- LD-93-052, Forwards Minor Revs to Draft SER Responses Requested by NRC Reviewer on Sys 80+ QA Program,Including Rev of Table 3.2-1 to Show Graded Quality Classifications for Sys 80+ Structures,Sys & Components + (10:56:34, 20 December 2024)
- 1CAN039306, Forwards Response to NRC 921116 Request for Addl Info Re in- Structure Response Spectra in Order to Complete Review of 920918 Response to Suppl 1 to GL 87-02 on Rev 2 to SQUG Generic Implementation Procedure + (10:56:36, 20 December 2024)
- 05000370/LER-1993-001-02, :on 930222,discovered That SG C Feedwater Flow Low & Decreasing Even Though Controller Output Increasing, Resulting in Manual Reactor Trip.Caused by Equipment Failure.All Pneumatic Relays Replaced + (10:56:39, 20 December 2024)
- ML20035A768 + (10:56:45, 20 December 2024)
- ML20035A766 + (10:56:47, 20 December 2024)
- ML20035A765 + (10:56:48, 20 December 2024)
- ML20035A764 + (10:56:49, 20 December 2024)
- B14403, Application for Amend to License DPR-21,revising TS LCO 3.6B,SR 4.6.B,Figures 3.6.1,3.6.2 & 3.6.3 Along W/Bases for Section 3.6 W/Respect to pressure-temp Limit Curves.Rev 1 to GE-NE-523-165-1292 Encl + (10:56:50, 20 December 2024)
- ML20035A759 + (10:56:52, 20 December 2024)
- LIC-93-0098, 1992 OPPD Annual Rept + (10:56:55, 20 December 2024)
- ML20035A757 + (10:56:57, 20 December 2024)
- ML20035A756 + (10:56:58, 20 December 2024)
- BSEP-93-0041, Part 21 Rept Re Mfg Defects Associated W/Westinghouse Type Hmcp & Type Hfd Breakers,Resulting in Possibility That Breaker Contacts May Not Open During Trip.Initially Reported on 930225.Functional Testing Procedures Revised + (10:56:59, 20 December 2024)
- B14360, Application for Amend to License DPR-61,revising TS 3.8.3.2.b to Allow Use of Tie Breakers 6T11 & 11T6 to Facilitate Energizing Bus 11 & Bases Section 3/4.4.4 to Address Failure of Pressurizer Pressure Channel + (10:57:01, 20 December 2024)
- ML20035A752 + (10:57:04, 20 December 2024)
- ML20035A751 + (10:57:06, 20 December 2024)
- ML20035A749 + (10:57:07, 20 December 2024)
- JPN-93-021, Forwards Inservice Insp Summary Rept,1992 Refuel Outage (Reload 10/Cycle 11), Consisting of Results of Jet Pump Beam Insps Performed Per NRC Bulletin 80-07 & Access Hole Cover Insps Performed Per GE SIL 462 + (10:57:08, 20 December 2024)
- ML20035A746 + (10:57:10, 20 December 2024)
- ML20035A745 + (10:57:11, 20 December 2024)
- ML20035A744 + (10:57:15, 20 December 2024)
- ML20035A741 + (10:57:20, 20 December 2024)
- LIC-93-0097, Forwards Decommissioning Cost Study for Fort Calhoun Station Unit 1, Rev 1 + (10:57:24, 20 December 2024)
- ML20035A736 + (10:57:32, 20 December 2024)
- ML20035A735 + (10:57:34, 20 December 2024)
- ML20035A734 + (10:57:35, 20 December 2024)
- 0CAN039308, Submits Request for Extension to Complete Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance, Recommendations + (10:57:36, 20 December 2024)
- ML20035A732 + (10:57:38, 20 December 2024)
- ML20035A731 + (10:57:39, 20 December 2024)
- 1CAN039303, Application for Amend to License DPR-51,updating RCS Leakage Test Pressure in TS 4.3.2 to Agree W/Requirements of ASME Boiler & Pressure Vessel Code,Section XI (Through Winter 1981 Addenda) + (10:57:40, 20 December 2024)
- ML20035A726 + (10:57:43, 20 December 2024)
- JPN-93-020, Describes Completion of Four Remaining Tasks Associated W/ GL 88-14, Instrument Air Supply Problems Affecting Safety- Related Equipment. Two air-operated Valves Replaced W/Spool Pieces & Test Results Assessed + (10:57:44, 20 December 2024)
- ML20035A724 + (10:57:47, 20 December 2024)
- U-602114, Lists Present Levels of Property Insurance & Sources of Insurance for Facility + (10:57:48, 20 December 2024)
- B14411, Advises That Written Reactor Operator & Senior Reactor Operator Licensing Exams & Operating Tests Scheduled for Wks of 930419 for Millstone Unit 3 & 930426 for Haddam Neck Plant.Exams Will Be Conducted Per NUREG-1021,Rev 7 + (10:57:50, 20 December 2024)
- 05000414/LER-1993-001-01, :on 930221,essential Auxiliary Power Sys Blackout Occurred When DG 2B Removed from Svc.Caused by Missed Procedure.On 930222,problems W/Train a CR Area Ventilation Sys Occurred.Procedures Revised + (10:57:53, 20 December 2024)
- ML20035A719 + (10:57:54, 20 December 2024)
- ML20035A718 + (10:57:56, 20 December 2024)
- ML20035A716 + (10:57:57, 20 December 2024)
- ML20035A715 + (10:58:02, 20 December 2024)
- ML20035A714 + (10:58:03, 20 December 2024)
- ML20035A713 + (10:58:04, 20 December 2024)
- JPN-93-016, Forwards Response to NRC Second Request for Addl Info Re Power Uprate Submittal Concerning Effects of Increased Process & Ambient Temp & Pressures on Instrument Accuracy. Calculations Supporting Response Encl + (10:58:06, 20 December 2024)
- ML20035A706 + (10:58:11, 20 December 2024)
- ML20035A704 + (10:58:13, 20 December 2024)
- ML20035A703 + (10:58:14, 20 December 2024)
- ML20035A702 + (10:58:15, 20 December 2024)
- ML20035A699 + (10:58:17, 20 December 2024)
- 05000373/LER-1993-005-02, :on 930222,two High Radiation Doors Were Found Unsecured.Caused by Blown Fuse on C Phase Output of Static Switch.Alarm on Doors Investigated & Secured + (10:58:19, 20 December 2024)
- ML20035A695 + (10:58:20, 20 December 2024)