March 4, 1993 Docket No. 50-219 Distribution:
Docket. file-CMcCracken NRC & Local PDRs AMasciantonio I
Mr. John J. Barton PD I-4 Plant Vice President and Director SVarga GPU Nuclear Corporation JCalvo Oyster Creek Nuclear Generating Station SNorris Post Office Box 388 ADromerick Forked River, New Jersey 08731 OGC ACRS (10)
Dear Mr. Barton:
JFRogge, RI
SUBJECT:
RESPONSE TO NRC BULLETIN 92-01, SUPPLEMENT 1, " FAILURE OF THERMO-LAG 330 FIRE BARRIER SYSTEM: - OYSTER CREEK NUCLEAR GENERATING STATION (TAC NO. M83906)
By letter dated September 25, 1992, GPU Nuclear Corporation (GPUN) provided a response to NRC Bulletin 92-01, Supplement 1, for Oyster Creek Nuclear Generating Station.
GPUN's response stated that in accordance with the i
requested actions of the bulletin supplement, the hourly fire watch patrols, i
which were already patrolling locations where Thermo-Lag is installed to protect conduit, were expanded to include coverage of drywell penetrations, HVAC duct and the stairway enclosure. The GPUN response also stated that compensating measures for inoperable fire barriers are in place and these l
compensating measures are expected to remain in place until the fire barriers can be declared operable or testing demonstrates successful 1 or 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> barrier performance.
Further you indicated that GPUN will continue to evaluate information regarding the Thermo-Lag 330 fire barrier material as it becomes available. Actions to restore (or confirm) fire barrier operability are being developed through an industry program being coordinated by NUMARC.
[
GPUN will apply results of the NUMARC program, as appropriate, to the Thermo-Lag fire barriers installed at Oyster Creek.
i The staff has reviewed your response and find it acceptable.
Please inform us when all corrective actions have been completed.
Further NRC review, if any, will be performed by inspection or audit.
Sincerely, Original signed by f
Alexander W. Dromerick, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation cc: See next page f
- See previous concurrence l
c OFFICE LA:PDI-4 PM;P1),1c4 ')
BC:SPLB*
DsPDI-4) i
/
ADro$erick:cn CMcCracken JStb[z~ b NAME o
S/4/93 3 / //93 3/4/93
) /4 /93
/ /
I b:
DATE OFFICIAL RECORD COPY U
l Document Name: M83906 f
I l"" ' '-
'CP 9303100126 930304 90 0 6' C
PDR ADOCK 05000219
'M i
G PDR i
p Mr. John J. Barton Oyster Creek Nuclear GPU Nuclear Corporation Generating Station cc:
Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission 2300 N Street, NW.
Post Office Box 445 Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineerie:
CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 i
Mayor Lacey Township l
818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop:
Site Emergency Bldg.
Post Office Box 388 Forked River, New Jersey 08731 b
?
l 1
l I
l l
- - -