ML20035H019

From kanterella
Jump to navigation Jump to search
Special Rept 93-03:on 930322,auxiliary Bldg Fire Door A-41 Breached to Support Unit 1 Cycle 6 Refueling Outage Activities.Foreman Involved Counseled on Event & Informed of Expectations of Mgt to Fully Comply W/Ts Action Statements
ML20035H019
Person / Time
Site: Sequoyah 
Issue date: 04/27/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-03, 93-3, NUDOCS 9304300361
Download: ML20035H019 (3)


Text

-

......~.-

+.

.g

']

.I i

lL

^

~

IUA 1

i

.. ~... _. ~. _ _. -

. Tennessee Vaney Authonty Post Ofhte Box 2000 Soddy-Dasy. Tennessee 37379-2CfJO

~j l

t Robert.A. Fenech Vice Present Sequoyah Nuclea' Plant I

i April 27, 1993 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk

-l Washington, D.C. 20555 l

Gentlemen:

j l

In the Matter of

)

Docket No. 50-328 i

Tennessee Valley Authority

)

SEQUOYAH NUCLEAR' PLANT (SQN) - UNIT 2 - FACILITY OPERATING LICENSE DPR TECHNICAL SPECIFICATION (TS) 3.7.12 SPECIAL-REPORT 93-03 j

The enclosed special report provides details concerning a fire barrier i

being nonfunctional for a period greater than the technical specification.

(TS) allowable time frame. This report is-being submitted in accordance with TS Action Statement 3.7.12(a).

.i If you have any questions concerning th'is submittal, please telephone C. H. Whittemore at (615) 843-7210.

5 i

Sincerely, f

h.e I

Robert A. Fenech-ij Enclosure cc:

See page 2 I

300011 la ymmy p% l

y :..

t.-

U.S. Nuclear Regulatory Commission Page 2 April 27, 1993 cc (Enclosure):

Mr. D. E. LaBarge, Project Manager U.S. Nucicar Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvill', Maryland 20852-2739 e

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy Tennessee 37379-3624

^

-Regional Administrator U.S. Nucicar Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia.30323-2711 x

ENCLOSURE s.

SEQUOYAH NUCLEAR ~ PLANT UNIT 2 SPECIAL REPORT 93-03 FIRE DOOR A-41 Description of Event On: March 22, 1993, with Units 1 and 2 in Mode 5, auxiliary building Fire Door A-41 was breached to support the Unit 1 Cycle 6 refueling outage activities. Fire Door A-41 provides access to auxiliary building Room A-21, which previously contained the Unit 2 positive displacement charging pump. The room is currently empty and was being used.to rebuild seals for installation in the Unit 1 reactor coolant pumps. The door was breached to allow the routing of cables and high-efficiency particulate air filter hoses into the room. The door was breached in excess of the seven-day technical specification (TS) allowable time frame.

Cause of Condition The seal work was completed on Friday, March 26, 1993,'and all the cables and hoses were removed. However, the responsible foreman forgot to close the breach on Monday, March 29, 1993, because of involvement in other work activities.

Corrective Action The fire barrier was restored on April 1, 1993, at approximately 0900 Eastern standard time. The foreman involved was counseled on the event and informed of the expectations of management to fully comply with the TS action statements and requirements of the procedures governing fire barriers.