 21 December 2024)
- TAC:49241 + (06:46:42, 21 December 2024)
- ML20023B833 + (06:46:43, 21 December 2024)
- 05000220/LER-1981-053-03, /03L-1:on 811120,discovered That Single Failure of Electrical Power Supply Could Either Isolate Both Condenser Sys or Cause Failure to Isolate.Logic for Initiation & Isolation of Condenser Sys Reviewed + (06:46:45, 21 December 2024)
- 05000220/LER-1981-053, Forwards LER 81-053/03L-1 + (06:46:48, 21 December 2024)
- A03124, Responds to 830316 Request for Plans for Cycle 6 Reload Outage Steam Generator Insp.Tube Defect Assessment & Supplementary Steam Generator Testing Program Tables Encl + (06:46:51, 21 December 2024)
- ML20023B829 + (06:46:51, 21 December 2024)
- 05000237/LER-1983-024-03, /03L-0:on 830403,while Performing Core Spray Operability Test,Valve Mo 1402-4A Failed to Open.Caused by Burned Out Motor.Motor Replaced + (06:46:54, 21 December 2024)
- TAC:51697 + (06:46:55, 21 December 2024)
- ML20023B826 + (06:46:56, 21 December 2024)
- ML20023B824 + (06:46:57, 21 December 2024)
- IR 05000295/1983006 + (06:46:58, 21 December 2024)
- 05000237/LER-1983-024, Forwards LER 83-024/03L-0 + (06:47:00, 21 December 2024)
- ML20023B820 + (06:47:02, 21 December 2024)
- 05000315/LER-1983-030-03, /03L-0:on 830402,while on Tour,Security Guard Discovered Diesel Room AB Cardox Sys Isolated W/No One in Room.Caused by Personnel Error.Operator Instructed on Proper Procedures for Exiting Carbon Dioxide Protected Areas + (06:47:03, 21 December 2024)
- ML20023B818 + (06:47:04, 21 December 2024)
- ML20023B816 + (06:47:05, 21 December 2024)
- 05000315/LER-1983-029-03, /03L-0:on 830405,control Room Access Fire Door 412 Would Not Operate Properly.Caused by Extension Rod Being Pulled Loose from Door Frame Shoe.Shoe Set Screws Replaced & Extension Rod Reinstalled + (06:47:06, 21 December 2024)
- ML20023B813 + (06:47:07, 21 December 2024)
- 05000315/LER-1983-028-03, /03L-0:on 830331,after Completion of Surveillance Test on Solid State Protection Sys Train a & Review by Maint Supervisor,Sys Declared Inoperable to Troubleshoot Possible Problem W/Safety Injection Reset Time Delay + (06:47:09, 21 December 2024)
- ML20023B811 + (06:47:10, 21 December 2024)
- ML20023B808 + (06:47:10, 21 December 2024)
- ML20023B806 + (06:47:11, 21 December 2024)
- ML20023B803 + (06:47:14, 21 December 2024)
- ML20023B802 + (06:47:15, 21 December 2024)
- 05000373/LER-1983-033, Forwards LER 83-033/03L-0 + (06:47:16, 21 December 2024)
- ML20023B799 + (06:47:17, 21 December 2024)
- ML20023B798 + (06:47:18, 21 December 2024)
- ML20023B797 + (06:47:18, 21 December 2024)
- 05000254/LER-1983-016-03, /03L-0:on 830331,reactor Operator Found RHR Discharge Pressure Greater than 90 Psig,Exceeding Tech Spec Range.Caused by Valve Leaking from Condensate Transfer Sys Into RHR Discharge Piping.Mod Implemented + (06:47:20, 21 December 2024)
- ML20023B794 + (06:47:21, 21 December 2024)
- 05000254/LER-1983-016, Forwards LER 83-016/03L-0 + (06:47:22, 21 December 2024)
- PNO-I-83-045, on 830503,shutdown Initiated Due to Containment Pressure Increase to 0.6 Psi & Unidentified Containment Leakage of 5.4 Gpm.Recirculation Pump Cooling Water Leakage Noted + (06:47:25, 21 December 2024)
- ML20023B787 + (06:47:27, 21 December 2024)
- ML20023B786 + (06:47:27, 21 December 2024)
- ML20023B784 + (06:47:28, 21 December 2024)
- ML20023B783 + (06:47:28, 21 December 2024)
- ML20023B781 + (06:47:29, 21 December 2024)
- ML20023B780 + (06:47:30, 21 December 2024)