Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M83906 + (11:51:04, 20 December 2024)
- ML20034G573 + (11:51:04, 20 December 2024)
- ML20034G572 + (11:51:05, 20 December 2024)
- ML20034G571 + (11:51:06, 20 December 2024)
- ML20034G569 + (11:51:07, 20 December 2024)
- ML20034G568 + (11:51:08, 20 December 2024)
- ML20034G567 + (11:51:09, 20 December 2024)
- 05000219/LER-1993-003, :on 930130,reactor Scram Initiated While Performing Sys Lineups to Return Crds to Normal Configuration.Caused by Inadequate Procedure.Scram Signal Bypassed,Sdv Drained & Scram Reset + (11:51:11, 20 December 2024)
- ML20034G565 + (11:51:12, 20 December 2024)
- ML20034G563 + (11:51:14, 20 December 2024)
- ML20034G561 + (11:51:14, 20 December 2024)
- ML20034G560 + (11:51:15, 20 December 2024)
- ML20034G558 + (11:51:16, 20 December 2024)
- ML20034G557 + (11:51:17, 20 December 2024)
- ML20034G556 + (11:51:18, 20 December 2024)
- ML20034G555 + (11:51:19, 20 December 2024)
- ML20034G554 + (11:51:21, 20 December 2024)
- ML20034G552 + (11:51:22, 20 December 2024)
- ML20034G551 + (11:51:23, 20 December 2024)
- ML20034G549 + (11:51:24, 20 December 2024)
- ML20034G546 + (11:51:28, 20 December 2024)
- ML20034G544 + (11:51:29, 20 December 2024)
- PNO-IV-93-008, on 930304,truck Shipment of Low Level Waste Enroute to Richland,Wa from Plant Left Highway & Impacted Guard Rail.Caused by Ice on Highway.Second Rig Also Impacted Truck.Trailer Damaged.State Authorities Notified + (11:51:31, 20 December 2024)
- ML20034G541 + (11:51:33, 20 December 2024)
- ML20034G540 + (11:51:35, 20 December 2024)
- ML20034G539 + (11:51:36, 20 December 2024)
- 05000352/LER-1993-002-02, :on 930206,identified Closure of Primary Containment Isolation Valve in Instrument Gas Sys Due to Faulty Microswitch within Pressure Differential Switch. Microswitch & PCIV Handswitch Replaced + (11:51:40, 20 December 2024)
- PNO-IV-93-008A, on 930304,truck Shipment Enroute from Plant to Richland,Wa Involved in Accident in Or.No Personnel Injuries Resulted.Shipping Cask Dislodged or Damaged.Repairs Made Enabling Truck to Complete Transport to Wa + (11:51:43, 20 December 2024)
- ML20034G535 + (11:51:44, 20 December 2024)
- ML20034G533 + (11:51:45, 20 December 2024)
- ML20034G527 + (11:51:55, 20 December 2024)
- 05000499/LER-1993-007, Reactor Trip Due to Low SG Water Level.Corrective Actions Will Be Addressed in LER 93-007 + (11:51:57, 20 December 2024)
- ML20034G525 + (11:51:59, 20 December 2024)
- ML20034G523 + (11:52:03, 20 December 2024)
- ML20034G520 + (11:52:04, 20 December 2024)
- ML20034G517 + (11:52:05, 20 December 2024)
- ML20034G515 + (11:52:07, 20 December 2024)
- ML20034G514 + (11:52:08, 20 December 2024)
- PY-CEI-NRR-1617, Forwards Temporary Change Notice 3 to Rev 1 to Core Operating Limits Rept for Perry Nuclear Power Plant Unit 1 Cycle 4 (Reload 3) & Rev 2 to 23A7147, Supplemental Reload Licensing Rept for Perry Nuclear Power Plant Unit 1.. + (11:52:09, 20 December 2024)
- ML20034G508 + (11:52:11, 20 December 2024)
- ML20034G506 + (11:52:12, 20 December 2024)
- ML20034G505 + (11:52:14, 20 December 2024)
- ML20034G504 + (11:52:15, 20 December 2024)
- ML20034G502 + (11:52:16, 20 December 2024)
- ML20034G501 + (11:52:17, 20 December 2024)
- ML20034G500 + (11:52:18, 20 December 2024)
- ML20034G499 + (11:52:20, 20 December 2024)
- ML20034G498 + (11:52:21, 20 December 2024)
- ML20034G497 + (11:52:22, 20 December 2024)
- ML20034G496 + (11:52:23, 20 December 2024)
- ML20034G494 + (11:52:24, 20 December 2024)