Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035C217 + (10:25:45, 20 December 2024)
- TAC:M84279 + (10:25:47, 20 December 2024)
- ML20035C216 + (10:25:47, 20 December 2024)
- ML20035C214 + (10:25:48, 20 December 2024)
- ML20035C212 + (10:25:49, 20 December 2024)
- ML20035C210 + (10:25:51, 20 December 2024)
- ML20035C209 + (10:25:52, 20 December 2024)
- ML20035C206 + (10:25:54, 20 December 2024)
- B14410, Submits Results of Evaluation of EDG & Associated Fuel Oil Sys to Resolve Discrepancies Between Actual Capabilities & Previously Stated Capabilities of DG Fuel Oil Supply Sys. Excerpts from SER (NUREG-1031) Listed + (10:25:55, 20 December 2024)
- ML20035C204 + (10:25:58, 20 December 2024)
- ML20035C203 + (10:25:59, 20 December 2024)
- ML20035C202 + (10:26:01, 20 December 2024)
- ML20035C200 + (10:26:03, 20 December 2024)
- IR 05000443/1993004 + (10:26:05, 20 December 2024)
- ML20035C198 + (10:26:07, 20 December 2024)
- JAFP-93-0182, Forwards Ja FitzPatrick Cycle 11 Startup Testing Rept + (10:26:11, 20 December 2024)
- ML20035C195 + (10:26:13, 20 December 2024)
- ML20035C193 + (10:26:14, 20 December 2024)
- ET-NRC-93-3852, Forwards AP600 Ssar,Initially Transmitted to NRC Via Vendor .Encl Withheld (Ref 10CFR2.790) + (10:26:15, 20 December 2024)
- RBG-38-300, Forwards Listing of Current Levels of Property Insurance Against Financial Losses Due to Nuclear Accidents,As of 930309 + (10:26:17, 20 December 2024)
- ST-HL-AE-4392, Responds to Violations Noted in Insp Repts 50-498/92-36 & 50-499/92-36.Corrective Actions:Corrective Maint Completed on power-range Neutron Flux Instrument NI-44 & Reload Initial Startup Testing Procedure Will Be Revised + (10:26:20, 20 December 2024)
- ML20035C180 + (10:26:22, 20 December 2024)
- ML20035C179 + (10:26:23, 20 December 2024)
- ML20035C177 + (10:26:24, 20 December 2024)
- ML20035C174 + (10:26:25, 20 December 2024)
- ML20035C172 + (10:26:26, 20 December 2024)
- ML20035C170 + (10:26:27, 20 December 2024)
- ML20035C169 + (10:26:28, 20 December 2024)
- 05000254/LER-1993-002-09, :on 930302,determined That Differential Pressure of 0.10 Inches Water Vacuum Could Be Obtained Instead of TS Required Pressure of 0.25 Inches Water Vacuum. Caused by Testing Defect.Procedure Changed + (10:26:30, 20 December 2024)
- ML20035C167 + (10:26:31, 20 December 2024)
- 05000413/LER-1993-005, :on 930301,NRC Resident Inspector Discovered Ssps Wiring Errors Due to Mfg Fabrication Deficiency.Work Request 93017239-01 Initiated & Mfg Distributed Info Notice Addressing Wiring Problems + (10:26:33, 20 December 2024)
- ML20035C165 + (10:26:35, 20 December 2024)
- ML20035C164 + (10:26:40, 20 December 2024)
- ML20035C161 + (10:26:41, 20 December 2024)
- ML20035C160 + (10:26:46, 20 December 2024)
- ML20035C159 + (10:26:47, 20 December 2024)
- ML20035C156 + (10:26:53, 20 December 2024)
- ML20035C155 + (10:26:59, 20 December 2024)
- 05000313/LER-1993-001-01, :on 930305,experienced Reactor Trip Initiated by ARTS as Result of Main Turbine Trip.Caused by Occurrence of Two Grounds on 125 Vdc Bus D-1.Wiring Application at Main Circuits Will Be Evaluated for Damage + (10:27:05, 20 December 2024)
- ML20035C153 + (10:27:12, 20 December 2024)
- ML20035C151 + (10:27:19, 20 December 2024)
- 05000412/LER-1993-004-01, :on 930302,130-volt Ground on Dc Bus 2-1 Experienced,Resulting in SG Blowdown Isolation.Caused by Personnel Error.Esf Actuation Warning Placards Placed on Breaker 8-1 & Supervisors Counseled + (10:27:26, 20 December 2024)
- ML20035C148 + (10:27:32, 20 December 2024)
- ML20035C145 + (10:27:38, 20 December 2024)
- ML20035C144 + (10:27:44, 20 December 2024)
- 05000254/LER-1992-023, :on 920920 & 1211,determined That Heat Transfer Capability of RHR HX 1B Did Not Meet Design Requirements. Caused by Fouling & Silt Accumulation on RHR Svc Water Side of Hx.Heat Flushing Procedure Initiated + (10:27:51, 20 December 2024)
- ML20035C139 + (10:27:57, 20 December 2024)
- ML20035C138 + (10:28:04, 20 December 2024)
- ML20035C135 + (10:28:10, 20 December 2024)
- PNO-III-93-019, on 930326,ROs Manually Scrammed Reactor Because of Break in 30-inch Fiber Glass,Underground Svc Water Line Outside Plant,Which Caused Flooding.Broken Line Was Isolated by Shutting Off Svc Water Pumps + (10:28:17, 20 December 2024)
- ML20035C131 + (10:28:23, 20 December 2024)