Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19294B531 + (13:23:47, 2 January 2025)
- ML19294B530 + (13:23:48, 2 January 2025)
- 05000302/LER-1980-007-03, /03L-0:on 800130,during Daily Plant Operating Surveillance SP-300,discovered Average Reactor Bldg Temp of 130.5F.Caused by Temp Transmitter CI-563-TT Being Stuck,Due to Operation Outside Design Temp Range + (13:23:50, 2 January 2025)
- 05000302/LER-1980-007, Forwards LER 80-007/03L-0 + (13:23:52, 2 January 2025)
- 05000346/LER-1980-010-01, /01T-0:on 800214,reanalysis of RCS Pipe Restraints Per IE Insp Rept 50-346/79-23 Revealed Design Deficiency on Two Reactor Coolant Hot Leg Pipe Whip Restraints at Top of Each RCS Hot Leg.Caused by Design Error + (13:23:54, 2 January 2025)
- ML19294B525 + (13:23:55, 2 January 2025)
- 05000346/LER-1980-010, Forwards LER 80-010/01T-0 + (13:23:56, 2 January 2025)
- ML19294B522 + (13:23:57, 2 January 2025)
- ML19294B521 + (13:23:58, 2 January 2025)
- 05000271/LER-1980-007-03, /03L-0:on 800128,while Performing Surveillance Testing of HPCI Sys,Governor Valve Remained Shut After Turbine Was Shut Down W/Auxiliary Oil Pump Running.Caused by Actuator Sticking + (13:23:59, 2 January 2025)
- ML19294B519 + (13:24:00, 2 January 2025)
- 05000271/LER-1980-007, Forwards LER 80-007/03L-0 + (13:24:01, 2 January 2025)
- ML19294B516 + (13:24:02, 2 January 2025)
- ML19294B512 + (13:24:04, 2 January 2025)
- ML19294B511 + (13:24:04, 2 January 2025)
- ML19294B510 + (13:24:05, 2 January 2025)
- ML19294B508 + (13:24:06, 2 January 2025)
- ML19294B509 + (13:24:06, 2 January 2025)
- ML19294B507 + (13:24:07, 2 January 2025)
- ML19294B506 + (13:24:08, 2 January 2025)
- ML19294B505 + (13:24:09, 2 January 2025)
- ML19294B504 + (13:24:10, 2 January 2025)
- ML19294B502 + (13:24:11, 2 January 2025)
- ML19294B500 + (13:24:13, 2 January 2025)
- ML19294B499 + (13:24:13, 2 January 2025)
- ML19294B497 + (13:24:14, 2 January 2025)
- ML19294B496 + (13:24:16, 2 January 2025)
- ML19294B495 + (13:24:17, 2 January 2025)
- ML19294B494 + (13:24:19, 2 January 2025)
- ML19294B492 + (13:24:20, 2 January 2025)
- ML19294B491 + (13:24:20, 2 January 2025)
- ML19294B490 + (13:24:21, 2 January 2025)
- 05000336/LER-1980-003-03, /03L-0:on 800122,during Routine Power Operation, Containment Air Temp Found in Excess of 120F Limit.Caused by Adjustments to Svc Water Temp Control Valve for Reactor Bldg Closed Cooling Water Sys.Valve Readjusted + (13:24:25, 2 January 2025)
- ML19294B488 + (13:24:29, 2 January 2025)
- 05000336/LER-1980-003, Forwards LER 80-003/03L-0 + (13:24:31, 2 January 2025)
- ML19294B485 + (13:24:32, 2 January 2025)
- ML19294B483 + (13:24:32, 2 January 2025)
- ML19294B481 + (13:24:33, 2 January 2025)
- ML19294B480 + (13:24:33, 2 January 2025)
- ML19294B479 + (13:24:34, 2 January 2025)
- ML19294B478 + (13:24:35, 2 January 2025)
- 05000298/LER-1980-004-03, /03L-0:on 800115,during Normal Operation, Discovered That RHR Valve M018 Was Inoperable.Caused by Failure of GE Relay Coil,Blowing Valve Control Circuit Fuse. Relay Coil Was Replaced & Correct Operation Verified + (13:24:36, 2 January 2025)
- 05000298/LER-1980-004, Forwards LER 80-004/03L-0 + (13:24:37, 2 January 2025)
- ML19294B474 + (13:24:39, 2 January 2025)
- 05000029/LER-1980-006-03, /03L-0:on 800126,while Performing Safety Injection Safety Valve Setpoint Check Procedure,Safety Valve Failed to Open.Caused by Dirty Internals.Safety Valve Was Disassembled,Cleaned & Successfully Tested + (13:24:41, 2 January 2025)
- 05000029/LER-1980-006, Forwards LER 80-006/03L-0 + (13:24:43, 2 January 2025)
- ML19294B470 + (13:24:45, 2 January 2025)
- 05000333/LER-1980-017-03, /03L-0:on 800130,drywell-to-torus Differential Pressure Did Not Meet 1.7 Psi Requirements of Tech Specs for Approx 1-h.Caused by Rapid Temp Decrease in Drywell Cooling Sys.Nitrogen Added,Restoring Pressure to Normal + (13:24:46, 2 January 2025)
- 05000333/LER-1980-017, Forwards LER 80-017/03L-0 + (13:24:48, 2 January 2025)
- ML19294B466 + (13:24:49, 2 January 2025)
- ML19294B465 + (13:24:50, 2 January 2025)