Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-31174, Application for Amend to License NPF-47,revising License Condition 2.C.14,Attachment 5 Re Emergency Response Capabilities,Requiring Implementation of Reg Guide 1.97 Mods to Neutron Monitoring Sys + (05:37:15, 2 December 2024)
- ML20245L816 + (05:37:18, 2 December 2024)
- ML20245L811 + (05:37:20, 2 December 2024)
- ML20245L809 + (05:37:22, 2 December 2024)
- ML20245L802 + (05:37:33, 2 December 2024)
- ML20245L801 + (05:37:35, 2 December 2024)
- 05000260/LER-1989-002-01, :on 890120,determined That Existing Support Design for Automatic Depressurization Sys Air Accumulator Pressure Switches Not Seismically Qualified.Design Practices Has Changed Since Const of Plant + (05:37:40, 2 December 2024)
- ML20245L796 + (05:37:44, 2 December 2024)
- ST-HL-AE-3201, Forwards Amended Preservice Insp Summary Rept for Class 1, Class 2 & Class 3 Component Supports at South Texas Project Electric Generating Station,Unit 2 + (05:37:47, 2 December 2024)
- ML20245L791 + (05:37:52, 2 December 2024)
- ML20245L790 + (05:37:54, 2 December 2024)
- TXX-8943, Absplemental Deficiency Rept CP-88-09 Re Overloading & Absence of Backup Protection Devices for Electrical Penetrations.Initially Reported on 880111.Purpose of Supplemental Rept to Revise Corrective Action Schedule + (05:37:56, 2 December 2024)
- ML20245L785 + (05:37:58, 2 December 2024)
- ML20245L772 + (05:38:05, 2 December 2024)
- ML20245L771 + (05:38:06, 2 December 2024)
- ML20245L765 + (05:38:10, 2 December 2024)
- ML20245L761 + (05:38:12, 2 December 2024)
- ST-HL-AE-3205, Forwards Vols 1 & 2 of Amended Preservice Insp Summary Rept for Class 1 & Class 2 Pressure Retaining Components... Re Completion of Exams Required by ASME Section XI Code for Welds in Class 1 & 2 Components & Augmented Insp Program + (05:38:14, 2 December 2024)
- 05000260/LER-1989-016-01, :on 890530,determined That 480 Volt Shutdown Board 2A Not Maintained in Seismically Qualified Configuration.Caused by Personnel Error.Conduct of Operations Instruction Revised + (05:38:18, 2 December 2024)
- ML20245L755 + (05:38:21, 2 December 2024)
- ML20245L754 + (05:38:23, 2 December 2024)
- ML20245L753 + (05:38:24, 2 December 2024)
- ML20245L751 + (05:38:26, 2 December 2024)
- ML20245L749 + (05:38:30, 2 December 2024)
- ML20245L748 + (05:38:31, 2 December 2024)
- ML20245L747 + (05:38:33, 2 December 2024)
- ML20245L740 + (05:38:37, 2 December 2024)
- 05000382/LER-1989-010, :on 890520,determined That Low Recirculation Flow Not Included in Pump Operability Which Resulted in Noncompliance W/Tech Spec 4.0.5.Caused by Miscommunication. Procedures Revised + (05:38:45, 2 December 2024)
- ML20245L738 + (05:38:47, 2 December 2024)
- ML20245L737 + (05:38:48, 2 December 2024)
- ML20245L734 + (05:38:50, 2 December 2024)
- ML20245L733 + (05:38:53, 2 December 2024)
- ML20245L729 + (05:38:55, 2 December 2024)
- ML20245L728 + (05:38:56, 2 December 2024)
- ML20245L725 + (05:38:59, 2 December 2024)
- ML20245L721 + (05:39:04, 2 December 2024)
- ML20245L720 + (05:39:06, 2 December 2024)
- NL-89-593, Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request + (05:39:07, 2 December 2024)
- ML20245L713 + (05:39:12, 2 December 2024)
- ML20245L710 + (05:39:15, 2 December 2024)
- ML20245L709 + (05:39:18, 2 December 2024)
- ML20245L707 + (05:39:21, 2 December 2024)
- ST-HL-AE-3190, Advises That Util Will Submit Tech Spec Changes to Meet Generic Ltr 88-16 Requirements by 890915.Draft of Unit 2 Cycle 1 Core Operating Limits Rept & Changes to Amends 1 & 9 to Licenses NPF-76 & NPF-80 Encl + (05:39:22, 2 December 2024)
- ML20245L698 + (05:39:26, 2 December 2024)
- ML20245L695 + (05:39:27, 2 December 2024)
- ML20245L693 + (05:39:29, 2 December 2024)
- AECM-89-0147, Forwards Application for Amend to License NPF-29,requesting Approval for Entergy Operations,Inc to Assume Mgt & Operating Responsibility for Facility + (05:39:31, 2 December 2024)
- 05000325/LER-1989-011, :on 890404,determined That Reactor Jet Pump Once Per 24 H Operability Surveillance Had Been Missed Prior to Entering Operation Condition 2.Caused by Inadequate Review of Surveillance Rept + (05:39:35, 2 December 2024)
- IR 05000344/1989014 + (05:40:16, 2 December 2024)
- ML20245L684 + (05:40:18, 2 December 2024)
- ML20245L683 + (05:40:21, 2 December 2024)