Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20041A736 + (01:25:55, 20 December 2024)
- ML20041A735 + (01:25:56, 20 December 2024)
- ML20041A733 + (01:25:57, 20 December 2024)
- ML20041A727 + (01:25:58, 20 December 2024)
- IR 05000029/1982019 + (01:25:59, 20 December 2024)
- 05000324/LER-1982-003-03, /03L-0:on 820111,main Steam Line High Flow Channel C Would Not Actuate During Functional Test PT 2.1.17P.Caused by Melted Insulation from Relay Coil of Channel C Actuation Relay A71-k3C.Channel Tripped.Relay Replaced + (01:26:01, 20 December 2024)
- IR 05000369/1982001 + (01:26:03, 20 December 2024)
- 05000324/LER-1982-003, Forwards LER 82-003/03L-0 + (01:26:05, 20 December 2024)
- 05000311/LER-1982-002-03, /03L-0:on 820111,2A1 Battery Charger Tripped, Was Reset & Tripped Again.No Problem Found.Subsequent Trip Caused by Difference Between Battery Voltage & Battery Charger Voltage Setting.Personnel Instructed + (01:26:07, 20 December 2024)
- ML20041A719 + (01:26:08, 20 December 2024)
- ML20041A717 + (01:26:09, 20 December 2024)
- 05000311/LER-1982-003-03, /03L-0:on 820112,during Routine Calibr Testing, Radiation Monitor 2R11A Found Out of Calibr.Caused by Instrument Drift.Monitor Recalibr & Tested Satisfactorily + (01:26:10, 20 December 2024)
- 05000311/LER-1982-003, Forwards LER 82-003/03L-0.Detailed Event Analysis Encl + (01:26:15, 20 December 2024)
- 05000245/LER-1982-001-03, /03L-0:on 820115,while Performing Steam Line High Flow Functional Test,Switches 261-2B & 261-2D Failed to Trip at Desired Setpoint.Caused by Setpoint Drift.Switches Recalibr + (01:26:17, 20 December 2024)
- 05000325/LER-1982-004-03, /03L-0:on 820111,1-CAC-AR-1259 post-accident Monitoring Control Room Recorder/Indicator Exhibited Unvarying Indication of Drywell Oxygen Concentration.Caused by Broken Drive Cord Due to Normal Wear.Cord Replaced + (01:26:19, 20 December 2024)
- PNO-I-82-017, on 820212,facility Experienced Manual Trip from 100% Power Due to Low Steam Generator Level After Loss of Main Feed 22.Control Rod CEA-19 Freed by mag-jack Sequence on 820213.MSIV-21 Will Be Repaired During 10-day Outage + (01:26:21, 20 December 2024)
- 05000325/LER-1982-004, Forwards LER 82-004/03L-0 + (01:26:23, 20 December 2024)
- 05000245/LER-1982-001, Forwards LER 82-001/03L-0.Detailed Event Analysis Encl + (01:26:25, 20 December 2024)
- ML20041A703 + (01:26:26, 20 December 2024)
- 05000272/LER-1982-006-03, /03L-0:on 820113,air Particulate Detector Failed. Cause Not Stated.All Required Containment Purge & Pressure Vacuum Relief Penetrations Isolated.High & Low Speed Filter Paper Drives Replaced + (01:26:27, 20 December 2024)
- IR 05000395/1981032 + (01:26:32, 20 December 2024)
- 05000272/LER-1982-006, Forwards LER 82-006/03L-0.Detailed Event Analysis Encl + (01:26:34, 20 December 2024)
- ML20041A697 + (01:26:36, 20 December 2024)
- ML20041A696 + (01:26:37, 20 December 2024)
- 05000245/LER-1982-002-03, /03L-0:on 820115,B Emergency Svc Water Pump Declared Inoperable After Failure to Meet Min Pump Discharge Pressure.Caused by Marine Fouling of Pump Suction W/Possible Slippage of Second Stage Impeller to Pump Shaft + (01:26:41, 20 December 2024)
- 05000325/LER-1982-007-03, /03L-0:on 820115,during Operability Testing, Reactor Core Isolation Cooling Turbine Control Valve 1-E51-V9 Would Not Open or Close Fully,Preventing Proper Speed Control.Caused by Diode VR1 Shortening + (01:26:43, 20 December 2024)
- IR 05000424/1981015 + (01:26:45, 20 December 2024)
- 05000245/LER-1982-002, Forwards LER 82-002/03L-0.Detailed Event Analysis Encl + (01:26:47, 20 December 2024)
- 05000272/LER-1981-124-03, /03X-1:on 811123,undervoltage Relay on 2C Vital Bus Was Actuating at 35% Instead of 70% Trip Setpoint Value. Caused by Mechanical Sticking.Undervoltage Relay Cleaned & Tested + (01:26:52, 20 December 2024)
- 05000325/LER-1982-007, Forwards LER 82-007/03L-0 + (01:26:53, 20 December 2024)
- ML20041A681 + (01:26:54, 20 December 2024)
- 05000272/LER-1981-124, Forwards LER 81-124/03X-1.Detailed Event Analysis Encl + (01:26:58, 20 December 2024)
- ML20041A677 + (01:27:00, 20 December 2024)
- 05000328/LER-1982-009-03, /03L-0:on 820111,in Mode 1 at 8% Rtp,Steam Generator Blowdown Containment Isolation valve,2-FCV-1-7, Operator Diaphragm Ruptured Rendering Valve Inoperable. Caused by Normal Wear.Diaphragm Replaced + (01:27:01, 20 December 2024)
- IR 05000416/1982002 + (01:27:07, 20 December 2024)
- 05000328/LER-1982-009, Forwards LER 82-009/03L-0 + (01:27:08, 20 December 2024)
- ML20041A666 + (01:27:10, 20 December 2024)
- 05000260/LER-1982-003-03, /03L-0:on 820116,during Normal Operation,While Performing Surveillance test,PS-3-74A Switch 1 & PS-68-96 Switch 1,low Pressure Switches,Were Out of Tolerance by 4% & 6%.Caused by Instrument Drift.Switches Recalibr + (01:27:11, 20 December 2024)
- IR 05000267/1981027 + (01:27:14, 20 December 2024)
- ML20041A663 + (01:27:14, 20 December 2024)
- IR 05000518/1981024 + (01:27:16, 20 December 2024)
- 05000260/LER-1982-003, Forwards LER 82-003/03L-0 + (01:27:18, 20 December 2024)
- IR 05000267/1982027 + (01:27:20, 20 December 2024)
- ML20041A657 + (01:27:21, 20 December 2024)
- ML20041A655 + (01:27:22, 20 December 2024)
- ML20041A654 + (01:27:22, 20 December 2024)
- 05000335/LER-1982-004-03, /03L-0:on 820110,at 94% Power,Wide Range Nuclear Instrumentation Channel C Failed.Cause of Failure of Gamma Metrics RCS 200 Neutron Flux Monitor Cannot Be Determined During Power Operation Due to Inaccessibility + (01:27:23, 20 December 2024)
- ML20041A652 + (01:27:24, 20 December 2024)
- 05000335/LER-1982-004, Forwards LER 82-004/03L-0 + (01:27:26, 20 December 2024)
- 05000328/LER-1982-004-03, /03L-0:on 820115,vital Battery Bank II Cell Temp Found to Be Less than 60 F,Rendering Sys Inoperable.Caused by Two Exhaust Fan Dampers Open Simultaneously.One Damper Closed & Room Heat Increased + (01:27:27, 20 December 2024)
- ML20041A648 + (01:27:28, 20 December 2024)