ML20035C209

From kanterella
Jump to navigation Jump to search
Responds to Requesting NRC to Reconsider Decision Not to Attend Vermont State Nuclear Advisory Panel Meeting Scheduled for 930309.TE Murley & Tt Martin Tentatively Scheduled to Meet W/Subj Panel on 930520
ML20035C209
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/29/1993
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Sanders B
HOUSE OF REP.
Shared Package
ML19342A591 List:
References
CCS, NUDOCS 9304060334
Download: ML20035C209 (4)


Text

.. g - 2 zl Parch 29, 1993 The Honorable Bernard Sanders United States House of Representatives Washington, DC 20515-4501

Dear Congressman Sanders:

You asked in your letter dated March 4,1993, that we reconsider our decision not to attend the Vermont State Nuc! car Advisory Panel (VSNAP) meeting scheduled for March 9,1993.

Although we did not attend that meeting, we have been working with the State of Vermont to establish a date that senior representatives of the NRC could publicly meet with VSNAP to respond to their questions and concerns. I am happy to report that Dr. Thomas E. Murley, Director. Of6ce of Nuclear Reactor Regulation, and Thomas T. Martin, Regional Administrator, Region I, arelentatively scheduled to meet with VSNAP on May 20,1993.

If you or your staff have any questions regarding this matter, I would be pleased to respond to them.

Sincerely, (yrigi+.'

-]

^

Jp.nx., r -

i

,)r V James M. Taylor Executive Director for Operations i

G:\\8644.MiiK h

RI:RA OCA NRR EDO

(//l l

?

TMartin MCallahan TMurley k

' or 4/22/93 3/22/93 3/25/93

^ /93

/'#

u,

,y OFFICIAL RECORD COPY

'/ s CCs1 N

ff 93cyoGo33y va 4h

i fd 1

l Distribution:

l l

J. Taylor, EDO J. Sniezek, DEDR

11. Thompson, DEDS l

J.131aha, OEDO j

j T. Murley, NRR W. Russell, NRR I

J.1.ieberman, OE E. Beckjord, RES V. McCree, OEDO J. Scinto, OGC 2

D. Williams, OIG M. Weber, OC j

R. Erickson, NRR t

B. liayes, 01 A. Thadani, NRR l

J. Calvo, NRR i

W. Ilutter, NRR D. Dorman, NRR I

li Reis, OGC 12 Congel, NRR l

C. Kammerer, SP i

CRC No. 93-0186 EDO 0008M4 1

DN 50-271 J. Wiggins, RI W. Ihlges, RI R. Cooper, RI K. Smith, RC l

W. lanning, RI J. I.inville, RI

)

i li Kelly, RI D. I.ew, RI li. liichenhoir, SRI - Vermont Yankee i

I a

i i

i i

i

\\

. r ase

/

'o, UNITED STATES 8

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 E

/

EDO Principal Correspondence Control FROM:

DUE: 03/19/93 EDO CONTROL: 0008644 DOC DT: 03/04/93 FINAL REPLY:

REP. BERNARD SANDERS TO:

TIM MARTIN, RI FOR SIGNATURE C":

    • PRI CRC NO: 93-0186 EXECUTIVE DIRECTOR DESC:

ROUTING:

URGES COMM. TO RECONSIDER DECISION fJOT TO HAVE THE TAYLOR NRC BE REPRESENTED AT THE SPECIAL MEETING OF THE SNIEZEK VERMONT STATE fJUCLEAR ADVISORY PANEL ON 3/9/93 RE BLAHA THE SAFETY OF VERMONT YANKEE KNUBEL DATE: 03/05/93 MURLEY, NRR KAMMERER, SP ASSIGNED TO:

CONTACT:

RI MARTIN SPECIAL INSTRUCTIONS OR REMARKS:

I

I OFFICE OF THE SECRETARY

]

CORRESPONDENCE CONTROL TICKET i

l' APER NUMBER:

CRC-93-0186 LOGGING DATE: Mar 4 93

)

i ACTION OFFICE:

EDO i

i AUTHOR:

REP BERNARD SANDERS AFFILIATION:

U.S.

IiOUSE OF REPRESENTATIVES i

j ADDRESSEE:

TilOMAS MARTI!1, REG I l

LETTER DATE:

Mar 4 93 FILE CODE: IDR-5 VERMONT YANKEE

SUBJECT:

URGES THE COMM TO RECONSIDER THE DECISION NOT TO HAVE THE NRC BE REPRESENTED AT THE SPECIAL MEETING j

OF THE VERMONT STATE NUCLEAR ADVISORY PANEL OON MAR 9 RE THE SAFETY OF VERMONT YANKEE

]

ACT10N:

WE " 2 i r man ~ I,lb (/

ttf

[

DISTRIBUTION:

CHAIRMAN, COMRS, DSB, OCA TO ACK, RF SPECIAL HANDLING: NONE 1

4 i

CONSTITUENT:

j NOTES:

l' N

DATE DUE:

M=

s SIGNATURE

DATE SIGNED:

1 AFFILIATION:

in I

1

)

3 d

i j

MD0 ---

0086f t6 4

j l

1-

.