Application for Amend to License DPR-59,changing Surveillance Interval from Once Every 1.5 Yrs to Once Every Refueling Cycle
ML20035G066
Person / Time
Site: FitzPatrick 
Issue date: 04/16/1993
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20035G062 List:
References
NUDOCS 9304260101
Download: ML20035G066 (1)


Text

i i

l BEFORE THE UNITED STATES r

NUCLEAR REGULATORY COMMISSION in the matter of

)

NEW YORK POWER AUTHORITY

)

Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant

)

APPLICATION FOR AMENDMENT TO OPERATING LICENSE The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating License DPR-59 for the James A. FitzPatrick j

Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulation.

This application for an amendment to the James A. FitzPatrick Technical Specifications changes the surveillance interval from once every 1.5 years to once every refueling cycle.

The practical effect of the amendment would be to reset the start date of the current fire barrier penetration surveillance interval in Technical Specification 4.12.F.1 from September 27, 1991 to January 3,1993. Between September 27,1991 and January 3,1993 (during the 1992 refueling outage) a baseline inspection of mechanical and electrical fire barrier penetration seals was completed. Although fire doors and fire dampers were not part of the baseline inspection program, they were inspected and repaired under a similar program.

Based on the confidence gained through these inspections, the Authority proposes to i

re-establish the surveillance interval for fire barrier penetrations to once per operating cycle beginning with start-up after the 1992 refueling outage. For the purpose of this proposed surveillance interval, the operating cycle began when the reactor went critical on 1

January 3,1993.

The signed original of the Application for Amendment to Operating License is enclosed for I

filing. The proposed change to the Technical Specifications is Attachment I to this Application i

for Amendment to the Operating License. The Safety Evaluation for the proposed change is included as Attachment 11. A markup of the effected Technical Specification pages is included as Attachment Ill.

New York Power Authority b

Ra!

E. Beedle h

Exe tive Vice President Nuclear Generation STATE OF NEW YORK COUNTY OF WESTCHESTER Subscribed and swom to before me this 16"' day of April 1993.

/

.h GEMLDME STMND Notary Public /

nomy Y g 2 4260101 930416 Empres 2

ADOCK 05000333 l