Forwards IE Insp Rept 50-341/80-02 on 800121-23 & 0211-12 & Notice of Violation
ML19305D763
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/11/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19305D755 List:
References
800311, NUDOCS 8004150489
Download: ML19305D763 (2)


See also: IR 05000341/1980002

Text

.

l

>

pggg@@@N

"

O

!

L

MAR 11 %

i

t

!

l

Docket No. 50-341

The Detmit Edison Company

Attn: Mr. Edward Hines

Assistant Vice President

l

and Manager Quality Assurance

!

2000 Second Avenue

l

Detroit, Michigan 48226

l

!

Gentlemen:

j

This refers to the investigation conducted by Messrs. G. A. Phillip,

I. T. Yin and C. M. Erb of this office on January 21-23 and February 11-12,

l

1980, of activities at the Enrico Fermi 2 Nuclear Power Plant authorized

j

by NRC License No. CPPR-87 and to the discussion of our findings with you

l

and others at the conclusion of the lavestigation.

l

t

This investigation was conducted to determine the substance of an allega-

i

tion that the qualifications of, and the work perfonned by, personnel in

the site small bore pipe sipport design group were inadequate. The enclosed

copy of our investigation report identifies the areas examined during this

investigation. Within these amas, the investigation consisted of a

j

selective examination of records and procedures, observations and inter-

l

views with personnel.

-

During this investigation, certain of your activities appeared to be in

!

nor. compliance with MRC requirements, as described in the enclosed Appendix

'

',-

A.

t

This notice is sent to you pursuant to the provisions of Section 2.201

,

of the NRC's " Rules of Practice,' Part 2. Title 10. Code of Federal

!

Regulations. Section 2.201 requires you to signit to this office within

thirty days of your receipt of this notice a written statement er explana-

tion in reply, including for each item of noncompliance: (1) corrective

action taken and the results achieved; (2) corrective action to be taken

i

to avoid further noncospliance; and (3) the date when full compliance will

l

be achieved. In addition, your response should include the actions you

plan to take to verify that the small diameter piping already designed

and/or f astalled meets appropriate desispi specifications.

,

In accordance with Section 2.790 of the NRC's 'Aules of Practice," Part 2

Title 10. Code of Federal Regulations, a copy of this letter, the enclo-

sures, and your response to this letter will be placed in the IRC's Public

I

B004150Y-87

l

.

. -

,

.

,

.

The Detroit Edison Company

-2-

h\\

D

'

1 Jnftirhet on

'

Deciment Room, except as fb110ws. If the enclosures con

that you or your contractors believe to be proprietary, you mast apply

i

fa writing to this office, within twenty days of your receipt of this

l

1etter, to withhold such information from public disclosure. The applica-

tion must include a full statament of the reasons fbr which the inflernation

f

is considered proprietary, and should be prepared so that proprietary in-

i

fbreation identified in the application is contained in an enclosure to

!

the application.

r

We will gladly discuss any questions you have concerning this investiga-

!

tion.

'

Sincerely,

l

t

James G. Esppler

.

Director

i

,

!

Enclosures:

1. Appendix A, Notice of

Violation

2.

IE Investigation Raport

an. 50/341/80-02

cc w/ enc 1;

Cehtral Files

!

Reproduction Unit NRC 20b

PDR

,

Incal PDR

<

l

'

NSIC

TIC

Ronald Callen, Michigan Pablic

Service Comission

Eugene B. Thomas, Jr.,

Attorney