TS Change 93-04 to Licenses DPR-77 & DPR-79,providing Footnote to Action Statement 3.6.3.b & to Table 3.6-2 for Containment Vacuum Relief Penetrations
ML20035A759
Person / Time
Site: Sequoyah  
Issue date: 03/19/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20035A760 List:
References
NUDOCS 9303290264
Download: ML20035A759 (2)


Text

.

.,n J,'

l I

i

..----.,__..--,_<.-m A

Tennessee Valky Authontf. Post Offee D:s 2000. Soddy-Dasy. Tenneci.ee 37379 P300 l

Robert A. Fenech I

Vce President. Seoucyah Nucicai Plant q

March 19, 1993 TVA-SQN-TS-93-04 10 CFR 50.90 l

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

't Washingtt.n, D.C. 20555 j

t Gentlemen:

{

i In.the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328-SEQUt)YAH NUCLEAR PLANT (SQN) - TECHhICAL SPECIFICATION (TS) CHANGE.93-04, ACTION STATEMENT CLARIFICATION FOR CONTAINMENT VACUUM RELIEF PENETRATIONS

Reference:

SQN Licensee Event Report 50-327/92015 dated August 27,'1992 i

In accordance with 10 CFR 50.90, we are enclosing.a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change provides a footnote to Action Statement 3.6.3.b and t

to Table 3.6-2 for considering SQN's acuum relief valves as deactivated.

t automatic valves. The' proposed amendment completes a TVA commitment contained in the referenced licensee event report (LER).

j

.g

. The proposed TS change is identified in Enclosure 1.

The justification for the proposed TS change is provided in Ei. closure 2.-

A proposed' 1

determination of no significant hazards consideration performed pursuant to.10 CFR 50.92 is provided in'Eaclosure 3.

The immediate corrective action in the referenced LER involved a temporary compensatory measure that remains in effect for both units.

j NRC staff review and approval are requested'as soon as possible to.

obviate the need for these cc.apensatory measures. TVA requests a 45-day implementation period for this TS change following issuance.

l 3

t 9303290264 930319~

ADOCK O g7 -

g 11 m

F

)

i l

U.S., Nuclear Regulatory Commission Page 2 March 19, 1993 l.

Please direct questions concerning this issue to D. V.'Goodin at i

(615) 843-7734.

Sincerely, l

M Robert' A. Fenech i

Sworn to and subscribed before me i

this /fr4 day of WM 1993 le' Notary Public i

My Commission Expires 8-f 7 l

Enclosures cc (Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Comm.iesion I

One White Flint, North 11555 Rockville Pike

[

Rockville, Maryland 20852-2739

.(

Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor i

L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 j

NRC Resident Inspector Sequoyah Nuclear Plant t

f 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624

[

Mr. B. A. Wilson, Project Chief f

U.S. Nuclear Regulc'ory Commission Region II i

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-0199-e

'I i

.