GL 92-06I i!
L 0
c j
~
PHILADELPHIA ELECTRIC ' COMPANY j
q NUCLEAR GROUP HEADQUARTERS
]
955-65 CHESTERBROOK BLVD.
March 31, 19'93 f
WAYNE PA 19087-5691 l
Docket Nos. 50-352 (215) 640-6000 50-353-lj License Nos.- NPF-39'
-NPF-85 ~
l U.S. Nuclear Regulatory Commission l
Attn: Document Control Desk
-Washington, DC.20555
.j
SUBJECT:
Limerick Generating Station, Units 1 and 2 l
Revised Response to Generic Letter'92-06 l
" Operator Licensing National Examination Schedule" 1
i Gentlemen:
!~
NRC Generic Letter (GL)
No.
92-06,
" Operator National j
Examination Schedule,"
dated -September 16,
-1992,
' requested j
licensees to voluntarily submit updated schedules for licensed; operator examinations.
Philadelphia Electric Company's. (PECo's)
(.-
response to GL No. 92-06, dated October 28, 1992," ' included' the l
l proposed schedule for licensed. operator examinations'at Limerick Generating Station (LGS), Units 1 and 2.
^
j Attached is a revised -response to GL No. 92-06 'for LGS, Units'
{
1 and 2,.
i~.e.,
a revised NRC Form' 536',
" Operator. Licensing Examination Data." Specifically, this revised response changes the'
~
l scheduled-requalification examination dates (i.e.,
Part B,
-i j
" Proposed Requalification Examination Schedule," of NRC Form 536) l' for LGS reactor operators and senior reactor operators such that LGS requalification examinations for these - operators.will be conducted in the ' October / November.timeframe for the. NRC Fiscal:
Years (FYs) 19S4 chrough 1996.
As indicated in ths-' Attachment, i
this schedule change does not affect the requalification l
examination dates for the senior reactor operators limited to fuel i
- handling, j
i This change of scheduled requalification examinations from a l
January / February to an October / November'timeframe'is required to eliminate licensed operator schedule and resource conflicts with LGS refueling. outages which are also currently scheduled-for the l
l January / February timeframe.
With both IES Unit 1 and-Unit 2-on a.
i 24 month refueling cycle, ; this ; scheduls change provides -for; j
separation of these activities in the future.
An evaluation;of1 i
this schedule change against the ~ requirements of ~ 10CRF55 is' l
provided below.
i i
i 9304060263 930331
-. l DDR ADOCK 05000352 g
(.
i'
l
' U.S. Nuclear Regulatory Commission March 31, 1993 Document Control Desk Page 2 i
10CFR55.59 requires that each licensee successfully complete a requalification program conducted for a continuous period not to exceed 24 months in duration; and to pass a comprehensive written requalification examination and an annual operating examination.
The rescheduled requalification examinations (i.e.,
both written and operating) at
- LGS, Units 1
and 2,
comply with these requirements.
Both biennial written and annual operating examinations were conducted at LGS in January 1992.
As indicated in the Attachment, both biennial written and annual operating examinations are scheduled to be conducted again in October / November 1993 (i.e., the biennial written requalification
{
examination is scheduled to be conducted prior to January 1994, and the annual operating examination is scheduled to be conducted in the calendar year of 1993).
f The annual operating examination had previously been rescheduled from January / February 1993 to April /May 1993 to avoid a schedular conflict with the recently completed LGS Unit 2 second refueling outage.
This schedule change was indicated in our i
revised response to GL No.
91-12,
" Operator Licensing National r
Examination Schedule," dated August 7, 1992, and in our original l
response to GL No. 92-06 dated October 28, 1992.
10CFR55.57 requires that each licensee pass an NRC administered comprehensive written requalification examination and annual operating examination during the six (6) year term of the operator license as a prerequisite for license renewal.
As indicated in GL No. 92-06, each year the NRC updates the National Examination Schedule (NES) and requests that licensees provide updated projections of the number of candidates to be tested each year to plan its resources for conducting NRC administered examinations.
No NRC administered written requalification examinations or annual operating examinations are required to be conducted at LGS in NRC FYs 1993 through 1995 for any licensed reactor operator or senior reactor operator to comply with the requirements of 10CFR55.57.
Therefore, conducting requalification examinations at LGS as rescheduled in the October / November timeframe does not adversely impact NRC Region I resources, j
This change in licensed reactor operator and senior reactor operator requalification examination dates from the NES specified in Enclosure 2 to GL No. 92-06 for LGS (i.e.,
from January to October) has been discussed with Mr. R. J.
Conte, Chief - Boiling Water Reactor Section,
- USNRC, Region I,
and has been found l
acceptable.
This notification of a change to the NES is being l
provided as indicated in our revised response to GL No. 91-12 dated August 7, 1992.
i
'I P
~
~
U.S.
Nuclear Regulatory Commission March 31, 1993 Document Control Desk Page 3 As indicated in the Attachment, specifically, Part A,
" Proposed Operator Licensing Examination Schedule," of NRC Form 536, initial reactor operator and senior reactor operator licensing examinations continue to be scheduled for the July timeframe as specified in the NES.
If you have any questions, please do not hesitate to contact us.
Very truly yours, ft
+
G.
A.
Hunger, Director Licensing Section Station Support Department Attachment cc:
T.
T.
Martin, Administrator, Region I, USNRC T.
J.
Kenny, USNRC Senior Resident Inspector, LGS i
i t
?
l i
i L
4.
