Application for Amend to Licenses DPR-53 & DPR-69,changing Tech Spec to Clarify Wording of Surveillance Requirements for Sealed Souces Each Time Reactor Startup Occurs.Fee Encl
ML20023B806
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/27/1982
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML20023B807 List:
References
NUDOCS 8305060402
Download: ML20023B806 (5)


Text

_

BALTIM ORE GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTHUR E. LUNDVALL. JR.

VtCE PRESJDEtwT p ,

SUPPLv Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ATTENTION: Mr. Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2, Docket Nos. 50-317 and 50-318 Request for Amendment Gentlemen:

The Baltimore Gas and Electric Company hereby requests an amendment to its Operating License Nos. DPR-53 & DPR-69 for Calvert Cliffs Unit Nos.1 & 2, respectively, with the submittal of the enclosed proposed changes to the Technical Specifications.

CHANGE NO.1 (BG&E FCR 83-46)

Remove existing page 3/4 7-63 and 64 of Unit Nos. I and 2 Technical Specifications and insert new, revised pages 3/4 7-63 and 64, Attachment I to this transmittal.

()O DISCUSSION AND JUSTIFICATION Sck! The proposed change is administrative only, and provides a wording clarification to the d surveillance requirements for sealed sources. The C-E Standard Technical Specifications n 0 0 in NUREG-0212, were revised in November 5,1980, to reflect this new wording. The

y. 30 wording in the current Technical Specifications could lead to misinterpretation of Surveillance Requirement 4.7.9.1.2.c as requiring a test for sealed source leakage each time a reactor startup occurs. This is clearly not the intent, because these sources are located in the reactor vessel and would require removal of the reacter vessel head and the detectors for testing. With the revised wording, it is clear that this test is not required if the detectors have been previously subjected to core flux.

In addition, the change corrects an inadvertant deletion of the words "or installation in the core", making the wording consistent with the Standard Technical Specifications.

8305060402 830427 PDR ADOCK 05000317 P PDR

Mr. R. A. Clark April 27,1983 Page 2 Since the change is administrative only, no reduction in the bases used in the Technical Specifications will result. Since the change involves no significant effect on existing or postulated accidents it has been determined that no significant change to the Updated Final Safety Analysis Report will result.

CHANGE NO. 2 (BG&E FCR 83-13)

Remove existing page 3/4 7-31 of Unit 1 Technical Specifications and replace with attached marked up page 3/4 7-31, Attachment 2 to this transmittal.

DISCUSSION AND JUSTIFICATION This change deletes snubber 1-38-4 from the Unit 1 Technical Specifications. This snubber was deleted under an earlier modification which installed the RCS head vent and Pressurizer vent piping. Reclassification of the system upstream of and including the main solenoid valves as Seismic Class 1 allowed deletion of the snubber, since it was no longer required.

Since this change is being made to correct the Technical Specifications to reflect current system configuration, it will not result in any significant effect on any analyzed accident or postulated accident in the Updated Final Safety Analysis Report. Additionally, since the snubber is no longer needed or installed, no reduction in the bases for any Technical Specification would result from this change.

CHANGE NO. 3 (BG&E FCR 83-42)

l. For Units 1 and 2 Technical Specifications, Section 6.0 ~ Administrative Controls, l replace the old Figure 6.2.2, " Organization Chart - Calvert Cliffs Nuclear Power j Plant" with the new Figure 6.2.2 enclosed as Attachment 3.
2. For Units 1 and 2 Technical Specifications, Section 6.0 Administrative Controls, change Section 6.5.1.2, page 6-6, by deleting Supervisor-Nuclear Fuel Management as a Plant Operations and Safety Review Committee (POSRC) member and adding Principal Engineer-Incore Fuel Management as a POSRC member and also update l the General Foreman job title to General Supervisor as indicated in Attachment 4.

Mr. R. A. Clark April 27,1983 Page 3 ,

l l

l l

DISCUSSION AND 3USTIFICATION Effective June 1,1983 organizational changes will occur at Calvert Cliffs Nuclear Power Plant affecting Section 6.0 of the Technical Specifications in two areas, namely Figure 6.2.2 Organization Chart - Calvert Cliffs Nuclear Power Plant and the composition of the POSRC membership as noted in Section 6.5.1.2., page 6-6.

