ML20023B794
| ML20023B794 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/29/2020 |
| From: | Richard Chang NRC/OCIO |
| To: | Bauder D Southern California Edison Co |
| Chang R | |
| References | |
| Download: ML20023B794 (3) | |
Text
January 29, 2020 Mr. Doug Bauder Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
CHANGE IN NRC STAFF PROJECT MANAGEMENT FOR SAN ONOFRE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3
Dear Mr. Bauder:
This letter provides notification of a change to the Decommissioning Project Manager assigned to the San Onofre Nuclear Generating Station, Units 1, 2, and 3. Effective February 3, 2019, project management responsibilities for your license Nos. DPR-13; NPF-10; and NPF-15 have been assigned to Richard Chang. Mr. Chang can be contacted by telephone at 301-415-5888 or by e-mail at Richard.Chang@nrc.gov.
Future official correspondence should be directed to the Document Control Desk with a copy sent directly to:
Richard Chang, Project Manager U.S Nuclear Regulatory Commission Mailstop T5A10 Washington, DC 20555-0001
D Bauder In accordance with Title 10 Code of Federal Regulation (CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Bruce Watson, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Materials Safety and Safeguards Docket Nos.: 50-206; 50-361; 50-362 License Nos.: DPR-13; NPF-10; NPF-15 cc: SONGS Listserv
ML20023B794 *Via Email OFC DUWP DUWP DUWP NAME R. Chang Z. Cruz B. Watson DATE 1 / 27/20 1 /27/20 01/ 29/20