I 4
i i
Attachment Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 50-353 Revised Response to Generic Letter'No. 92-06 e
" Operator Licensing National Examination' Schedule"-
r NRC Form 536, " Operator Examination Licensing Data"
.I
+
9 t
t
'I
7 i
APPnOvEn av Ous: No.3is esas NRC FORM S36 U.S. NUCLEAR REGULATORY COMMISSION EXPRES:8/31/95 g
p.gz,
EST3aTED Buf0EN PER RESPONSE TO COMPLY WrDt THE INFCft.4ATO4 COL 1ECTON REQUEST: 2 tCURL FORWA!C OPERATOR LICENSING COuuE,n: REGA,a.o suRaEN EsTmTE To we woRuco,
- "'"*"E""
"* "i"" " "* "
EXAMINATION DATA neoutATOm --~."we."oTON. OC mssemi. '"o Tc u
THE PAPERWDFe( REDUCTON PFOJECT 91504131), OFFCE OF i
MANAGEMENT AND IEJDGET.WASHN3 TON,OC 20531 NRC REGION FOCIUTV i
Limerick Generating Station Units 1 and 2 Docket Nos. 50-352/50-353 I
[
Sheet #1
[
l A. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FY 19 93 FY 19 94 FY 19 95 FY 195 (tc/01/1- 09/30/ 91 )
(1C/01/33,_. OS/30/j (10/01/J-09/30/,9_5,)
' 00/01/$.DB/w/M 1.
ASSGNED DATE rER GEup=C LEntR otec3 January January
- 7/10/95 January l
wousER Or
' l; REACTOR OPERMMS 0
0 0
0 l
NuuBER OF SDCOR REACTCA OPEuTORs-emaNT 0
0 0
0 Nuusm OF SENOR REACTOR OPERMORS - UPGPADE O
O O
O ususER Or SENOR av OPERMMS - UuCID Q
Q g
,Q z.
AssouEc ocE 7/17/QS 7/15/06-PER GENUuC LETTER Gt49C 7/]g/Q3 7/1N/g4 wuusER OF REA0fDR OPEMTORS g
6 6
6.
wvueER OF EENoR REACTOR 7
OPERMORS - P(STANT g
g g
e NuuBER OF SENOR REAC*OR 3
OPERcORS - UPGRADE 3
3 3
NUuBER OF SENOR REACTOR OPERcORs. uuntD o
0 0
0 B. PROPOSED REQUALIFICATION EXAMINATION SCHEDULE t
FY 19 93 FY 19 94 FY191 FY 19,gf__
(1D/01/ 4 } 08/30/ 9 3.)
DC/01/ 33-08/30/24 )
0 8/01/.9 /1 - 09/30/. 3 3.)
00/01/ 23.-ce/30/._Ef2)
(
$. c"E N ')
10/11/93 10'/10/9 10/9/95 10/1g/93 10/17/94 10/16/95 2o#E N *
^'E *
- 10/25/93 10/24/94 10/23/95
- c"E *
- 11/1/93 10/31/94 10/30/95 t
- OcE *
- 11/8/93 11/7/94 11/6/95 t enE rwEng 11/15/93 11/14/94 11/13/95 C. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FY 93 OCTOBER 19 93_
FEBRUARY 19 M 19 EST! MATED NUMBER OF CANDIDATES I
~ ~ '..
1
e
+
APPROVED BY OMO: NO 3tteet38 NRC FORM 53g U.S. NUCLEAR REGULATORY COMMISS10H EXPIRES: 8/31[85 pq ESTIMATED DUFCEN PER RESPONSE TO COMPLY wmt THE NFORMATON CXXLECTON REQUEST: 2 PCURik FORWAFC OPERATOR LICENSING CouME,c8 ResuCm suRoEN ESwrE TO THE wCRuiTa
^"'"'"**"'"'S5"5'"""*",""*"*""
EXAMINATION DATA REGULATORf COMM;SSON WASMPGTON DC 235S000t. ANDTC THE PAPERWORK REDUCmON PfCJECT Pt!00131), OFR:E OF urAAGEMENT AND BUDGET WASHWGTON.DC 205C3.-
NRC REGION FActLITY Limerick Generating Station Units 1 and 2 I
Docke't Nos. 50-352/50-353 Sheet #?
i A. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FY 19 FY 19 FY 19 FY 19 j
03/01/_ 09/3C/J (10/01/ _ 09/30/
1 pC/01/_ 09/30/J 00/01/_-09/30/J f
r 1.
ASSGNED DATE l
PER GENERC LETTER GL &lH;O MJMBER OF REACIOR OPEMTORS MJMBER OF SENOR REA%.
[
OPEMTORS - NSTANT NUMBER (# SENOR REACTOR OPE:ATORS - UPGRADE MJuBER OF set @OR REAN.
OPEMTORS - UMiED E
ASSGNED DATE l
PER GENERC LETTER GL4&c3 NUMBER OF HEACTOR OPEMTORS l
NUMBER OF SENCR REACTOR
=
CPEMTORS - NSTANT NUMBER OF SENOR REACTOR t
OPERATORS -UPGRADE MJMBER OF SENOR REACTDR j
OPERATORS - Uu!TED i
B. PROPOSED REQUALIFICATION EXAMINATION SCHEDULE l
i r
FY 19 FY 19 9 /2 FY 199 s FY 19 o(,
0 o / 0 1 / _. 9 } 2 9 pe/c1/1/ -ce/3cl.9.5) eo/o119.5.-0a/30/ 96) on/30/_.9.3 0o/01/93._-ce/3of 5L/d 3
(
9 7 DATE [ WEEK 7) 7/19/93 7 / I'7 /4; Note:
Item 7 includes LSRO onerating eram oniv_
i e
C. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FY l
OCTOBER 19 FEBRUARY 19 JUNE 19 ESTIMATED NUMBER OF CANDIDATES
.