Text
The Light comparty il_>,, uto,,_ m e.,x im ii_,,_.sx,omi gios.mii Mr Karl Seyfrit Ibvember 9,1981 Director, Region IV ST-HL-AE-750 Nuclear Regulatory Ctrmission 611 Ryan Plaza Drive, Suite 1000 SFN: V-0100 Arlington, 7bxas 76012 Sn'JDI TEXAS PRCDEi~.T.
UNITS 1 AND 2 DOCKET NOS. SIN 50-498, STN 50-499 SAFETI RELATED CONSTRUCTICN WORK
Dear Mr Seyfrit:
This letter supersedes our letter of Octooer 16, 1981, requesting concurrence to procec3 on certain safety related construction activities.
As we discussed with you on October 15, 1981, we have previously announced our intention to change the contractor for the engineering and construction m nagement responsibilities for South Texas Project and are in the process or developing a transition plan for accmplishing same.
On November 4, 1981, it was concluded that Houston Lighting & Power and Brchn & Root could not reach an agrement on the basis for Brchn & Root continuing as constructor. Therefore, Brown & Root has decided to withdraw ccrnpletely frcm the project.
Brown & Root has agreed to effect an orderly withdrawal and to main-tain an organization for site maintenance until a new contractor assumes responsibility for this work.
Attachment I is a list of safety related activities that should be performed during this new transition phase. HL&P and the Bechtel Power Corporation, acting as HL&P's consultant, developed Attachnent I utilizing the sole criterion: what essential activities must continue to maintain, preserve, or protect safety related structures, systas, or equigxmt during the transition period. We estimate that this work will take place over approximately the next six months. During this period, Bechtel's OA sta E will augment our staff in performing quality surveillance over this work.
In Attachment "A" to our letter of October 16, 1981, we listed a nunber of safety related items that would be continuing during the next four months. Since Brown & Root will not continue as constructor, we plan to bring their current safety related construction activities (previously authorized by Eagion IV) to an orderly conclusion on or before Deceber 1, 1981. The only safety related work which will continue beyond Decmber 1, 1981, is listed in Attachnent I.
8111170228 8111,3 ATTACHMENT 1 PDR ADOCK 05000 0
mm m.
Houston Lufting & lbwr Company,
SFHL-AE-750 SEN: V-0100 Mr Karl Seyfrit Novanber 9,1981 4
- As a matter of information, Attachnent II is included and describes the work that we are continuing in non-safety related areas.
i Accordingly," we respectfully request your concurrence with this plan for perfonrance of South Texas Project safety related work.
Very truly yours,
~Y.
J H Goldberg, Vicc-President Nuclear Engineering and Construction JHG/aks Enclosures I
f O
e-
,n s
m,-
,-v n-n
~ -
- +--
--,s 3
flouuon Lighting & Power Company November 9, 1981 cc:
J. H. Goldberg J. G. Dewease SP-HL-AE-750 D. G. Barker SFN: V-0100 C. G. Robertson Howard Pyle R. L. Waldrop H. R. Dean R. A. Frazar D. R. Beeth J. D. Parsons J. W. Williams J. W. Briskin J. E. Geiger STP RMS H. S. Phillips (NRC)
J. O. Read (Read-Poland, Inc.)
M. D. Schwarz (Baker & Botts)
R. Gordon Gooch (Baker & Botts)
J. R. New=an (Lowenstein, Newman, Reis, & Axelrad)
H. B. Friend (Bechtel)
D. W. Halligan (Bechtel)
Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 R. L. Range /G. W. Muench Charles Bechhoefer, Esquire Central Power & Light Co=pany Chairman, Atomic Safety & Licensing Board P. O. Ecx 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 R. L. Hancock/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washinton, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Coc=ission Washington, D. C.
20555
ATTACHMENT I SOUI11 TEXAS PIO. BCT 7
SAFETt REIATED OR PARTIALLY SAETIY RELATED CONSTRUCTION ACTIVITIES 70 CCNTINUE DURING TRANSITION PHASE (about 6 Itos.)
1.
Jobsite mintenance (including)
A.
Maintenance of dewatering system i
B.
Maintenance of installed equignent C.
General housekeeping D.
7pplication of protective coatings and preservatives for exposed metal surfaces and ccupletion of concrete coating work which has been started in the reactor containment, mechanical and elec+xic auxiliary, and fuel handling buildings 2.
Material Handling A.
Receiving /h'arehousing E.
Preventative maintenance of stored equiptent 3.
Maintain records and continue document control 4.
Maintain fire protection systen 5.
Concrete curing 6.
Maintain project site security 7.
Maintain testing facilities as required 8.
Maintain geotechnical nonitoring for settlenent and subsidence Noverber 9, 1981 o
+w--m
---m
,,.,, ore--
,r--
~
ATTACINENT I7.
SOUIE TEXAS PRCUECT NON-SAFEIY REIATED OCESTRUCTION ACTIVITIES 'IO CONTINUE DURING TRANSITICN PHASE (about 6 mos.)
a 1.
Jobsite mintenance (including)
A.
General housekeeping and maintenance of roads and ditches B.
mintenance of construction equipnent 2.
Site dewatering well point, operate and maintain 3.
Dxestic water wells systen, operate and maintain 4.
Potable water, operate and maintain A.
Chlorinator B.
Ice facility and distribution 5.
Fire protection systen A.
Pmps (O & M)
B.
Fire truck (O & M)
C.
Portable Equignent (O & M) 6.
Concrete curing, continuation 7.
Sewa y treatment facility (O & M) 8.
Weed / grass control 9.,
Construction power maintenance
- 10. Construction ccrmunication maintenance
- 11. Trash disposal
- 12. First-aid facility, operate
- 13. Weather / storm protection, provide and maintain
- 14. Continue preparation and issue of required reports to governmental bodies
- 15. Shut down and maintain concrete batch plant
- 16. Varmint control Novenber 9,1981 er
~
w~---_-,m y
w 7
-w--