Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039B155 + (05:22:57, 20 December 2024)
- ML20039B154 + (05:22:57, 20 December 2024)
- 05000286/LER-1981-009, Forwards LER 81-009/03L-0 + (05:22:59, 20 December 2024)
- ML20039B151 + (05:23:00, 20 December 2024)
- ML20039B149 + (05:23:01, 20 December 2024)
- 05000318/LER-1981-051-03, /03L-0:on 811109,RCS Net Leakage Found to Be 2.1 Gpm.Caused by Crack Due to Vibrations in Weld on Adapter to Tubing on Reactor Coolant Pump Middle Seal Pressure Sensing Line.Engineering Evaluation Continuing + (05:23:02, 20 December 2024)
- ML20039B147 + (05:23:03, 20 December 2024)
- IR 05000285/1981019 + (05:23:05, 20 December 2024)
- ML20039B144 + (05:23:09, 20 December 2024)
- ML20039B142 + (05:23:10, 20 December 2024)
- ML20039B141 + (05:23:11, 20 December 2024)
- IR 05000133/1981004 + (05:23:13, 20 December 2024)
- 05000318/LER-1981-051, Forwards LER 81-051/03L-0 + (05:23:15, 20 December 2024)
- ML20039B137 + (05:23:16, 20 December 2024)
- ML20039B135 + (05:23:17, 20 December 2024)
- ML20039B133 + (05:23:18, 20 December 2024)
- ML20039B132 + (05:23:19, 20 December 2024)
- ML20039B131 + (05:23:20, 20 December 2024)
- AECM-81-481, Forwards Revised Process Control Program, in Response to Discussions W/Nrc & 811208 Telcon Re Proposed Program Changes.Revision Includes Instructions for Solidification of Radwaste Slurry & Evaporator Botton Concentrates + (05:23:21, 20 December 2024)
- 05000271/LER-1981-033-01, /01T-0:on 811125,reactor Bldg Roof Hatch Opened by Work Crew W/O Notice to Supervisor Until Fire Permit for Welding Requested.Caused by Personnel Error.Personnel Reinstructed Re Procedural Requirement + (05:23:23, 20 December 2024)
- ML20039B127 + (05:23:25, 20 December 2024)
- 05000271/LER-1981-033, Forwards LER 81-033/01T-0 + (05:23:26, 20 December 2024)
- ML20039B124 + (05:23:28, 20 December 2024)
- 05000245/LER-1981-036-03, /03L-0:on 811112,pressure Switch 2206-1621D Tripped Outside Allowable Band.Caused by Setpoint Drift. Switch Readjusted + (05:23:29, 20 December 2024)
- ML20039B121 + (05:23:31, 20 December 2024)
- ML20039B120 + (05:23:32, 20 December 2024)
- ML20039B119 + (05:23:33, 20 December 2024)
- 05000245/LER-1981-036, Forwards LER 81-036/03L-0.Detailed Event Analysis Encl + (05:23:34, 20 December 2024)
- ML20039B116 + (05:23:35, 20 December 2024)
- ML20039B115 + (05:23:36, 20 December 2024)
- 05000271/LER-1981-027-03, MSIV-80C Failed to Close on Receipt of Group 1 Isolation Signal During Reactor Scram. Caused by Actuator Failure.Actuator Completely Overhauled & Guide Rods,Spring Plate & Bushings Replaced + (05:23:37, 20 December 2024)
- ML20039B113 + (05:23:38, 20 December 2024)
- ML20039B111 + (05:23:40, 20 December 2024)
- ML20039B110 + (05:23:41, 20 December 2024)
- 05000271/LER-1981-027, Forwards Updated LER 81-027/03X-1 + (05:23:42, 20 December 2024)
- ML20039B107 + (05:23:43, 20 December 2024)
- 05000271/LER-1981-031-03, /03L-0:on 811109,setpoint of Standby Liquid Control Relief Valve Found to Exceed Tech Specs Range.Caused by Setpoint Drift Apparently Due to Crystallization of Sodium Pentaborate on Disc/Seat Interface + (05:23:44, 20 December 2024)
- ML20039B104 + (05:23:45, 20 December 2024)
- ML20039B103 + (05:23:46, 20 December 2024)
- ML20039B102 + (05:23:48, 20 December 2024)
- ML20039B099 + (05:23:49, 20 December 2024)
- ML20039B100 + (05:23:49, 20 December 2024)
- 05000271/LER-1981-031, Forwards LER 81-031/03L-0 + (05:23:51, 20 December 2024)
- ML20039B096 + (05:23:53, 20 December 2024)
- IR 05000206/1981039 + (05:23:54, 20 December 2024)
- ML20039B093 + (05:23:55, 20 December 2024)
- ML20039B091 + (05:23:56, 20 December 2024)
- ML20039B088 + (05:23:59, 20 December 2024)
- AECM-81-503, Forwards Response to Human Factors Engineering Branch Concerns Re Facility Control Room Review.Response to Remaining Open Items Will Be Submitted 60 Days Prior to Full Power OL Issuance + (05:24:00, 20 December 2024)
- ML20039B084 + (05:24:04, 20 December 2024)
- ML20039B083 + (05:24:05, 20 December 2024)