Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000277/LER-1993-004, :on 930302,automatic Scram on Reactor Water Level When Condensate Pump Trip Caused Two Reactor Feed Pumps to Trip on Low Suction Pressure.Control Panel Will Be Evaluated + (10:46:41, 20 December 2024)
- ML20035B314 + (10:46:43, 20 December 2024)
- HL-3162, Forwards Revised Proposed Changes to TS Re Gaseous Effluent Release Rate Limits,Per Telcons W/Nrc in Connection W/Nrc Review of 921014 & 930115 Applications for Amends to TS Associated W/Implementation of New 10CFR20 Requirements + (10:46:44, 20 December 2024)
- ML20035B309 + (10:46:46, 20 December 2024)
- NRC-93-0032, Application for Amend to License NPF-43,changing TS to Limit Periodic Full Cycle Testing of Suppression chamber-drywell Vacuum Breakers to Cold Shutdown Conditions & to Require All 12 Installed Vacuum Breakers to Be Operable + (10:46:47, 20 December 2024)
- ML20035B299 + (10:46:55, 20 December 2024)
- IR 05000029/1993003 + (10:46:57, 20 December 2024)
- ML20035B295 + (10:46:59, 20 December 2024)
- ML20035B292 + (10:47:00, 20 December 2024)
- ML20035B288 + (10:47:01, 20 December 2024)
- ML20035B286 + (10:47:03, 20 December 2024)
- ML20035B285 + (10:47:04, 20 December 2024)
- ML20035B283 + (10:47:05, 20 December 2024)
- ML20035B282 + (10:47:06, 20 December 2024)
- ML20035B281 + (10:47:08, 20 December 2024)
- ML20035B278 + (10:47:09, 20 December 2024)
- ML20035B277 + (10:47:10, 20 December 2024)
- ML20035B276 + (10:47:11, 20 December 2024)
- ML20035B273 + (10:47:12, 20 December 2024)
- ML20035B272 + (10:47:15, 20 December 2024)
- ML20035B271 + (10:47:16, 20 December 2024)
- ML20035B270 + (10:47:17, 20 December 2024)
- ML20035B268 + (10:47:18, 20 December 2024)
- ML20035B266 + (10:47:19, 20 December 2024)
- ML20035B265 + (10:47:20, 20 December 2024)
- ML20035B264 + (10:47:21, 20 December 2024)
- ML20035B263 + (10:47:22, 20 December 2024)
- ML20035B262 + (10:47:24, 20 December 2024)
- ML20035B261 + (10:47:25, 20 December 2024)
- ML20035B259 + (10:47:26, 20 December 2024)
- ML20035B256 + (10:47:27, 20 December 2024)
- ML20035B254 + (10:47:28, 20 December 2024)
- ML20035B250 + (10:47:30, 20 December 2024)
- ML20035B247 + (10:47:31, 20 December 2024)
- 05000445/LER-1993-003, :on 930226,spurious SIS Actuation from Train a Solid State Safeguards Sequencer Occurred.Caused by Failure of Instrument Used During Troubleshooting.Monitoring Device Removed & Sys Card Chassis Replaced + (10:47:32, 20 December 2024)
- ML20035B233 + (10:47:34, 20 December 2024)
- ML20035B230 + (10:47:38, 20 December 2024)
- NG-93-1016, Monthly Operating Rept for Feb 1993 for Duane Arnold Energy Center + (10:47:39, 20 December 2024)
- ML20035B217 + (10:47:42, 20 December 2024)
- ML20035B214 + (10:47:45, 20 December 2024)
- ML20035B210 + (10:47:46, 20 December 2024)
- ML20035B207 + (10:47:48, 20 December 2024)
- ML20035B204 + (10:47:49, 20 December 2024)
- ML20035B201 + (10:47:51, 20 December 2024)
- B14425, Requests Enforcement Discretion Associated W/Compliance W/Millstone Unit 2 TS 3.4.10, RCS-Structural Integrity, to Afford Util Sufficient Time to Effect Temporary Repair to Provide Addl Structural Integrity to Supply Piping + (10:47:52, 20 December 2024)
- ML20035B196 + (10:47:54, 20 December 2024)
- ML20035B193 + (10:47:55, 20 December 2024)
- ST-HL-AE-4387, Requests Temporary Waiver of Compliance from Provisions of TS 3/4.1.3.3, Position Indication Sys Shutdown. Requests Specifically States That Reactor Trip Breakers Will Be Allowed to Close Prior to Declaring DRP Sys Operable + (10:47:56, 20 December 2024)
- ML20035B186 + (10:47:58, 20 December 2024)
- ML20035B185 + (10:47:59, 20 December 2024)
- ML20035B184 + (10:48:00, 20 December 2024)