I i
i i
GENuclear Energy l
i cemsoc< cmm l
. ;5 Csw Avenue. &n.ase. LA n25 l
l April 16,1993 Docket No. STN 52-001 l
I Chet Poslusny, Senior Project Manager I
Standardization Project Directorate Associate Directorate for Advanced Reactors i
and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Review Schedule - DFSER Open Item 2.6-1
Dear Chet:
Enclosed in a SSAR markup addressing DFSER Open Item 2.601. This markup includes consideration of the issues identified in Section 1.4 of the EPRI Evolutionary Plant SEF. In revising the enclosed Table 2.0-1, GE made the changes requested by the DFSER except for the following:
1.
It has been agreed with NRC management that the SSAR will utilize only Japanese metric units.
2.
The suggested note (10) does not belong in Table 2.0-1 as a site design parameter. Note (10) information is already included in Section 3.7.
Sincerely, 74 l-Jack Fox l
Advanced Reactor Programs cc: Norman Fletcher (DOE)
.t Roy Louison (GE) gY M93-94 9304260135 930416 PDR ADOCK 05200001 i-A.
6NR naumro ndard Plant REV B l
TABLE 2.0-1 ENVELOPE OF ABWR STANDARD PIANT SITE DESIGN PARAMETERS eed:
Basic Wing /209 km/hr Maximum Ground Water level:
Extreme Wind:
I) 177 km/hr 61.0 cm below grade Maximum Flood (or Tsunami) Level:
Tornado:
l 30.5 cm below grade
- Maximum tornado wind speed:
483 km/hr
- Maximum Rotational Speed:
386 km/hr Precipitation (for Roor Design):
- Translational velocity:
97 km/hr
- Maximum rainfall rate:
493 cm/hr(8)
- Radius:
45.7 m 2
2
- Maximum snow load:
0.024 kg/cm
- Maximum pressure drop:
0.141 kg/cm 4
- Rate of pressure drop:
0.0846 kg/cm'/sec
- Missile Spectra:
Per SRP 3.5.1.4 Spectrum I Design Temperatures:
Soil Properties:
2 i
Ambient
- Minimum Static Bearing Capacity:
732 kg/cg9) 1% Exceedance Values
- Minimum Shear Wave Velocity:
305 m/sec
- Maximum: 37.8"C dry bulb /25 C wet bulb
- Liquefaction Potential:
None at plant site i
(coincident),26.6"C wet bulb (non-coincident) resug#g from
- Minimum:-233 C SSE 0% Exceedance Values (Historicallimit)
Seismology:
- Maximum 46.1"C dry bulb /26.7"C wet bulb l
(coincident),27.2"C wet bulb (non-coincident) k
- Minimum:-40 C
- SSE Peak Ground Acceleration: 030g )
- SSE Response Spectra: per Reg. Guide 1.60 l
- SSE Time History: Envelope SSE Response Spectra (1) 50-year recurr e interval; value to be utilized for design of non-safety-related structures only.
(2) 100-year recurrence inte I; value to be utilized for design for safety-rciated structures only.
(3) Probable maximum flood level (P F), as defined in ANSI /ANS-2.8, ' Determining Design Basis Flooding at Power Reactor Sites."
' M a p -ci s i n S de. v'.re J g (4) 10,000,000-year tomado recurrence interval.
p g
g,
,, 9 y.,
- o. - d A c u. f t (5) Free-field, at plant grade elevation.
_r,,,e s,,,,
,w n c (6) Deleted
~
' * " * ^
- ^ *
(7) See item 3 in Section 3A.]for additionalinformation.
(8) hiaximum value for i hour over 2.6 km probable maximum precipitation (PhfP) with ratio of 5 minutes to I hour PhfP of 0.32 as found in National Weather Source Publication HAfR No. 52.
1 hiaximum short term rate: 15.7 cm/5 min.
(9) This is the minimum shear wave velocity at low strains after the soit property uncertainties have been applied.
Amendment 26 2.02 1
i
~
... _ _, _ _ _ _ _ _ _ _ _;