Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-82-513, Forwards Certificate of Disposition of Matls for SNM Previously Covered Under License SNM-1882 + (00:28:20, 21 December 2024)
- ML20028A615 + (01:33:20, 21 December 2024)
- ML20028A614 + (01:33:22, 21 December 2024)
- PNO-II-82-125, on 821115,util Announced Cancellation of Const of Facility Due to Huge Increases in Estimated Costs. Facility Is 8% Complete + (01:33:24, 21 December 2024)
- ML20028A611 + (01:33:25, 21 December 2024)
- 05000259/LER-1982-082-03, /03L-0:on 821011,continuous Air Monitor 1-90-256 Assumed Downscale Position Due to Miswiring of Alarm Circuit.Caused by Inadequate post-replacement Functional Test After Bell Replacement.Maint Instruction Written + (01:33:27, 21 December 2024)
- 05000259/LER-1982-082, Forwards LER 82-082/03L-0 + (01:33:30, 21 December 2024)
- AECM-82-549, Forwards Monthly Operating Rept for Oct 1982 + (01:33:31, 21 December 2024)
- ML20028A604 + (01:33:31, 21 December 2024)
- 05000259/LER-1982-080-03, /03L-0:on 821013,operator Unable to Manually Increase Speed of Diesel Generator D,Rendering Generator Inoperable.Caused by Dirty Contact on GE Mode Switch or Relay Model 12HFA51A42F.Switch Inspected + (01:33:34, 21 December 2024)
- ML20028A600 + (01:33:35, 21 December 2024)
- 05000259/LER-1982-080, Forwards LER 82-080/03L-0 + (01:33:36, 21 December 2024)
- 05000327/LER-1982-123-01, /01T-0:on 821029 & 1109,during Mode 6 Operation, Control Room Emergency Vent Sys Declared Inoperable Due to Partial Closing of Suction Dampers 0-31A-102 & 0-31A-103. Caused by Duct Vibration.Design Change Being Expedited + (01:33:47, 21 December 2024)
- 05000280/LER-1982-101-03, /03L-0:on 821009,snubbers 1-SHP-HSS-35B, 1-SW-MSS-2,1-S1-HSS-100,1-WFPD-HSS-14,WFPD-HSS-15 & 1-RC-HSS-116 Found Inoperable.Caused by Fitting Leaks & Failure to Stroke Due to Corrosion.Snubbers Replaced + (01:33:49, 21 December 2024)
- ML20028A586 + (01:33:53, 21 December 2024)
- AECM-82-521, Interim Deficiency Rept 4 Re Sheared Bolts on Diesel Generator Rear Crankcase Cover.Initially Reported on 820322. Unit 1 Rear Crankcase Cover Bolts Replaced.Final Rept Will Be Submitted by 830131.Reportable Per Part 21 for Unit 1 + (01:33:54, 21 December 2024)
- 1CAN118206, Advises That No Firm Date Can Be Established for Implementation Schedule for Permanent Mods to ECCS Evaluation Models Presented in NUREG-0630,in Response to + (01:33:56, 21 December 2024)
- ML20028A579 + (01:34:00, 21 December 2024)
- ML20028A576 + (01:34:01, 21 December 2024)
- ML20028A578 + (01:34:01, 21 December 2024)
- 05000395/LER-1982-022-03, /03L-0:on 821012,circuit Breaker for Reactor Bldg Cooling Unit Fan XFN-62B Discovered Open & in Discharged Position.Cause Undetermined.All 480-volt Safeguard Switchgear Checked.Procedures Revised to Verify Position + (01:34:06, 21 December 2024)
- 05000395/LER-1982-022, Forwards LER 82-022/03L-0.Detailed Event Analysis Encl + (01:34:07, 21 December 2024)
- ML20028A572 + (01:34:08, 21 December 2024)
- ML20028A571 + (01:34:13, 21 December 2024)
- ML20028A568 + (01:34:16, 21 December 2024)
- 05000324/LER-1982-121, Forwards LER 82-121/03L-0 + (01:34:26, 21 December 2024)
- ML20028A562 + (01:34:30, 21 December 2024)
- ML20028A560 + (01:34:34, 21 December 2024)
