Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309C410 + (08:30:41, 2 January 2025)
- 05000325/LER-1980-015, Forwards LER 80-015/03L-0 + (08:30:44, 2 January 2025)
- ML19309C405 + (08:30:46, 2 January 2025)
- ML19309C403 + (08:30:47, 2 January 2025)
- ML19309C404 + (08:30:47, 2 January 2025)
- ML19309C402 + (08:30:48, 2 January 2025)
- ML19309C400 + (08:30:49, 2 January 2025)
- 05000348/LER-1980-020-03, /03L-0:on 800303,inaccurate Pressure Signal Noted from PT-494,1C S/G Pressure Transmitter.Caused by Frozen Sensing Line Due to Abnormally Cold Weather & Insufficient Protection.Sensing Line Thawed & Channel Check Performed + (08:30:51, 2 January 2025)
- ML19309C398 + (08:30:52, 2 January 2025)
- ML19309C397 + (08:30:53, 2 January 2025)
- 05000010/LER-1980-001-03, /03L-0:on 800303,capacity in Unit 1 Fire Pump Found to Be in Need of Updating in Order to Be Equal to Unit 2/3 Fire Pump.Commitment Made to NRC to Increase Capacity.New Fire Pump Will Be Installed + (08:30:54, 2 January 2025)
- ML19309C394 + (08:30:55, 2 January 2025)
- 05000348/LER-1980-022-03, /03L-0:on 800303,during Performance of FNP-1-STP-16.7,discharge Valve to Containment Spray Header Did Not Open as Required.Cause Not Determined.Problem Did Not Reoccur W/Testing.Surveillance Test Completed + (08:30:56, 2 January 2025)
- ML19309C392 + (08:30:57, 2 January 2025)
- ML19309C391 + (08:30:59, 2 January 2025)
- 05000010/LER-1980-001, Forwards LER 80-001/03L-0 + (08:31:00, 2 January 2025)
- ML19309C386 + (08:31:01, 2 January 2025)
- ML19309C387 + (08:31:01, 2 January 2025)
- 05000338/LER-1980-033-03, /03L-0:on 800303,during Monthly Verification of Proper Auxiliary Feedwater Sys Valve Lineup,Discovered That Position of Valve MOV-FW100B as Written in Procedure Was Incorrect.Caused by Typographical Error in Procedure + (08:31:03, 2 January 2025)
- 05000338/LER-1980-033, Forwards LER 80-033/03L-0 + (08:31:04, 2 January 2025)
- 05000327/LER-1980-008-03, /03L-0:on 800303,cooling Tower Blowdown Effluent Line Flow Monitor O-FR-27-175 Was Declared Inoperable.Flow Monitor Consistently Indicated Higher Flowrate than Actually Existed.Cause Unknown.Different Instrument to Be Instal + (08:31:06, 2 January 2025)
- ML19309C380 + (08:31:08, 2 January 2025)
- ML19309C379 + (08:31:09, 2 January 2025)
- 05000327/LER-1980-008, Forwards LER 80-008/03L-0 + (08:31:10, 2 January 2025)
- ML19309C376 + (08:31:11, 2 January 2025)
- EPID:L-2019-TOP-0042 + (08:31:12, 2 January 2025)
- 05000267/LER-1980-011-03, /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys + (08:31:13, 2 January 2025)
- ML19309C372 + (08:31:14, 2 January 2025)
- ML19309C371 + (08:31:15, 2 January 2025)
- 05000317/LER-1980-002-04, /04T-0:on 800322,instantaneous Hourly Average for Condenser Temp Rise Observed in Excess of Tech Spec Limit. Caused by Operator Inattention to Temp Rise Across Condenser & Environ Conditions + (08:31:16, 2 January 2025)
- ML19309C368 + (08:31:17, 2 January 2025)
- 05000267/LER-1980-011, Forwards LER 80-011/03L-0 + (08:31:19, 2 January 2025)
- ML19309C365 + (08:31:20, 2 January 2025)
- ML19309C364 + (08:31:21, 2 January 2025)
- 05000317/LER-1980-002, Forwards LER 80-002/04T-0 + (08:31:22, 2 January 2025)
- ML19309C360 + (08:31:23, 2 January 2025)
- ML19309C359 + (08:31:24, 2 January 2025)
- 05000029/LER-1980-009-03, /03L-0:on 800307,during Maint Outage in Mode 5 While Performing Safety Injection Time Delay Verification procedure,TDC2 Setpoint Found Out of Tech Spec Limit.Caused by Setpoint Drift.Relay Adjusted to within Tech Spec Limit + (08:31:26, 2 January 2025)
- ML19309C357 + (08:31:27, 2 January 2025)
- ML19309C355 + (08:31:27, 2 January 2025)
- ML19309C353 + (08:31:28, 2 January 2025)
- 05000029/LER-1980-009, Forwards LER 80-009/03L-0 + (08:31:29, 2 January 2025)
- 05000318/LER-1980-013-03, /03L-0:on 800303,channel Zf Pressure Input Signal for Steam Generator Isolation 22 Was Bypassed.Caused by Signal Isolater 2-E/E-1023C Being Out of Calibr Due to Nonlinear Response + (08:31:31, 2 January 2025)
- 05000133/LER-1980-002-03, /03L-0:on 800310,while in Cold Shutdown for Refueling & Seismic Mods,Fossil Unit Trip Test Was Not Performed within Allowable Interval.Caused by Present Status Being Unresolved.Test Will Be Performed Prior to Startup + (08:31:33, 2 January 2025)
- ML19309C348 + (08:31:34, 2 January 2025)
- 05000133/LER-1980-002, Forwards LER 80-002/03L-0 + (08:31:37, 2 January 2025)
- 05000318/LER-1980-013, Forwards LER 80-013/03L-0 + (08:31:39, 2 January 2025)
- ML19309C342 + (08:31:40, 2 January 2025)
- 05000155/LER-1980-005-03, /03L-0:on 800301,following Several Intermittent Automatic Test Circuit Alarms,Sensor Channel D of Reactor Depressurizing Sys Removed from Svc.Caused by Setpoint Drift on Transmitter LT-3183.Transmitter Vented & Returned to S + (08:31:43, 2 January 2025)
- ML19309C338 + (08:31:44, 2 January 2025)
- ML19309C337 + (08:31:48, 2 January 2025)