Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000267/LER-1980-013, Forwards LER 80-013/03L-0 + (10:29:51, 2 January 2025)
- 05000327/LER-1980-019, Forwards LER 80-019/01T-0 + (10:29:52, 2 January 2025)
- 05000259/LER-1980-024-03, /03L-0:on 800312,during Refueling Outage W/Units 2 & 3 Under Normal Operation,Nut Came Off Bracket Holding Insulated Communications Ground Wire Above Athens 161-K Line,Causing Fault Resulting in Trip of Breakers + (10:29:55, 2 January 2025)
- 05000259/LER-1980-025-03, /03L-0:on 800313,primary Containment Isolation Testing Revealed Failure of RHR Injection Valve 74-67 to Close Upon Isolation Signal.Caused by Limit Switch on FCV- 74-48 Not Making Good Contact.Contact Cleaned & Adjusted + (10:29:57, 2 January 2025)
- ML19305D800 + (10:29:58, 2 January 2025)
- ML19305D798 + (10:29:58, 2 January 2025)
- 05000334/LER-1980-018-01, /01T-0:on 800326,plant Operators Were Testing Temporary Fire Pump When Section of Fire Main Failed.Caused by Piping Failure.Failed Section of Piping Replaced + (10:30:00, 2 January 2025)
- 05000327/LER-1980-005-03, /03L-0:on 800311,while Performing SI-247.605, Reactor Solid State Protection Sys Was Placed in Input Inhibit Mode,Removing High Voltage from Source Range Channel N31.Caused by Removal of Fuses from Voltage Cut Out Relay + (10:30:01, 2 January 2025)
- 05000255/LER-1980-004, Forwards LER 80-004/01T-0 + (10:30:03, 2 January 2025)
- 05000334/LER-1980-017-01, /01T-0:on 800326,reanalysis of Seismic Pipe Stress of Main Steam Piping Inside Valve House for OBE long-term Criteria Showed,For Some Conditions,Allowable Stress Level May Be Exceeded in Headers for Main Steam Relief Valves + (10:30:05, 2 January 2025)
- 05000327/LER-1980-005, Forwards LER 80-005/03L-0 + (10:30:07, 2 January 2025)
- 05000304/LER-1980-014-03, /03L-0:on 800303,during Normal Operation,Maint Personnel Found Steam Generator Pressure Transmitter 2-PI-516 Had Shifted Low by 2%.Defective Fisher Porter Model 50EP1041 Bcxa Replaced & Channel Returned to Svc + (10:30:09, 2 January 2025)
- 05000259/LER-1980-024, Forwards LER 80-024/03L-0 + (10:30:10, 2 January 2025)
- 05000259/LER-1980-025, Forwards LER 80-025/03L-0 + (10:30:12, 2 January 2025)
- ML19305D785 + (10:30:14, 2 January 2025)
- 05000304/LER-1980-014, Forwards LER 80-014/03L-0 + (10:30:16, 2 January 2025)
- ML19305D781 + (10:30:17, 2 January 2025)
- 05000271/LER-1980-012-01, /01T-0:on 800328,during Seismic Analysis Required by IE Bulletin 79-14,discovered That Pipe Supports RHR-H-83 & RSW-H-168 May Be Inadequate to Support Seismic Loads. Caused by Deviations from Hanger Design Details + (10:30:18, 2 January 2025)
- ML19305D778 + (10:30:26, 2 January 2025)
- 05000271/LER-1980-012, Forwards LER 80-012/01T-0 + (10:30:27, 2 January 2025)
- ML19305D775 + (10:30:30, 2 January 2025)
- ML19305D774 + (10:30:31, 2 January 2025)
- 05000327/LER-1980-022, Forwards LER 80-022/03L-0 + (10:30:32, 2 January 2025)
- 05000265/LER-1980-008-03, /03L-0:on 800305,while Performing LPCI & Containment Cooling Modes,Two 5-S Delay Timers for Starting 1002D RHR Pump Failed to Actuate Timer Contacts.Caused by Microswitch Arm Being Out of Alignment + (10:30:35, 2 January 2025)
- IR 05000341/1980002 + (10:30:39, 2 January 2025)
- ML19305D769 + (10:30:40, 2 January 2025)
- ML19305D768 + (10:30:41, 2 January 2025)
- ML19305D767 + (10:30:43, 2 January 2025)
- ML19305D766 + (10:30:44, 2 January 2025)
- ML19305D765 + (10:30:45, 2 January 2025)
- ML19305D764 + (10:30:46, 2 January 2025)
- ML19305D763 + (10:30:48, 2 January 2025)
- ML19305D762 + (10:30:49, 2 January 2025)
- ML19305D760 + (10:30:50, 2 January 2025)
- 05000318/LER-1980-017-03, /03L-0:on 800316,saltwater Svc Water Heat Exchanger 22 Was Taken Out of Svc.Caused by Need to Repair Tube Leak.Tube Leak Found & Plugged + (10:30:51, 2 January 2025)
- ML19305D756 + (10:30:52, 2 January 2025)
- ML19305D754 + (10:30:58, 2 January 2025)
- 05000318/LER-1980-017, Forwards LER 80-017/03L-0 + (10:30:59, 2 January 2025)
- 05000265/LER-1980-008, Forwards LER 80-008/03L-0 + (10:31:01, 2 January 2025)
- 05000366/LER-1980-031-01, /01T-0:on 800327,during Performance of 18-month Tests on Station Battery Chargers 2A,2B & 2C,chargers Were Unable to Maintain Load Limits.Caused by Imbalanced Silicon Control Rectifiers & Maladjusted Current Limit Module + (10:31:03, 2 January 2025)
- ML19305D748 + (10:31:04, 2 January 2025)
- 05000304/LER-1980-013-03, /03L-0:on 800227,during Normal Operation,Maint Personnel Found Steam Generator Pressure Comparator 2PC-536A-B Shifted High by 1.5%.Caused by Defective Unit. Defective Unit Replaced W/Spare Unit + (10:31:05, 2 January 2025)
- 05000366/LER-1980-031, Forwards LER 80-031/01T-0 + (10:31:07, 2 January 2025)
- ML19305D744 + (10:31:08, 2 January 2025)
- ML19305D742 + (10:31:09, 2 January 2025)
- 05000304/LER-1980-013, Forwards LER 80-013/03L-0 + (10:31:10, 2 January 2025)
- ML19305D738 + (10:31:12, 2 January 2025)
- ML19305D739 + (10:31:12, 2 January 2025)
- ML19305D737 + (10:31:13, 2 January 2025)
- 05000254/LER-1980-008-03, /03L-0:on 800308,after Performing Preventive maint,1/2 Diesel Generator Would Not Start from Control Room.Caused by Poor Electrical Contact Between Fuse & Clip. Fuse Clip Adjusted + (10:31:15, 2 January 2025)
- 05000254/LER-1980-007-03, /03L-0:on 800308,while Performing Control Room Insp & Panel Check,B Main Steam Line Radiation Monitor Found Reading Low.Caused by Logarithmic Radiation Monitor Chassis Electronically Drifting Out of Calibr.Chassis Recalibr + (10:31:16, 2 January 2025)