Responds to IE Bulletin 81-02,Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure. Three Westinghouse Electro-Mechanical Div motor-operated Gate Valves Installed in Unit 2.Approx 100 Manhours Expended
ML20032D526
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/17/1981
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-81-02, IEB-81-2, NUDOCS 8111170218
Download: ML20032D526 (2)


Text

a;iling Addr;ss Alabama Power Company 600 North 18tn Street Post Office Box 2641 B;rmingham A!abama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

b

%";f,'a"O7"'

Alabama Power J

nsa wrnew espwm September 17, 1981 N

Docket No. 50-348

,e

/

No. 50-364 g

s t1h h Mr. J. P. O'Reilly NOV16198b-U. S. Nuclear Regulatory Commission Region II, Suite 3100

" *E%d%""

~

c V

?

101 Marietta Street, N. W.

Atlanta, Georgia 30303 kWlly Q W N-

Dear Mr. O'Reilly:

IE Bulletin 81-02, entitled " Failure of Gate Type Valves to Close Against Differential Pressure," requested each licensee to determine whether any Westinghouse EMD manufactured gate valves have been installed or maintained as spares in safety related applications where they are required to close against certain differential pressures.

In our letter dated May 8,1981, Alabama Power Company stated that it had been determined that no Westinghouse EMD valves had been installed or maintained as spares in any safety related system in either Unit 1 or 2 where differential pressures would be in excess of the threshold values stated in the bulletin.

Supplement 1 of the subject bulletin requested each licensee to determine whether any Westinghouse EMD manufactured motor operated gate valves have been installed or maintained as spares in any safety related system where they are required to close against a differential pressure.

In accordance with this request, Alabama Power Company conducted a review of safety related systems at Farley Nuclear Plant Units 1 and 2.

As a result of this review, it was determined that three Westinghouse EMD manufactured gate valves have been installed in the Unit 2 RHR system.

Two of the three valves identified are Model 3GM99 valves which are located in the RHR miniflow lines. The differential pressure across these valves is approximately 150 psi; whereas, the threshold differential pressure value, below which the bulletin indicates that the valve has been demonstrated to consistantly close, is 750 psi. The third valve identified is a 14GM84 located in the line from the containment sump to the suction of RHR pump 2A.

The differential pressure across this valve is approximately 100 psi; whereas, the threshold differential pressure value, below which the valve has been demonstrated to consistantly close, is 300 psi.

Since all three of these valves operate at differential pressures lower 9111170218 910917 PDR ADOCK 05000348 G

PDR 1 EIl u

o..gp6 Mr. J. P. O'Reilly September ~17, 1981 U. S. Nuclear Regulatory Commission Page 2 than those at which Westinghouse EMD valves have successfully operated, it is Alabama Power Company's position that the concerns expressed in the subject bulletin do not apply to the valves installed at Farley Nuclear Plant. No Westinghouse EMD valve is being maintained as a spare.

As requested in your letter transmitting the subject bulletin, an estimated 100 manhours were expended in conducting this review.

If you have any questions, please advise.

Yours very truly, i

<ZL__

Qu W~

Clayten, Jr.

d f

FLCJr/RWS:jc cc: Mr. R. A. Thomas SWORN TO AND SUBSCRIBED BEFORE Mr. G. F. Trowbridge ME THIS,

/ 5Lo<(

DAY OF Mr. E. A. Reeves jse ct/',

, 1981.

Mr. W. H. Bradford

/

Office of I&E

{

Division of Reactor fn Operation Inspection

%LW Washington, D. C.

O' Notary Public My Commission Expires:

Z- /9 s2 l-2

+