ML20041A717

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/82-01 & 50-370/82-01 on 820111-15.No Noncompliance Noted
ML20041A717
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/29/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20041A718 List:
References
NUDOCS 8202220434
Download: ML20041A717 (2)


See also: IR 05000369/1982001

Text

{{#Wiki_filter:r e/hco ' .- - J AN 291982 m %a o Duke Power Company N-s ATTN: Mr. W. O. Parker, Jr. - ' Y ~ Vice President, Steam Production [ ,1 ' pg' i _ ii'gp _ P. O. Box 2178 -g ,t

e Charlotte, NC 28242

Gentlemen: .A Subject: Report NosM69/82-0Mnd 50-370/82-01 d' This refers to the routine safety inspection conducted by Mr. P. Burnett of this office on January 11-15, 1982, of activities authorized by NRC License No. NPF-9 and Construction Permit No. CPPR-84 for the McGuire facility and to the discus- sion of our findings held with Mr. M. D. McIntosh, Plant Manager, at the conclu- sion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations or deviations were disclosed. One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspections. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written appli- cation to withhold information contained therein within thirty days of the date of this letter. Such application must be consistent with the requirements of 2.790(b)(1). Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, s/ Paul J. Kellogg, Chief Reactor Projects Branch 2 Division of Resident and Reactor Project Inspection Enclosure: See Page 2 8202220434 820129 DRADOCK05000g [[

,- -- - - - - .- . . JAN 291982 Duke Power Company 2 Enclosure: Inspectico Report Nos. 50-369/82-01 and 50-370/82-01 cc w/ encl: M. D. McIntosh, Plant Manager J. T. Moore, Project Manager bcc w/ encl: NRC Resident Inspector Document Management Branch State of North Carolina l RII RII RII RII RII q PBurnett:ht FJape h CEMu phy AIfntois

PJK og /o(/82 1/pp 1/ft/87 14J782 Ig/82 }}