Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032D581 + (16:09:28, 20 December 2024)
- 05000272/LER-1981-095-03, /03L-0:on 811008,auxiliary Alarm Annunciator Was Printing Erroneous Alarms Rendering Containment Sump Level Monitoring Sys Inoperable.Caused by Loose Printed Circuit Card in Connector.Card Replaced + (16:09:29, 20 December 2024)
- ML20032D579 + (16:09:30, 20 December 2024)
- A01993, Comments on NRC 810909 Evaluations for SEP Topics V-10.B, RHR Reliability, V-11.B, RHR Interlock Requirements & VII-3, Sys Required for Safe Shutdown. Procedures for Placing Overpressure Protection Sys in Svc Are Adequate + (16:09:32, 20 December 2024)
- 05000272/LER-1981-095, Forwards LER 81-095/03L-0.Detailed Event Analysis Encl + (16:09:34, 20 December 2024)
- ML20032D574 + (16:09:36, 20 December 2024)
- ML20032D573 + (16:09:37, 20 December 2024)
- ML20032D572 + (16:09:38, 20 December 2024)
- ML20032D571 + (16:09:40, 20 December 2024)
- ML20032D570 + (16:09:42, 20 December 2024)
- ML20032D568 + (16:09:43, 20 December 2024)
- ML20032D567 + (16:09:49, 20 December 2024)
- ML20032D564 + (16:09:51, 20 December 2024)
- 05000320/LER-1981-027-03, /03L-0:on 811007,during Annual Surveillance of Firewall-50 Seals,Some Seals Found Deficient.Caused by Cracks Which Developed in Fire Barrier Penetrations Due to Dehydration of Barriers.Cracks Repaired + (16:09:53, 20 December 2024)
- PM-81-949, Forwards Monthly Operating Rept for Oct 1981 + (16:09:55, 20 December 2024)
- ML20032D560 + (16:09:57, 20 December 2024)
- ML20032D559 + (16:09:58, 20 December 2024)
- ML20032D558 + (16:09:59, 20 December 2024)
- ML20032D557 + (16:10:03, 20 December 2024)
- ML20032D556 + (16:10:04, 20 December 2024)
- ML20032D555 + (16:10:08, 20 December 2024)
- 05000311/LER-1981-108-03, /03L-0:on 811009,individual Rod Position Indicators for Rods 2C1 & 2D2 Disagreed W/Control Rod Bank Demand Indicator by Greater than 12 Steps.Caused by Failed Operational Amplifier.Amplifier Replaced + (16:10:10, 20 December 2024)
- ML20032D553 + (16:10:12, 20 December 2024)
- L-81-435, Responds to IE Bulletin 81-02,Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure. No Westinghouse Mechanical Engineering Div motor-operated Gate Valves Have Been Installed in Safety Related Sys + (16:10:13, 20 December 2024)
- ML20032D550 + (16:10:16, 20 December 2024)
- 05000311/LER-1981-108, Forwards LER 81-108/03L-0.Detailed Event Analysis Encl + (16:10:18, 20 December 2024)
- ML20032D547 + (16:10:19, 20 December 2024)
- ML20032D545 + (16:10:21, 20 December 2024)
- ML20032D544 + (16:10:22, 20 December 2024)
- 05000302/LER-1981-071-01, /01T-0:on 811030,found FSAR Analysis of Steam Generator Tube Rupture Accident Was Not Conservative.Caused by FSAR Assumption That Main Steam Safety Valves Will Not Lift Following Reactor Trip + (16:10:24, 20 December 2024)
- ML20032D542 + (16:10:25, 20 December 2024)
- ML20032D541 + (16:10:27, 20 December 2024)
- 05000302/LER-1981-071, Forwards LER 81-071/01T-0 + (16:10:28, 20 December 2024)
- ML20032D538 + (16:10:34, 20 December 2024)
- ML20032D537 + (16:10:35, 20 December 2024)
- 05000368/LER-1981-033, Forwards LER 81-033/04L-0 + (16:10:40, 20 December 2024)
- ML20032D533 + (16:10:42, 20 December 2024)
- 05000313/LER-1981-013-03, /03L-0:on 810826,leak Discovered in Weld of Drain Line of a Decay Heat Pump Discharge Piping.Cause Believed to Be Vibration Fatigue.Cracked Weld & Associated Drain Line Cut Out,Repiped & Welded Back Into Place.Hanger Added + (16:10:47, 20 December 2024)
- ML20032D530 + (16:10:49, 20 December 2024)
- 05000313/LER-1981-013, Forwards LER 81-013/03L-0 + (16:10:50, 20 December 2024)
- ML20032D527 + (16:10:55, 20 December 2024)
- ML20032D526 + (16:10:59, 20 December 2024)
- ML20032D525 + (16:11:01, 20 December 2024)
- ML20032D523 + (16:11:04, 20 December 2024)
- AECM-81-373, Submits Final Response to IE Bulletin 79-24, Frozen Lines. UHS Water Level Has Been Raised to Ensure 30-day Supply of Water.Standby Svc Water Sensing Lines Now Designed to Be Under 6 Inches of Water.No Freeze Protection Required + (16:11:05, 20 December 2024)
- ML20032D521 + (16:11:07, 20 December 2024)
- ML20032D520 + (16:11:09, 20 December 2024)
- ML20032D519 + (16:11:10, 20 December 2024)
- ML20032D518 + (16:11:14, 20 December 2024)
- ML20032D516 + (16:11:18, 20 December 2024)
- ML20032D515 + (16:11:20, 20 December 2024)