- 05000395/LER-1982-019-03, /03L-0:on 821010,during Initial Startup in Mode 3, Pressurizer PORV Block Valve Mvg 8000C in RCS Found Leaking in Open Position.Caused by Worn Valve Packing.Packing Replaced.Valve Tested & Returned to Operable Status + (01:34:36, 21 December 2024)
- AECM-82-544, Interim Deficiency Rept PRD-82/34 Number 2 Re Incorrect Wipe Setting of Normally Closed Contacts Converted from Open Contacts.Initially Reported on 820802.Part 21 Rept Applies to Unit 1 Only.Final Rept Expected by 830228 + (01:34:37, 21 December 2024)
- 05000395/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Encl + (01:34:40, 21 December 2024)
- ML20028A553 + (01:34:43, 21 December 2024)
- ML20028A554 + (01:34:43, 21 December 2024)
- ML20028A551 + (01:34:44, 21 December 2024)
- ML20028A549 + (01:34:47, 21 December 2024)
- 05000296/LER-1982-048-03, /03L-0:on 821011,following Rod Pattern Adjustment, Calculated R Factor Found Less than R Factor Used to Set Average Power Range Monitor Scram & Rod Block.Caused by Insertion of Pattern Revised Rods + (01:34:48, 21 December 2024)
- A02692, Forwards Results & Comments,Per 821006 Conference Call,On 820803 Control of Heavy Loads, Technical Evaluation Rept. Documentation of Resolution of Open Items Will Be Completed by 830429 + (01:34:50, 21 December 2024)
- 05000296/LER-1982-048, Forwards LER 82-048/03L-0 + (01:34:54, 21 December 2024)
- GO2-82-902, Forwards Updated Response to Revision 1 to IE Bulletin 82-01, Alterations of Radiographs of Welds in Piping Subassemblies. Final Rept Will Be Submitted When Work on Welds Completed + (01:35:01, 21 December 2024)
- GO2-82-898, Final Deficiency Rept Re Incorrect Jones Control,Inc Instrumentation Piping Design.Initially Reported on 820720. Latest Thermal Displacement Data Will Be Maintained Up to Date + (01:35:03, 21 December 2024)
- ML20028A535 + (01:35:17, 21 December 2024)
- ML20028A533 + (01:35:18, 21 December 2024)
- 05000302/LER-1982-063-03, /03L-0:on 821011,reactor Bldg Average Air Temp Exceeded 130 F Limit.Caused by Strain on Instrument Air Line Causing Line to Split.Line Replaced on 821011 + (01:35:20, 21 December 2024)
- AECM-82-541, Ro:On 820813,Channel a Tripped & HPCS Initiated on False Low Level Signal.Caused by Failure to Follow Procedures.On 820814,HPCS Initiated by True Low Reactor Water Level Signal from B21-N073 L&R.Procedures Developed to Correct Problems + (01:35:21, 21 December 2024)
- 05000369/LER-1982-073-03, /03L-0:on 820403,during QA Audit of Test Procedures,Incore & Nuclear Instrumentation Sys Correlation Monthly Check Found Not Performed.Caused by Incorrect Test Schedule + (01:35:26, 21 December 2024)
- ML20028A529 + (01:35:27, 21 December 2024)
- ML20028A528 + (01:35:32, 21 December 2024)
- ML20028A527 + (01:35:37, 21 December 2024)
- 05000369/LER-1982-073, Forwards LER 82-073/03L-0 + (01:35:39, 21 December 2024)
- 05000302/LER-1982-063, Forwards LER 82-063/03L-0.Detailed Event Analysis Encl + (01:35:41, 21 December 2024)
- 05000325/LER-1982-108-03, /03L-0:on 821010,safety Relief Valve 1B21-F013J Failed to Reclose Until 50-100 Psig Reactor Pressure Reached.Caused by Faulty Spring within Solenoid Valve. Defective Solenoid Valve & Valve Pilot Assembly Replaced + (01:35:42, 21 December 2024)