Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20028A896 + (00:24:41, 21 December 2024)
- ML20028A894 + (00:24:42, 21 December 2024)
- ML20028A892 + (00:24:43, 21 December 2024)
- 05000278/LER-1982-021-01, /01T-0:on 821101,during Source check,3A Reactor Vent Stack Radiation Monitor Determined Insensitive.Caused by Drift in Instrument Voltage Plateau.Instrument Realigned & Returned to Svc on 821102 + (00:24:48, 21 December 2024)
- ML20028A887 + (00:24:49, 21 December 2024)
- 05000338/LER-1982-060-03, /03L-0:on 821019,station Battery I-IV Failed 18- Month Discharge Surveillance Test.Caused by Natural End of Life.Battery Replaced + (00:24:53, 21 December 2024)
- 05000338/LER-1982-060, Forwards LER 82-060/03L-0 + (00:24:54, 21 December 2024)
- 05000395/LER-1982-024-03, /03L-0:on 821018,plant Went Into Mode 4 W/O Performing Surveillance Test Procedure 114.002, Operational Leak Test. Caused by Procedural Inadequacies.Procedure Revised to Comply W/Tech Spec Requirements + (00:24:56, 21 December 2024)
- 05000366/LER-1982-099-03, /03L-0:on 821028,while Performing RCIC Turbine Exhaust Diaphragm Ft&C Procedure,Pressure Connection on Switch B Broke When Test Equipment Engaged.Caused by Periodic Stress from Monthly Testing.Instrument Calibr + (00:24:58, 21 December 2024)
- 05000366/LER-1982-119-03, /03L-0:on 821018,air Particulate Monitor K631 Found Inoperable Due to Failure to Pass Fission Product Instrument Functional Test Procedure.Caused by Loose Connection on Meter Movement.Connection Tightened + (00:25:00, 21 December 2024)
- 05000366/LER-1982-099, Forwards LER 82-099/03L-0 + (00:25:01, 21 December 2024)
- ML20028A873 + (00:25:02, 21 December 2024)
- 05000325/LER-1982-135-03, /03L-0:on 821019,1.5-inch Discrepancy Between Narrow & Wide Range Instruments Revealed During Performance of Suppression Pool Level Indicator Operability Test.Caused by Inoperability of RTGB Level Instruments + (00:25:04, 21 December 2024)
- 05000366/LER-1982-119, Forwards LER 82-119/03L-0 + (00:25:05, 21 December 2024)
- 05000395/LER-1982-024, Forwards LER 82-024/03L-0.Detailed Event Analysis Encl + (00:25:10, 21 December 2024)
- 05000338/LER-1982-067-03, /03L-0:on 821019,suction to RHR Sys Pumps a & B Lost for 36 Minutes.On 821020,pump Suction Lost for 33 Minutes.Caused by Ambiguous RCS Level Indication While Water Drained to Centerline of Nozzles.Water Added + (00:25:12, 21 December 2024)
- 05000338/LER-1982-067, Forwards LER 82-067/03L-0 + (00:25:14, 21 December 2024)
- 05000373/LER-1982-135-03, /03L-0:on 821021,div 1 ID18-N009B Reactor Bldg Ventilation Process Radiation Monitor Drifted High.Caused by Failed Geiger-Muller Tube Mfg by Lnd.Tube Replaced + (00:25:15, 21 December 2024)
- ML20028A851 + (00:25:23, 21 December 2024)
- 05000416/LER-1982-115-03, /03L-0:on 821022,fire Door OC219 from Control Bldg to West Stairwell Corridor Would Not Properly Close.Caused by Retractor Arm Not Allowing Door to Fully Close.Door Reworked + (00:25:27, 21 December 2024)
- 05000373/LER-1982-135, Forwards LER 82-135/03L-0 + (00:25:32, 21 December 2024)
- 05000416/LER-1982-115, Forwards LER 82-115/03L-0 + (00:25:34, 21 December 2024)
- ML20028A844 + (00:25:35, 21 December 2024)
- ML20028A841 + (00:25:37, 21 December 2024)
- ML20028A837 + (00:25:37, 21 December 2024)
- AECM-82-554, Documents 821116 Telcon W/J Clifford Re Resolution of NRC Comments on Emergency Operating Procedures.Comments for Inclusion Into Emergency Operating Procedures Encl + (00:25:38, 21 December 2024)
- ML20028A832 + (00:25:40, 21 December 2024)
- ML20028A825 + (00:25:41, 21 December 2024)
- ML20028A823 + (00:25:42, 21 December 2024)
- ML20028A820 + (00:25:43, 21 December 2024)
- ML20028A817 + (00:25:44, 21 December 2024)
- ML20028A816 + (00:25:45, 21 December 2024)
- ML20028A815 + (00:25:46, 21 December 2024)
- ML20028A814 + (00:25:47, 21 December 2024)
- ML20028A812 + (00:25:48, 21 December 2024)
- ML20028A809 + (00:25:49, 21 December 2024)
- ML20028A804 + (00:25:50, 21 December 2024)
- ML20028A801 + (00:25:51, 21 December 2024)
- ML20028A796 + (00:25:52, 21 December 2024)
- ML20028A795 + (00:25:55, 21 December 2024)
- ML20028A791 + (00:25:56, 21 December 2024)
- ML20028A793 + (00:25:56, 21 December 2024)
- ML20028A790 + (00:25:57, 21 December 2024)
- ML20028A788 + (00:25:57, 21 December 2024)
- W3P82-3465, Forwards Public Version of Revised Public Info Booklet.Info Will Be Submitted to ASLB by 821112.Info Revised from 821021 Version Indicated in Margin + (00:25:58, 21 December 2024)
- ML20028A783 + (00:26:01, 21 December 2024)
- ML20028A781 + (00:26:02, 21 December 2024)
- ML20028A779 + (00:26:02, 21 December 2024)
- ML20028A776 + (00:26:04, 21 December 2024)
- ML20028A773 + (00:26:05, 21 December 2024)
- L-82-259, Forwards Revision 1 to Security Plan.Revision Withheld + (00:26:06, 21 December 2024)