Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19305E854 + (10:14:39, 2 January 2025)
- ML19305E853 + (10:14:40, 2 January 2025)
- 05000304/LER-1977-069-03, During Operability Test PT-11,O-diesel Generator Tripped Due to Split Pipe Nipple. Caused by Cyclic Fatigue.Nipples Replaced W/Ss Fittings & Tubing Rerouted to Reduce Cyclic Fatigue + (10:14:41, 2 January 2025)
- ML19305E850 + (10:14:43, 2 January 2025)
- ML19305E851 + (10:14:43, 2 January 2025)
- ML19305E849 + (10:14:44, 2 January 2025)
- 05000304/LER-1977-069, Forwards Updated LER 77-069/03X-1 + (10:14:45, 2 January 2025)
- ML19305E845 + (10:14:47, 2 January 2025)
- ML19305E843 + (10:14:48, 2 January 2025)
- ML19305E841 + (10:14:48, 2 January 2025)
- ML19305E840 + (10:14:49, 2 January 2025)
- ML19305E839 + (10:14:50, 2 January 2025)
- ML19305E837 + (10:14:50, 2 January 2025)
- ML19305E835 + (10:14:54, 2 January 2025)
- 05000267/LER-1980-020, Forwards LER 80-020/03L-0 + (10:14:55, 2 January 2025)
- ML19305E832 + (10:14:57, 2 January 2025)
- ML19305E830 + (10:14:59, 2 January 2025)
- ML19305E829 + (10:15:00, 2 January 2025)
- ML19305E828 + (10:15:01, 2 January 2025)
- ML19305E827 + (10:15:02, 2 January 2025)
- ML19305E826 + (10:15:03, 2 January 2025)
- 05000298/LER-1980-009-03, /03L-0:on 800329,during Refueling outage,through- Wall Crack Discovered on Upstream Side of Isolation Valve to REC Noncritical Header.Cracked Weld Characteristic of Intergranular Stress Corrosion.Weld Will Be Repaired + (10:15:05, 2 January 2025)
- ML19305E824 + (10:15:07, 2 January 2025)
- 05000298/LER-1980-009, Forwards LER 80-009/03L-0 + (10:15:08, 2 January 2025)
- 05000266/LER-1980-006-03, /03L-0:on 800417,during Analysis of as-built safety-related Piping Sys Per IE Bulletin 79-14,overstressed Condition Discovered in Cooling Sys Piping.Caused by Lack of Support Between Valves Upstream of Juncture + (10:15:10, 2 January 2025)
- ML19305E819 + (10:15:17, 2 January 2025)
- 05000266/LER-1980-006, Forwards LER 80-006/03L-0 + (10:15:18, 2 January 2025)
- PNO-I-80-060, on 800417,Bechtel Advised Util That IE Bulletin 79-01B Pipe Break Analysis for HPCI Turbine Steam Supply Line Showed That Guillotine Break in Either Valve Isolation Rooms Adjacent to Drywell Would Overpressurize Room + (10:15:20, 2 January 2025)
- 05000327/LER-1980-036-03, /03L-0:on 800413,when Source Range N-31 Was Removed from Svc,Action Statement LCO 3.9.2 Was Initiated Due to Only One Source Range Channel Being in Svc.Caused by Need to Inspect for Possible Water Damage + (10:15:22, 2 January 2025)
- 05000318/LER-1980-023, Forwards LER 80-023/03L-0 + (10:15:24, 2 January 2025)
- ML19305E812 + (10:15:25, 2 January 2025)
- 05000327/LER-1980-036, Forwards LER 80-036/03L-0 + (10:15:26, 2 January 2025)
- ML19305E809 + (10:15:27, 2 January 2025)
- 05000327/LER-1980-033-03, /03L-0:on 800411,while Core Component Pot 1-A Was Removed from Svc & 1-B Placed in Svc W/Diesel Generator 1B Out of svc,1-B Was Being Powered from Inoperable Shutdown Board.Caused by Not Verifying Generator Operability + (10:15:29, 2 January 2025)
- ML19305E807 + (10:15:30, 2 January 2025)
- 05000327/LER-1980-033, Forwards LER 80-033/03L-0 + (10:15:31, 2 January 2025)
- 05000368/LER-1980-015-99, /99X-0:on 800129,during Recovery from Planned Transient,Rcs Depressurized to Min of 1,350 Psia.Caused by Pressurizer Spray Valve 2CV-4651 & Steam Dump & Bypass Valve 2CV-0301 Not Fully Closing on Demand.Valves Modified + (10:15:33, 2 January 2025)
- ML19305E803 + (10:15:34, 2 January 2025)
- 05000368/LER-1980-015, Forward LER 80-015/99X-0 + (10:15:35, 2 January 2025)
- ML19305E799 + (10:15:36, 2 January 2025)
- 05000259/LER-1980-033-03, /03L-0:on 800417,during Normal operation,480-volt Reactor Motor Operated Valve Board 1E Tripped & Locked Out on Overcurrent.Caused by Short Circuit on Hot Side of Spare Breaker Compartment 3A.Breaker Changed + (10:15:37, 2 January 2025)
- 05000318/LER-1980-026-03, /03L-0:on 800428,pressurizer Level Control Channels LT-110X & LT-110Y Were Removed from Svc After Erratic Changes in Pressurizer Level Occurred.Caused by Leaking Drain Valves in Transmitter 2-LT-110Y.Valves Shut + (10:15:39, 2 January 2025)
- PNO-I-80-065, on 800425,plant Employee Left Work Station to See Nurse About Injury.Employee Was Later Found Asleep in Car After Checks to Locate Whereabouts.Individual Was Fired But Refused to Leave Site & Had to Be Escorted + (10:15:41, 2 January 2025)
- 05000259/LER-1980-033, Forwards LER 80-033/03L-0 + (10:15:43, 2 January 2025)
- PNO-I-80-064, on 800424,util Notified NRC That 10% company- Wide Reduction in Work Force Is Being Considered.Cause Not Stated.Various Options Will Be Discussed Prior to Implementation + (10:15:45, 2 January 2025)
- 05000318/LER-1980-026, Forwards LER 80-026/03L-0 + (10:15:46, 2 January 2025)
- ML19305E790 + (10:15:47, 2 January 2025)
- ML19305E787 + (10:15:48, 2 January 2025)
- ML19305E784 + (10:15:51, 2 January 2025)
- ML19305E783 + (10:15:52, 2 January 2025)
- ML19305E782 + (10:15:53, 2 January 2025)