Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035G130 + (09:17:34, 20 December 2024)
- ML20035G129 + (09:17:36, 20 December 2024)
- ML20035G127 + (09:17:37, 20 December 2024)
- ML20035G126 + (09:17:38, 20 December 2024)
- 05000213/LER-1993-002, :on 930323,control Rods 31 & 32 Malfunctioned When Operators Attempted to Insert Control Bank B.Caused by Inadequate Procedural Verification on Maint of Control Rod Contactors.Mechanical Fasteners Tightened + (09:17:40, 20 December 2024)
- ML20035G124 + (09:17:41, 20 December 2024)
- 05000499/LER-1993-001, :on 930123,unit Automatically Tripped from Full Power Due to Turbine Trip Above P-9 Setpoint as Result of Depressurization of electro-hydraulic Control Supply Header. Failed Line & Differential Transformer Replaced + (09:17:43, 20 December 2024)
- ML20035G121 + (09:17:45, 20 December 2024)
- 05000499/LER-1993-001-01, Forwards LER 93-001-01 Re Reactor Trip Due to Failure of Main Turbine electro-hydraulic Control Line.Rev Includes Results of Failure Analyses Performed on Failed Control Line & Linear Variable Differential Transformer + (09:17:46, 20 December 2024)
- ML20035G117 + (09:17:48, 20 December 2024)
- PLA-7838, Reply to Notice of Violation: EA-19-050 (PLA-7838) + (09:17:49, 20 December 2024)
- ML20035G115 + (09:17:50, 20 December 2024)
- B14449, Requests Approval to Use Provisions of Code Case N-416 for Hydrostatic Testing of Repairs or Replacement of Class 2 copper-nickel Piping in CCE*E1A Hx,Per GL 90-05.Piping Will Be Modified During 1993 Refueling Outage + (09:17:51, 20 December 2024)
- B14415, Updates NRC on Significant Progress Made in Area of Shutdown Risk Mgt.Shutdown Risk Mgt Program Implemented as Part of Performance Enhancement Program.Lower Tiered Procedure Generated Per Guidelines of NUMARC 91-06 + (09:17:53, 20 December 2024)
- TAC:M86163 + (09:17:54, 20 December 2024)
- ML20035G111 + (09:17:56, 20 December 2024)
- B14443, Informs That During Recent Shutdown of Facility,Util Performed Sr,In Accordance W/Ts 4.8.4.1,per 930330 Proposed Rev to TS Re one-time Extension to Various 18-month SRs + (09:17:57, 20 December 2024)
- 3F0493-06, Forwards Info Requested in GL 92-08, Thermo-Lag 330-1 Fire Barriers, Including Confirmation of Use of Thermo-Lag Matl at Facility.Compensatory Measures,Consistent W/Ts, Established Per Recommendations in NRC Bulletin 92-001 + (09:17:58, 20 December 2024)
- ML20035G108 + (09:18:01, 20 December 2024)
- 05000456/LER-1993-004-05, :on 930328,quadrant Power Tilt Ratio Calculated Using Three Operable power-range Channels Instead of Four Channels Required by Ts.Caused by Personnel Error. Personnel Counseled Re Performance + (09:18:02, 20 December 2024)
- ML20035G105 + (09:18:04, 20 December 2024)
- ML20035G103 + (09:18:05, 20 December 2024)
- ML20035G102 + (09:18:09, 20 December 2024)
- ML20035G100 + (09:18:11, 20 December 2024)
- ML20035G098 + (09:18:12, 20 December 2024)
- ML20035G097 + (09:18:13, 20 December 2024)
- ML20035G096 + (09:18:14, 20 December 2024)
- ML20035G094 + (09:18:15, 20 December 2024)
- ML20035G093 + (09:18:18, 20 December 2024)
- ML20035G092 + (09:18:19, 20 December 2024)
- RC-93-0100, Forwards Rev 0 to VC Summer Nuclear Station,Colr Cycle 8 + (09:18:20, 20 December 2024)
- ML20035G089 + (09:18:22, 20 December 2024)
- 05000482/LER-1993-005, :on 930322,maint Electrician Skipped Step in Suppl Work Instruction to Replace/Refurbish Actuator for Centrifugal Charging Pumps.Caused by Personnel Error. Electrican Counseled & Will Be Disciplined + (09:18:24, 20 December 2024)
- ML20035G087 + (09:18:26, 20 December 2024)
- ML20035G086 + (09:18:27, 20 December 2024)
- 05000327/LER-1993-006, :on 930318,determined That Two Containment Isolation Valves in Fire Protection Sys Not Verified to Isolate Upon Receipt of Phase a Containment Signal.Caused by Use of Inadequate Procedure.Si Corrected + (09:18:28, 20 December 2024)
- ML20035G084 + (09:18:30, 20 December 2024)
- ML20035G082 + (09:18:31, 20 December 2024)
- RBG-38-369, Forwards Request for Relief RR0017,Rev 5 to ISI Program Plan for Approval in Support of Fifth Refueling Outage Scheduled to Begin 940315.Notifies That Util Invoking Code Case B-498 from RG 1,147,Rev 9 for Use at Plant + (09:18:33, 20 December 2024)
- ML20035G079 + (09:18:33, 20 December 2024)
- ML20035G075 + (09:18:35, 20 December 2024)
- JPN-93-030, Proposed Tech Spec Changes Re Fire Barrier Penetration Seals Surveillance Schedule Interval + (09:18:37, 20 December 2024)
- ML20035G071 + (09:18:43, 20 December 2024)
- ML20035G069 + (09:18:44, 20 December 2024)
- ML20035G068 + (09:18:45, 20 December 2024)
- ML20035G067 + (09:18:46, 20 December 2024)
- ML20035G066 + (09:18:47, 20 December 2024)
- ML20035G065 + (09:18:48, 20 December 2024)
- ML20035G064 + (09:18:49, 20 December 2024)
- TAC:M82381 + (09:18:50, 20 December 2024)
- ML20035G063 + (09:18:51, 20 December 2024)