ML20041A655

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-518/81-24,50-519/81-24, 50-520/81-24 & 50-521/81-24 on 811201-31.No Noncompliance Noted
ML20041A655
Person / Time
Site: Hartsville  
Issue date: 01/27/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041A656 List:
References
NUDOCS 8202220385
Download: ML20041A655 (2)


See also: IR 05000518/1981024

Text

-

.

.

}/N Icto

.

JAf' 2 71992

,-

M

,f

gx

5

o

i

Tennessee Valley Authority

d .a[7F~ r

_

ATTri: fir. H. G. Parris

?

Manager of Power

d

L

500A Chestnut Street Tower 11

'\\

-

- '

Chattanooga, Tri 37401

n "f,~'/

Gentiemen:

Subject:

Report flos.M18/81-2M50-519/81-24, 50-520/81-24, and 50-521/81-24

This refers to the routine safety inspection conducted by Mr. J. F. Schapker of

this office on December 1-31, 1981, of activities authorized by flRC Construction

Permit flos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the Hartsville

facility and to the discussion of our findings held with fir. R. T. Hathcote,

Project !!anager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the flRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. Cantrell, Acting Chief

Reactor Project Branch 1

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report fios. 50-518/81-24

50-519/81-24, 50-520/81-24, and

50-521/81-24

cc's see page 2

8202220385 820127

PDR ADOCK 05000519

TEofs[

"""

(.

.

-

.-

_ _ .

\\

.

.

.

" 'I

Tennessee Valley Authority

2

,

cc w/ encl:

H. J. Green, Director of Nuclear Power

R. T. Hathcote, Project Manager.

J. F. Cox, Supervisor, Nuclear

Licensing Section

- J. E. Wills, Project Engineer

H. N. Culver, . Chief

Nuclear Safety Review Staff

bcc w/ encl:

HRC Resident Inspector

Document Management Branch

State of Tennessee

.

.

RI /

RIIlp

RII

H ilN:dt

.c er

F

rell

-1/f/82-

1/f /82

.1/A ~)/82

7