Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039C653 + (04:58:49, 20 December 2024)
- ML20039C652 + (04:58:51, 20 December 2024)
- ML20039C651 + (04:58:52, 20 December 2024)
- ML20039C650 + (04:58:53, 20 December 2024)
- ML20039C648 + (04:58:54, 20 December 2024)
- ML20039C646 + (04:58:55, 20 December 2024)
- ML20039C642 + (04:58:56, 20 December 2024)
- ML20039C644 + (04:58:56, 20 December 2024)
- ML20039C641 + (04:58:58, 20 December 2024)
- ML20039C638 + (04:58:59, 20 December 2024)
- ML20039C639 + (04:58:59, 20 December 2024)
- ML20039C637 + (04:59:00, 20 December 2024)
- ML20039C636 + (04:59:01, 20 December 2024)
- ML20039C633 + (04:59:05, 20 December 2024)
- ML20039C634 + (04:59:05, 20 December 2024)
- 05000267/LER-1981-072-03, /03L-0:on 811117,PCRV Rupture Disk M-11701 Setpoint Exceeded Tech Specs Limits.Caused by Belleville Washer Operating Point Drift.Disks Under Evaluation + (04:59:07, 20 December 2024)
- ML20039C631 + (04:59:08, 20 December 2024)
- ML20039C630 + (04:59:08, 20 December 2024)
- 05000267/LER-1981-072, Forwards LER 81-072/03L-0.Detailed Event Analysis Encl + (04:59:10, 20 December 2024)
- ML20039C627 + (04:59:12, 20 December 2024)
- 05000325/LER-1981-082-03, /03L-0:on 811124,during Plant Operation,Rod Drift Annunciator Received for Fully Withdrawn Control Rod 34-39. Probably Caused by Defective Rod Position Indication Probe Reed Switch + (04:59:13, 20 December 2024)
- 05000302/LER-1981-076-03, /03L-0:on 811205,reactor Protection Equipment NT-6 Would Not Properly Function During Shutdown Surveillance Activities,Contrary to Reg Guide 1.16.Caused by Relay Failure.Relay Replaced + (04:59:15, 20 December 2024)
- ML20039C624 + (04:59:16, 20 December 2024)
- ML20039C623 + (04:59:17, 20 December 2024)
- ML20039C622 + (04:59:18, 20 December 2024)
- 05000325/LER-1981-082, Forwards LER 81-082/03L-0 + (04:59:19, 20 December 2024)
- 05000302/LER-1981-076, Forwards LER 81-076/03L-0 + (04:59:21, 20 December 2024)
- ML20039C616 + (04:59:22, 20 December 2024)
- ML20039C617 + (04:59:22, 20 December 2024)
- ML20039C615 + (04:59:23, 20 December 2024)
- ML20039C614 + (04:59:24, 20 December 2024)
- ML20039C613 + (04:59:25, 20 December 2024)
- ML20039C611 + (04:59:26, 20 December 2024)
- ML20039C609 + (04:59:27, 20 December 2024)
- ML20039C608 + (04:59:28, 20 December 2024)
- ML20039C607 + (04:59:29, 20 December 2024)
- ML20039C606 + (04:59:30, 20 December 2024)
- ML20039C605 + (04:59:31, 20 December 2024)
- ML20039C604 + (04:59:32, 20 December 2024)
- ML20039C602 + (04:59:33, 20 December 2024)
- IR 05000335/1981033 + (04:59:34, 20 December 2024)
- ML20039C600 + (04:59:35, 20 December 2024)
- ML20039C598 + (04:59:39, 20 December 2024)
- 05000321/LER-1981-132-03, /03L-0:on 811201,discovered Tech Specs Revision Re Mod in G51 Torus Water Cleaning Sys Had Not Been Approved.Cause by Personnel Failure to Notify NRC of Proposed Revision Before Startup + (04:59:40, 20 December 2024)
- ML20039C595 + (04:59:42, 20 December 2024)
- ML20039C593 + (04:59:43, 20 December 2024)
- 05000321/LER-1981-132, Forwards LER 81-132/03L-0 + (04:59:46, 20 December 2024)
- ML20039C587 + (04:59:48, 20 December 2024)
- ML20039C588 + (04:59:48, 20 December 2024)
- 05000275/LER-1981-007-03, /03L-0:on 811125,discovered That Tech Specs Surveillance Requirement 4.11.2.4.1 Re Project Doses Due to Gaseous Releases from Plant Not Performed within Required Time Interval.Caused by Personnel Oversight + (04:59:50, 20 December 2024)
- IR 05000250/1981032 + (04:59:51, 20 December 2024)