Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035H040 + (08:54:55, 20 December 2024)
- ML20035H039 + (08:54:57, 20 December 2024)
- ML20035H038 + (08:54:59, 20 December 2024)
- BSEP-93-0030, Initial Part 21 Rept Re Possible Mfg Defects Associated W/ Westinghouse Type HMCP150 & Type Hfd Breakers Resulting in Possibility That Breaker Contacts May Not Open During Trip Conditions.Evaluation of Corrective Action Underway + (08:55:00, 20 December 2024)
- ML20035H036 + (08:55:02, 20 December 2024)
- ML20035H034 + (08:55:03, 20 December 2024)
- 05000327/LER-1993-008, :on 930326,determined That Flow Switches Controlling Operation of Emergency Gas Treatment Sys Decay Cooling Valves Not Calibr Since Apr 1993.Caused by Personnel Error.Instruction Revised + (08:55:05, 20 December 2024)
- 05000336/LER-1993-006, Corrected LER 93-006-00:on 930324,determined That Svc Water Supply Piping to Switchgear Room Coolers X-181A & X-181B Did Not Meet TS Structural Integrity Requirements.Caused by Personnel Error.Clamp Installed + (08:55:07, 20 December 2024)
- ML20035H030 + (08:55:08, 20 December 2024)
- ML20035H029 + (08:55:10, 20 December 2024)
- ML20035H028 + (08:55:12, 20 December 2024)
- ML20035H027 + (08:55:13, 20 December 2024)
- ML20035H025 + (08:55:14, 20 December 2024)
- ML20035H024 + (08:55:15, 20 December 2024)
- ML20035H023 + (08:55:16, 20 December 2024)
- ML20035H022 + (08:55:17, 20 December 2024)
- ML20035H021 + (08:55:18, 20 December 2024)
- ML20035H020 + (08:55:19, 20 December 2024)
- ML20035H019 + (08:55:20, 20 December 2024)
- ML20035H018 + (08:55:21, 20 December 2024)
- ML20035H017 + (08:55:23, 20 December 2024)
- PY-CEI-NRR-1645, Forwards Perry Nuclear Power Plant Unit 1 Annual Environ Operating Rept Jan-Dec 1992 + (08:55:23, 20 December 2024)
- ML20035H013 + (08:55:26, 20 December 2024)
- ML20035H012 + (08:55:27, 20 December 2024)
- ML20035H011 + (08:55:28, 20 December 2024)
- ML20035H010 + (08:55:33, 20 December 2024)
- ML20035H008 + (08:55:34, 20 December 2024)
- ML20035H007 + (08:55:35, 20 December 2024)
- ML20035H006 + (08:55:36, 20 December 2024)
- TAC:M85603 + (08:55:37, 20 December 2024)
- ML20035H005 + (08:55:38, 20 December 2024)
- ML20035H004 + (08:55:42, 20 December 2024)
- ML20035H002 + (08:55:44, 20 December 2024)
- ML20035H001 + (08:55:45, 20 December 2024)
- ML20035G996 + (08:55:53, 20 December 2024)
- ML20035G995 + (08:55:54, 20 December 2024)
- BSEP-93-0060, Responds to NRC Re Violations Noted in Insp Repts 50-324/93-08 & 50-325/93-08.Corrective actions:PLP-20 Will Be Revised to Address Hydrostatic Test Requirements After Repairs/Replacements of FPS Components + (08:56:00, 20 December 2024)
- ML20035G993 + (08:56:02, 20 December 2024)
- ST-HL-AE-4418, Forwards Corrected Affidavit to Replace Wrong Affidavit Inadvertently Attached to 930416 Response to GL 92-08 + (08:56:08, 20 December 2024)
- ML20035G990 + (08:56:16, 20 December 2024)
- ML20035G989 + (08:56:17, 20 December 2024)
- ML20035G988 + (08:56:19, 20 December 2024)
- ML20035G987 + (08:56:20, 20 December 2024)
- ML20035G986 + (08:56:21, 20 December 2024)
- ML20035G984 + (08:56:22, 20 December 2024)
- ML20035G982 + (08:56:23, 20 December 2024)
- ML20035G981 + (08:56:24, 20 December 2024)
- ML20035G980 + (08:56:25, 20 December 2024)
- ML20035G978 + (08:56:27, 20 December 2024)
- ML20035G972 + (08:56:30, 20 December 2024)
- ML20035G970 + (08:56:31, 20 December 2024)