Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032A321 + (17:22:27, 20 December 2024)
- ML20032A319 + (17:22:28, 20 December 2024)
- ML20032A318 + (17:22:29, 20 December 2024)
- 05000296/LER-1981-050, Forwards LER 81-050/03L-0 + (17:22:31, 20 December 2024)
- 05000369/LER-1981-159-03, /03L-0:on 810915,while in Mode 3,boron Injection Tank Discharge Isolation Valve Began Binding While Opening After Adjustment to Packing.Cause Undetermined.Packing Loosened & Valve Cycled Manually.Motor Replaced + (17:22:33, 20 December 2024)
- ML20032A314 + (17:22:34, 20 December 2024)
- ML20032A313 + (17:22:34, 20 December 2024)
- 05000369/LER-1981-159, Forwards LER 81-159/03L-0 + (17:22:36, 20 December 2024)
- 05000282/LER-1981-023-03, /03L-0:on 810921,during Surveillance Test,One Cooling Water Header Isolation Valve Did Not Close Fully. Caused by Wet Motor Leads in Junction Box.Wiring Renewed + (17:22:38, 20 December 2024)
- ML20032A307 + (17:22:40, 20 December 2024)
- PNO-I-81-117, on 811021,offgas Holdup Isolation Valve Failed Closed Requiring Power Reduction & Reactor Shutdown to Avoid Condenser Vacuum Loss.Caused by Cutting nonsafety-related Instrument Control Wiring + (17:22:41, 20 December 2024)
- 05000282/LER-1981-023, Forwards LER 81-023/03L-0 + (17:22:43, 20 December 2024)
- ML20032A303 + (17:22:44, 20 December 2024)
- 05000369/LER-1981-152-03, /03L-0:on 810831,steam Generator 1C Main Feed to Auxiliary Feedwater Nozzle Isolation Valve Would Not Operate Electrically from Control Room.Caused by Burned Out Motor & Flasher for Overload Heater.Motor Replaced + (17:22:46, 20 December 2024)
- ML20032A299 + (17:22:47, 20 December 2024)
- ML20032A298 + (17:22:48, 20 December 2024)
- ML20032A295 + (17:22:52, 20 December 2024)
- 05000369/LER-1981-152, Forwards LER 81-152/03L-0.Detailed Event Analysis Encl + (17:22:54, 20 December 2024)
- ML20032A291 + (17:22:56, 20 December 2024)
- ML20032A286 + (17:23:05, 20 December 2024)
- PM-81-883, Ro:On 811001,reactor Scram Received from Group 1 Isolation, Resulting in Loss of Reactor Feed Pumps & Subsequent Reactor Water Level Reduction.Hpci Manually Started in Full Flow Test Condensate Storage Tank,Reducing Reactor Pressure + (17:23:06, 20 December 2024)
- ML20032A284 + (17:23:09, 20 December 2024)
- ML20032A282 + (17:23:11, 20 December 2024)
- ML20032A279 + (17:23:12, 20 December 2024)
- ML20032A275 + (17:23:13, 20 December 2024)
- ML20032A274 + (17:23:17, 20 December 2024)
- ML20032A273 + (17:23:18, 20 December 2024)
- ML20032A272 + (17:23:19, 20 December 2024)
- ML20032A270 + (17:23:20, 20 December 2024)
- ML20032A269 + (17:23:22, 20 December 2024)
- 05000302/LER-1981-031-04, /04L-1:on 810806,environ Monitoring Program Found to Be Not in Conformance W/Established Procedures.Caused by Contractor Failure to Follow Procedures in Eight Areas. Procedures Clarified & Corrective Actions Completed + (17:23:24, 20 December 2024)
- ML20032A265 + (17:23:28, 20 December 2024)
- ML20032A264 + (17:23:29, 20 December 2024)
- ML20032A263 + (17:23:30, 20 December 2024)
- ML20032A262 + (17:23:33, 20 December 2024)
- ML20032A258 + (17:23:34, 20 December 2024)
- ML20032A257 + (17:23:35, 20 December 2024)
- ML20032A256 + (17:23:36, 20 December 2024)
- ML20032A254 + (17:23:37, 20 December 2024)
- ML20032A253 + (17:23:38, 20 December 2024)
- ML20032A248 + (17:23:42, 20 December 2024)
- ML20032A246 + (17:23:42, 20 December 2024)
- ML20032A245 + (17:23:43, 20 December 2024)
- ML20032A244 + (17:23:43, 20 December 2024)
- ML20032A242 + (17:23:45, 20 December 2024)
- ML20032A241 + (17:23:49, 20 December 2024)
- ML20032A237 + (17:24:01, 20 December 2024)
- ML20032A234 + (17:24:02, 20 December 2024)
- ML20032A233 + (17:24:04, 20 December 2024)
- ML20032A231 + (17:24:08, 20 December 2024)
- ML20032A226 + (17:24:09, 20 December 2024)