The position of Supervisor-Nuclear Fuel Management is to be eliminated. The Nuclear Fuel Management group will be divided into two parts,Incore Fuel Management and Fuel Cycle Management both of which report to the General Supervisor-Training and Technical Services. A new position of General Supervisor-Planning and Support will be formed with a Planning and Support staff reporting to him, which will encompass the present responsibilities of the Supervisor-Administrative Services. The job title of General Foreman and Assistant General Foreman-Mechanical will be changed to General Supervisor-Maintenance and Modifications and Assistant General Supervisor-Mechanical, respectively. The job title of Supervisor-Calvert Cliffs Security will be changed to Assistant General Supervisor-Nuclear Security. The new Figure 6.2.2 (Attachment 3) and page 6-6 (Attachment 4) reflects these organizational and title changes.

Since the position of Supervisor-Nuclear Fuel Management will be eliminated, the Principal Engineer of Incore Fuel Management will replace the Supervisor-Nuclear Fuel Management as a POSRC member. The new page 6-6 of the Technical Specifications (Attachment 4) reflects this change.

SAFETY COMMITTEE REVIEW These proposed changes to the Technical Specifications have been reviewed by our Plant Operations and Safety and Off-Site Safety Review Committees, and they have concluded that implementation of these changes will not result in an undue risk to the health and safety of the public.

Mr. R. A. Clark April 27,1983 Page 4 FEE DETERMINATION We have determined, pursuant to 10 CFR Part 170, paragraph 170.22, that this Amendment request consists of three Class I & II amendments for Calvert Cliffs Unit Nos.1 & 2, and accordingly, we are including Baltimore Gas and Electric Company Check No. All2537 in the amount of $4,800.00 to cover the fee for this request.

BALTIMORE GAS AND ELECTRIC COMPANY

,0 ,f ... '

, . L i By: [7e ', / 7A M Yd wt k '

Vice President - Supply

/

AEL/LES/DSE/sjb STATE OF MARYLAND :

TO WIT:

CITY OF BALTIMORE :

Authur E. Lundvall, Jr., being duly sworn states that he is Vice President of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporat' n.-

WITNESS my Hand and Notarial Seal: .< ] t/ _, jg Notary Public My Commission Expires .h

- _/_r/ / ,/ N

" G cc: 3. A. Biddison, Esquire G. F. Trowbridge, Esquire D. H. Jaffe, NRC R. E. Architzel, NRC

.TIMORE GAS AND ELECTRIC COMPANY vtsoon coce 93645-01 CHECA NO ii REF NO INVO!CE NO 'PURCH ASE ORDER : INVOICE DATE i A112_5_33_

DISCOUNT l NET AVOUNT 8996  ; 04 18 83 , j $4,800.00 i

, I.

c1=ca 1= and 2 Technical Specification Changes: FCR 83-13 l

c. Spic. Tables 3.7-4 deletes one snubber and adds I snubber, R 83-42-6.2.2. Sec 6.5.1.2. Reflects recent organizational changes- l 9 c
nd FCR 83-46 Tech. Spec. surveillance 4.7.9.1.2. sealed sources I taitoring i i i
i

! 1 i

i j DETACH THIS PORTION 04 19 83 TOTALS >l $4,800.00 f

BEFORE DEPOSITING CHECK 7 16 A APR l ') 6 3 IsJii BALTIMORE GAS AND ELECTRIC COMPANY V BALTIMORE, MARYLAND 21203

___ AMOUNT [ CHECK huMBER ]

AY EXACTLY **4 ,8 00. 00* * [

$4,800.00**

A112537 O THE U.S. NUCLEAR REGULATORY **

COMMISSION **

ORDER Washington, DC 20555 OF EXyPNED , .,m a ARYLAND NATIONAL DANK T E UtlE ALTIMORE MD.

"O L L 2 5 3 7:i' a:0 5 2000 LG8s: 14 L= 28G 5" 26 DR um si in u mi si u