ML20032D521

From kanterella
Jump to navigation Jump to search
Informs That No Westinghouse Electro-Mechanical Div motor- Operated Gate Valves Have Been Installed in Response to IE Bulletin 81-02,Suppl 1.Approx 2 Manhours Expended in Review
ML20032D521
Person / Time
Site: Perkins, Cherokee  Duke Energy icon.png
Issue date: 09/18/1981
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-81-02, IEB-81-2, NUDOCS 8111170212
Download: ML20032D521 (1)


Text

.

'e DUKE POWER COMPANL, GENERAL OFFICES

" 's#'.d!

" ' ' ' 8 8 " '

rs 412 SOUTH CHURCH STRE ET

' CHARLOTTE N. C. 28242 25 A!!

O l'

)

September 18, 1981 Mr. -J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission g ~ )/'4 Region II

/ M(NL(IJL rp{ g '

101 Marietta Street NW, Suite 3100 Atlanta, GA 30303

/~

NOV1e;ggy,3T Re: RII:JP0 tg

v. s. =,4, Docket Nos:

50-491, 50-492, 50-493, 50-488,

\\U.

  • 53 08 m-50-489, 50-490

\\4 4

@,@. h,p IE Bulletin No. 81-02, Supplement 1 4

Duke File:

P81-1412.11-1

Dear Mr. O'Reilly:

In response to your August 18, 1981 letter transmitting Nuclear Regulatory Connission IE Bulletin No. 81-02, Supplement 1, we wish to infonn you that no W-EMD manufactured motor-operated gate valves are or will be installed, or iiiaintained as spares for installation at Cherokee or Perkins Nuclear Stations.

Approximately 2 manhours were expended in the research and preparation of our response to this bulletin supplement.

Very truly yours, i

.:C. Dail, Vice President Design Engineering Department GDR/pam cc: Director, Division of Reactor Operations Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 8111170212 810918" PDR ADOCK 05000488 G

PDR Zf,IIs